FedOps logoFedOps

LMO CONSTRUCTION, LLC

UEI: QDWVS7MEBLF7
Browse awards
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$942K
Received · FY2025–FY2027
$942K
Received · all years
3
Subawards
1
Prime

Top primes

Prime contractorTotal
CHUGACH SOLUTIONS ENTERPRISE, LLC$942K

Most recent

  • 09/05/2025 CHUGACH SOLUTIONS ENTERPRISE, LLC · N4425525F0116 · Department of Defense (DOD)
    SELECTIVE DEMOLITION AND REPLACEMENT OF UP TO 20% OF STRUCTURAL MEMBERS AS IDENTIFIED IN ROOF SURVEY; RELEVEL 50% OF THE TOTAL ROOF SQUARE FOOTAGE BY ADJUSTING OR ADDING TO THE EXISTING ROOF STRUCTURAL SUPPORT MEMBERS; INSTALL FASCIA SUPPORTS AND NEW FASCIA BOARD.
    $159K
  • 09/05/2025 CHUGACH SOLUTIONS ENTERPRISE, LLC · N4425525F0180 · Department of Defense (DOD)
    PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO INSTALL A PREFABRICATED METAL BUILDING APPROXIMATELY 8' X 16' WITH ONE 3' X 7' MAN‐DOOR, GUTTERS, DOWNSPOUTS, AND SPLASH BLOCKS; BOLT BUILDING TO EXISTING CONCRETE SLAB; SAWCUT ASPHALT AND DEMO FOR NEW BOLLARDS; INSTALL FOUR 6' GALVANIZED BOLLARDS WITH BASE PLATES; CONCRETE FILL FOR BOLLARDS; ASPHALT REPAIR.
    $175K
  • 07/18/2025 CHUGACH SOLUTIONS ENTERPRISE, LLC · N4425524F4083 · Department of Defense (DOD)
    STRUCTURAL CONCRETE FOR MILITARY WORKING DOG KENNEL. MOD 2, 10/16/25: INCREASE AMOUNT DUE TO BOND. MOD 3, 11/24/25: PROVIDE ADDITIONAL FOOTING DEPTH, DIMENSIONS AND CONCRETE DEPTH. MOD 4, 12/3/25: ADD COST OF BOND RIDER. MOD 6, 6/23/26: EXTEND PERIOD OF PERFORMANCE, DRAIN CHANGES. MOD 7, 8/3/26: EXTRA TRANSFORMER PAD AND EXTRA REBAR FOR MASONS.
    $607K