GA MECHANICAL INC
UEI: TF4YAMYS5LX4
$12.2M
Obligations · USAspending
Actions Aug '17 – Sep '21
3
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Top agencies
By obligations · USAspending, all years
- Department of Defense$12.2M · 3 awards
Top NAICS
By obligations · USAspending, all years
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| W56ZTN21C0004 | Department of the Army | 09/01/2021 | $9.7M |
| W50S8221P0003 | Department of the Army | 02/24/2021 | $10K |
| W56ZTN17P0013 | Department of the Army | 08/18/2017 | $2.5M |
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$1.2M
Received · FY2025–FY2027
$1.2M
Received · all years
3
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| STAMPEDE VENTURES, INC. | $1.2M |
Most recent
- $351K• ALL WATER METERS, ALONG WITH THE NECESSARY PIPING AND ASSOCIATED APPURTENANCES REQUIRED FOR A FULLY FUNCTIONAL WATER METERING SYSTEM, SHALL BE INSTALLED BY A LICENSED PLUMBER. • ALL MATERIALS UTILIZED FOR THE RETROFIT AND INSTALLATION OF NEW WATER METERS SHALL BE CERTIFIED LEAD-FREE AND CONFORM TO NSF STANDARDS AND THE REQUIREMENTS OF THE SAFE DRINKING WATER ACT. • INSTALL THE METER UPSTREAM OF THE BACKFLOW PREVENTER OR NEAR THE WATER SERVICE ENTRY POINT INTO THE BUILDING. • IF EXISTING METER IS IN PLACE, REMOVE FROM SERVICE & DISPOSE. • MODIFY THE LOCATION AS NEEDED TO PROVIDE FUNCTIONAL AND PROPER CONNECTIONS FOR THE NEW METER PER METER SPECIFICATIONS AND REQUIREMENTS. • COORDINATE AND PERFORM SHUT DOWN AND DE-ENERGIZATION OF WATER LINE TO REPLACE MAIN WATER SHUT OFF VALVES. • ONCE ALL METERS ARE INSTALLED, SUBMIT COMPREHENSIVE CAD LAYOUT DRAWINGS, INSTALLATION PHOTOS, EQUIPMENT CATALOGS, AND DATA SHEETS, ALONG WITH ALL PROJECT CLOSEOUT DOCUMENTATION.
- $749KPROJECT MANAGEMENT A. ALL INSPECTIONS AND PROJECT SUPERVISION TO BE HANDLED DIRECTLY BY G.A. MECHANICAL B. G.A. MECHANICAL TO COMMUNICATE DIRECTLY WITH COR AND ANY/ALL OTHER GOVERNMENT ENTITIES INVOLVED IN THE PERFORMANCE OF ALL TASKS LISTED BELOW C. G.A. MECHANICAL TO MAINTAIN CORRESPONDENCE WITH WES KEITHLEY FOR ANY I. COORDINATION AND IMPLEMENTATION II. SCHEDULING AND CHANGES III. WATER SERVICE OUTAGE NOTIFICATIONS IV. TRAFFIC CONTROL AND IMPACT NOTIFICATIONS V. OTHER ISSUES OR CONCERNS THAT ARISE DURING SHUT DOWNS OR SUBSEQUENT PERFORMANCE VI. REPORTING PROJECT PROGRESS 3. PRELIMINARY A. PROVIDE DFOW SPECIFIC AHAS B. PROVIDE SUBMITTALS AND RECEIVE APPROVAL 4. VALVE REPLACEMENT / INSTALLATION A. SOW THE SAME OR