PIIDN4425525F0180DELIVERY ORDER
$2,262,912.00
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
July 21, 2025
End Date
September 25, 2026
NAICS
PSC
Z2NZ

Description

THIS PROJECT IS TO ADD LOCAL, MANUAL STEAM PRESSURE REDUCING CONTROL STATIONS AT THE MAIN CARRIER DOCKING PIERS, PIER D AND PIER B.

Transactions (2)
DateMod #Obligation
Jul 21, 20250+$2,262,912
Dec 18, 2025P00001+$0
Subcontractors 3$1,161,469 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI MXEKHYEZZJZ6
Install manual steam controls at pier b and pier d.
$826,713
UEI QDWVS7MEBLF7
Provide all labor, material, and equipment to install a prefabricated metal building approximately 8' x 16' with one 3' x 7' man‐door, gutters, downspouts, and splash blocks; bolt building to existing concrete slab; sawcut asphalt and demo for new bollards; install four 6' galvanized bollards with base plates; concrete fill for bollards; asphalt repair.
$175,036
UEI LRUMUHJRCT31
Prepare design quality control plan and acting as design quality control manager; design submittals as outlined in the government request for proposal for design development, prefinal, and final design; construction support in the form of submittal review and approval, request for information review and response, and production of record drawings based on provided as‐built redline drawings; and topographic survey as required to support the design.
$159,720