Description
THIS PROJECT IS TO ADD LOCAL, MANUAL STEAM PRESSURE REDUCING CONTROL STATIONS AT THE MAIN CARRIER DOCKING PIERS, PIER D AND PIER B.
Transactions (2)
| Date | Mod # | Obligation |
|---|---|---|
| Jul 21, 2025 | 0 | +$2,262,912 |
| Dec 18, 2025 | P00001 | +$0 |
Subcontractors 3$1,161,469 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI MXEKHYEZZJZ6 Install manual steam controls at pier b and pier d. | $826,713 |
UEI QDWVS7MEBLF7 Provide all labor, material, and equipment to install a prefabricated metal building approximately 8' x 16' with one 3' x 7' man‐door, gutters, downspouts, and splash blocks; bolt building to existing concrete slab; sawcut asphalt and demo for new bollards; install four 6' galvanized bollards with base plates; concrete fill for bollards; asphalt repair. | $175,036 |
UEI LRUMUHJRCT31 Prepare design quality control plan and acting as design quality control manager; design submittals as outlined in the government request for proposal for design development, prefinal, and final design; construction support in the form of submittal review and approval, request for information review and response, and production of record drawings based on provided as‐built redline drawings; and topographic survey as required to support the design. | $159,720 |