LMO CONSTRUCTION, LLC
UEI: QDWVS7MEBLF7
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$942K
Received · FY2025–FY2027
$942K
Received · all years
3
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| CHUGACH SOLUTIONS ENTERPRISE, LLC | $942K |
Most recent
- $159KSELECTIVE DEMOLITION AND REPLACEMENT OF UP TO 20% OF STRUCTURAL MEMBERS AS IDENTIFIED IN ROOF SURVEY; RELEVEL 50% OF THE TOTAL ROOF SQUARE FOOTAGE BY ADJUSTING OR ADDING TO THE EXISTING ROOF STRUCTURAL SUPPORT MEMBERS; INSTALL FASCIA SUPPORTS AND NEW FASCIA BOARD.
- $175KPROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO INSTALL A PREFABRICATED METAL BUILDING APPROXIMATELY 8' X 16' WITH ONE 3' X 7' MAN‐DOOR, GUTTERS, DOWNSPOUTS, AND SPLASH BLOCKS; BOLT BUILDING TO EXISTING CONCRETE SLAB; SAWCUT ASPHALT AND DEMO FOR NEW BOLLARDS; INSTALL FOUR 6' GALVANIZED BOLLARDS WITH BASE PLATES; CONCRETE FILL FOR BOLLARDS; ASPHALT REPAIR.
- $607KSTRUCTURAL CONCRETE FOR MILITARY WORKING DOG KENNEL. MOD 2, 10/16/25: INCREASE AMOUNT DUE TO BOND. MOD 3, 11/24/25: PROVIDE ADDITIONAL FOOTING DEPTH, DIMENSIONS AND CONCRETE DEPTH. MOD 4, 12/3/25: ADD COST OF BOND RIDER. MOD 6, 6/23/26: EXTEND PERIOD OF PERFORMANCE, DRAIN CHANGES. MOD 7, 8/3/26: EXTRA TRANSFORMER PAD AND EXTRA REBAR FOR MASONS.