SIMILAR FOR ALL SIZES OF VALVES B. OBTAIN EXCAVATION PERMIT C. SUBMIT MISS UTILITY LOCATE REQUEST D. MAKE DETERMINATION CONCERNING PROPER MECHANIZED OR OTHER EQUIPMENT REQUIRED TO PERFORM EXCAVATION E. SUBMIT RWR AND RECEIVE CONFIRMATION AND APPROVAL F. OBTAIN AND CONFIRM UXO SUPPORT (AS REQUIRED) AND WORK WITH UXO CONTRACTOR TO ENSURE PROPER SUBMISSION OF ADDENDUM G. CONFIRM SCHEDULING WITH COR H. COORDINATE AND PERFORM SHUT DOWN AND DE-ENERGIZATION OF WATER LINE I. DETERMINE VALVES TO SHUT AND CONFIRM OPERATIONAL 1. GATHER DATA FROM AVAILABLE MAPS 2. COORDINATE WITH COR AND DPW TO OBTAIN MAPS AND DRAWINGS OF WIDER AREA AND TO ASSIST IN IDENTIFYING VALVES REQUIRED TO ISOLATE SECTION II. SUBMIT OUTAGE NOTIFICATION REQUEST DETAILING DATE, TIME, AND BUILDINGS IMPACTED 1. TEST AND CONFIRM SHUT DOWN PRIOR TO SCHEDULING FOR VALVE REPLACEMENT A. MAY REQUIRE A WATER SERVICE OUTAGE NOTIFICATION REQUEST IN ORDER TO TEST VALVES B. MAY REQUIRE TESTING VALVES AND CONFIRMING SHUT DOWN AFTER HOURS OR OUTSIDE OF NORMAL BUSINESS HOURS 2. SUBMIT REQUEST AND WORK WITH COR TO CONFIRM ABILITY TO SHUT DOWN SERVICE TO IMPACTED BUILDINGS 3. CONTRACTOR TO PROVIDE MINIMUM OF 2 WEEKS NOTICE FOR OUTAGE NOTIFICATION 4. WATER SERVICE OUTAGE TO BE APPROVED IF MINIMUM OF 2 WEEKS NOTICE HAS BEEN PROVIDED BY CONTRACTOR III. OPERATE VALVES TO SHUT DOWN WATER MAINS AND SERVICES AND CONFIRM ZERO ENERGY AT VALVE(S) BEING REPLACED/INSTALLED IV. FOLLOW LOTO PROCEDURES I. EXCAVATE TO EXPOSE EXISTING VALVE AND CORRESPONDING FITTINGS TO BE REPLACED J. EXCAVATION, CHLORINATION, AND FLUSHING OR DE-ENERGIZED WATER LINES TO FOLLOW I. COR MAY APPROVE TO FOLLOW APG GROUP 1 FACILITIES - FIELD WORK VARIANCE K. PROVIDE AND PLACE SHORING AS REQUIRED FOR SAFE ENTRY AND WORK IN TRENCH L. DISCONNECT, CUT, AND REMOVE EXISTING VALVE FROM TRENCH AND FROM SITE M. FOLLOW SUBMITTED DEWATERING PLAN N. PROVIDE AND INSTALL NEW MJ GATE VALVE AND MAKE CONNECTIONS WITH APPROVED, DOMESTIC FITTINGS AND RETAINING STYLE GLANDS FOLLOWING HARFORD COUNTY SPECIFICATIONS O. PROVIDE AND INSTALL UP TO 6’ OF DUCTILE IRON PIPE FOLLOWING HARFORD COUNTY SPECIFICATIONS P. PROVIDE AND INSTALL MJ FITTINGS OR OTHER APPROVED FITTINGS TO MAKE CONNECTION BETWEEN NEW VALVE AND EXISTING PIPING AS PROVIDED IN SUBMITTAL PACKAGE Q. INSTALL BLOCKING UNDER NEW VALVE PER MANUFACTURER AND HARFORD COUNTY SPECIFICATIONS R. PROVIDE AND BACKFILL WITH #57 UNDER ALL NEW PIPE, FITTINGS, AND VALVES S. BACKFILL TO 3” ABOVE NEW