Awarding Agency
Sub-Agency
Department of the Army
Start Date
September 5, 2025
End Date
September 18, 2026
NAICS
PSC
Y1JZ
Transactions (1)
| Date | Mod # | Obligation |
|---|---|---|
| Sep 5, 2025 | 0 | +$490,884 |
Subcontractors 1$351,225 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI TF4YAMYS5LX4 • all water meters, along with the necessary piping and associated appurtenances required for a fully functional water metering system, shall be installed by a licensed plumber.
• all materials utilized for the retrofit and installation of new water meters shall be certified lead-free and conform to nsf standards and the requirements of the safe drinking water act.
• install the meter upstream of the backflow preventer or near the water service entry point into the building.
• if existing meter is in place, remove from service & dispose.
• modify the location as needed to provide functional and proper connections for the new meter per meter specifications and requirements.
• coordinate and perform shut down and de-energization of water line to replace main water shut off valves.
• once all meters are installed, submit comprehensive cad layout drawings, installation photos, equipment catalogs, and data sheets, along with all project closeout documentation. | $351,225 |