| Date | Mod # | Obligation |
|---|---|---|
| Jan 9, 2026 | 0 | +$5,523,503 |
Subcontractors 2$4,215,233 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI EEV2NLW4F6C3 Scope of work: 2 ply sbs modified bitumen
modified bitumen roofing system
1. set-up staging area for roofing as agreed upon subcontractor and contractor.
2. provide all necessary protection needed to guard structures from the execution of our work.
3. set up all required safety as required by osha.
4. remove and dispose of existing roofing system down to steel decking as required to allow the application of the proposed roofing system.
5. furnish and install vapor barrier directly to the metal decking.
6. furnish and install two layers of 2.6" (r-30) iso insulation mechanically fastened to decking per manufacturer's specifications over entire roof area.
7. furnish and install tapered crickets as shown on as builts.
8. furnish and install one layer of ½” coverboard, adhered to the insulation according to uplift requirements.
9. furnish and install 1 layers of sbs base sheet over entire roof area.
10. furnish and install 1 layer of sbs fr white cap sheet according to manufactures written instructions
11. walls shall be flashed with 1 ply of sbs base sheet and 1 ply of sbs cap sheet.
12. furnish and install new sbs flashings for penetration’s.
13. furnish and install 22 ga metal coping cap at all parapet walls.
14. furnish and install new roof hatch.
15. furnish and install lps system. by subcontractor.
16. furnish and install new skylights as specified in the sow.
17. furnish and install new walk pad as shown on the as builts.
18. provide daily cleanup of work area. | $3,868,533 |
UEI K51NQNM7EXF1 Site investigation services – services involving field investigations and surveys and similar fact-finding surveys and investigations that are essential to proper design, reports, and similar services not involving preparation of design, plans, drawings, and specifications. includes the visual inspection of the site or facility for familiarization with scope, general conditions, and coordination with using activities to develop functional relationships and detailed requirements.
4.5.2 site survey report (ssr).
4.5.3 design submittals – 65%, 95%, and 100% design submittals.
4.5.4 construction administration (ca) services – six (6) months of ca service are included based upon the period of performance defined under section 4.3. time of performance of this agreement. if the period of performance is reduced or actual construction schedule is less, architect/engineer’s ca services price shall be adjusted accordingly for the following:
a. construction rfi reviews.
b. construction submittal reviews.
c. as-built drawings.
d. ca progress meetings.
e. ca site visits..
4.5.5 ca site visits – four (4) trips are included. | $346,700 |