PIPE WITH #57 STONE T. BACKFILL REMAINING TRENCH WITH EXCAVATED MATERIAL AND COMPACT IN 12” LIFTS TO EFFECTIVELY PREVENT SETTLING U. OPEN VALVES TO PLACE WATER DISTRIBUTION SYSTEM BACK IN FULL SERVICE (RESTORE TO SAME CONDITION AS PRIOR TO SHUT DOWN) V. PROVIDE AND INSTALL NEW ROADWAY VALVE BOX COMPLETE FOLLOWING HARFORD COUNTY SPECIFICATIONS W. BACKFILL TO MATCH EXISTING GRADE WITH EXCAVATED MATERIAL 5. SURFACE RESTORATION A. GRASS AREAS I. FINE GRADING AREA AND RAKING TO REMOVE LARGE STONES FROM SURFACE II. PROVIDE AND PLACE UP 3” OF TOPSOIL IN AREA UP TO 100 SQUARE FEET III. COVER AFFECTED AREA WITH APPROVED, NATIVE GRASS SEED AND STRAW B. CONCRETE REPLACEMENT UP TO 250 SQUARE FEET I. ALL NEW VALVES TO HAVE 2’X2’ CONCRETE PAD AROUND ALL NEW ROADWAY VALVE BOXES II. REQUIRED PREPARATION TO INCLUDE
- $77KA. FURNISH AND INSTALL (1) 6X6 PRESSURE TREATED LUMBER. CUSTOMER TO PROVIDE EXACT LOCATION. OTHERS TO REINSTALL REFLECTOR. TASK 2.2P2 IN PART. B. FURNISH SONOTUBE AND POUR CONCRETE BASE AS SPECIFIED IN TASK 2.2P4. CUSTOMER TO PROVIDE EXACT LOCATION AND OTHERS RESPONSIBLE FOR ANY HARDWARE OR MOUNTING. C. FURNISH SONOTUBE AND POUR CONCRETE BASE FOR POLE AS DESCRIBED IN TASK 2.2P5. CUSTOMER TO PROVIDE EXACT LOCATION AND OTHERS RESPONSIBLE FOR ANY CONDUIT AND ANY HARDWARE OR MOUNTING. D. PERFORM PAVING AS DESCRIBED IN TASK 3/ TO INCLUDE DEEPER BASE IF REQUIRED. E. DEMOLISH AND REMOVE EXISTING ASPHALT AND BROKEN UP ROADWAY FROM 20’ INSIDE FENCE THROUGH T INTERSECTION OUTSIDE OF FENCE. REGRADE SUB-BASE AS REQUIRED. PROVIDE AND PLACE BASE LAYER OF ASPHALT AND LEAVE OPEN FOR NEW SENSOR LOOP. TASK 1/ F. REMOVAL OF EXISTING CONCRETE WALKWAY IN FRONT OF BUILDING AND INSTALLATION OF NEW ADA COMPLIANT CONCRETE WALKWAY. TASK 5/ P2 ENTRY WALK. G. REMOVAL OF SIDE 42” WIDE SIDE WALKWAY (LEFT SIDE OF BUILDING AS FACING) THAT IS PARTIALLY BELOW GRADE INSTALLATION OF NEW 48” WIDE SIDEWALK TO MATCH SURROUNDING GRADE (NOT ADA COMPLIANT). H. REPLACEMENT OF (1) SECTION OF SIDEWALK (RIGHT SIDE OF BUILDING AS FACING) REQUIRED DUE TO TRENCHING FOR NEW CONDUIT. I. TRENCHING AS REQUIRED FOR INSTALLATION OF UP TO (2) 2” CONDUIT FROM (3) ENTRANCE DOORWAYS TO EXTEND TO EXISTING GATE. J. BACKFILLING TRENCH AFTER INSTALLATION OF CONDUIT BY OTHERS. K. ALL CONDUIT TO BE PROVIDED AND INSTALLED BY OTHERS. L. SURFACE RESTORATION TO INCLUDE GRASS SEED AND STRAW AT ALL AREAS AFFECTED BY TRENCHING, CONCRETE REPLACEMENT, AND PAVING REPLACEMENT AS DESCRIBED ABOVE.