FedOps logoFedOps

JR & CO INC

UEI: EEV2NLW4F6C3
Browse awards
$50.5M
Obligations · USAspending
Actions Sep '17 – Jun '26
63
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Jun '27
Period of performance through

Top agencies

By obligations · USAspending, all years

Top NAICS

By obligations · USAspending, all years

  • 238160 Roofing Contractors$50.5M

Recent awards

Latest contract actions by start date · USAspending

AwardAgencyStartAmount
W91QF426FA131Department of the Army06/10/2026$10K
W91QF426FA114Department of the Army06/09/2026$56K
W91QF426FA069Department of the Army04/07/2026$1.3M
W91QF426FA041Department of the Army03/17/2026$178K
W91QF426FA038Department of the Army03/03/2026$62K
W91QF426FA039Department of the Army02/05/2026$209K
W91QF426FA040Department of the Army02/05/2026$49K
W91QF425FA198Department of the Army09/30/2025$168K
W91QF425FA190Department of the Army09/17/2025$1.6M
W91QF425FA129Department of the Army07/10/2025$244K

Expiring contracts

Period of performance ending in the next 18 months · USAspending

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$5.1M
Received · FY2025–FY2027
$5.1M
Received · all years
2
Subawards
2
Primes

Top primes

Prime contractorTotal
STAMPEDE VENTURES, INC.$3.9M
WESTON SOLUTIONS INC$1.2M

Most recent

  • 03/13/2026 STAMPEDE VENTURES, INC. · W9127826FA040 · Department of Defense (DOD)
    SCOPE OF WORK: 2 PLY SBS MODIFIED BITUMEN MODIFIED BITUMEN ROOFING SYSTEM 1. SET-UP STAGING AREA FOR ROOFING AS AGREED UPON SUBCONTRACTOR AND CONTRACTOR. 2. PROVIDE ALL NECESSARY PROTECTION NEEDED TO GUARD STRUCTURES FROM THE EXECUTION OF OUR WORK. 3. SET UP ALL REQUIRED SAFETY AS REQUIRED BY OSHA. 4. REMOVE AND DISPOSE OF EXISTING ROOFING SYSTEM DOWN TO STEEL DECKING AS REQUIRED TO ALLOW THE APPLICATION OF THE PROPOSED ROOFING SYSTEM. 5. FURNISH AND INSTALL VAPOR BARRIER DIRECTLY TO THE METAL DECKING. 6. FURNISH AND INSTALL TWO LAYERS OF 2.6" (R-30) ISO INSULATION MECHANICALLY FASTENED TO DECKING PER MANUFACTURER'S SPECIFICATIONS OVER ENTIRE ROOF AREA. 7. FURNISH AND INSTALL TAPERED CRICKETS AS SHOWN ON AS BUILTS. 8. FURNISH AND INSTALL ONE LAYER OF ½” COVERBOARD, ADHERED TO THE INSULATION ACCORDING TO UPLIFT REQUIREMENTS. 9. FURNISH AND INSTALL 1 LAYERS OF SBS BASE SHEET OVER ENTIRE ROOF AREA. 10. FURNISH AND INSTALL 1 LAYER OF SBS FR WHITE CAP SHEET ACCORDING TO MANUFACTURES WRITTEN INSTRUCTIONS 11. WALLS SHALL BE FLASHED WITH 1 PLY OF SBS BASE SHEET AND 1 PLY OF SBS CAP SHEET. 12. FURNISH AND INSTALL NEW SBS FLASHINGS FOR PENETRATION’S. 13. FURNISH AND INSTALL 22 GA METAL COPING CAP AT ALL PARAPET WALLS. 14. FURNISH AND INSTALL NEW ROOF HATCH. 15. FURNISH AND INSTALL LPS SYSTEM. BY SUBCONTRACTOR. 16. FURNISH AND INSTALL NEW SKYLIGHTS AS SPECIFIED IN THE SOW. 17. FURNISH AND INSTALL NEW WALK PAD AS SHOWN ON THE AS BUILTS. 18. PROVIDE DAILY CLEANUP OF WORK AREA.
    $3.9M
  • 12/04/2025 WESTON SOLUTIONS, INC. · W912DY25FA302 · Department of Defense (DOD)
    ROOFING REPAIRS
    $1.2M