LOVVORN ABATEMENT & INSULATION, LLC
UEI: CDH6Q2XLPY13
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$2.9M
Received · FY2025–FY2027
$2.9M
Received · all years
13
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| BEYOND NEW HORIZONS, LLC | $2.7M |
| TURNER CONSTRUCTION COMPANY | $178K |
Most recent
- $49KASBESTOS REMOVAL SERVICES
- $47KASBESTOS REMOVAL SERVICES
- $75KSERVICE, FABRICATE ONSITE REMOVEABLE INSULATION BLANKET/PAD, 1"" CERAMIC FIBER INSULATION COVERED W/ SILICONE CLOTH, HOG RING TOGETHER AND LACED WITH STAINLESS STEEL WIRE. REMOVEABLE INSULATION BLANKETS TO BE FABRICATED ON SITE TO FIT THE FOLLOWING ITEMS: QTY. 4 ) 2"" FLANGE, WN, RF NPS, 150# SCH 80 QTY. 4 ) 3"" FLANGE SO, RF, NPS, 150# QTY. 8 ) 4"" FLANGE, SCH 160 BORE, 2500#, RTJ, WN QTY. 4 ) 6"" FLANGE, NPS XXS BORE 2500#, RTJ, WN QTY. 4 ) 6"" FLANGE, WN, RF, NPS, 2500#, SCH 80S QTY. 12) 6"",FLANGE, WN, RF, NPS, 150#, SCH 80S QTY. 3 ) 6"" FLANGE, REDUCINGWN, RF, 6"" NPS X 13-1/2"" OD 150# SCH 80S QTY. 8 ) 8"" FLANGE, WN, RF, NPS, 150#, SCH 80S B TOTAL OF 47 REMOVEABLE PADS TO BE FABRICATED AND BNH CRAFTSMEN WILL INSTALL.
- $71KSERVICE; REFRACTORY INSTALLATION IN XB4 (DIRECT FIRE COOLER REFRACTORY INSTALL) PER SOW
- $50KSERVICE - REMOVE AND INSULATE THE CEILING, INSULATE HVAC DIFFUSERS, AND TO CHANGE THE FLEX DUCTS FROM AN R6 TO AN R8 AT BLDG. 111
- $154KSERVICE - 2,000 FT OF FENCING INSTALLED AROUND RECTIFIER BUILDING/DC YARD/FILTER YARD AT NHTF.
- $2.0MABATE AND ADDRESS ASBESTOS INSULATION ISSUES ON THE PROCESS AIR DUCTING OF THE B-EXHAUST COMPRESSOR PRESSURE CONTROL DISCHARGE LINES COMMONLY REFERRED TO AS THE B-EXHAUST DUMP STACK DUCTING. THIS INCLUDES SCAFFOLD CONSTRUCTION AND INSPECTION TO ALLOW ACCESS TO AREAS FOR ASBESTOS ABATEMENT, ADDRESSING THE DAMAGED INSULATION LOCATED ON THE B-EXHAUST DUMP STACK DUCTING, AND PUTTING IN PLACE MITIGATIONS TO PROTECT AGAINST FUTURE INSULATION DETERIORATION. THE B-EXHAUST DUMP STACK DUCTING IS IN THE B-PLANT EXHAUST SIDE BUILDING #879. THE DUCT IS WRAPPED WITH ASBESTOS INSULATION THAT IS WATER DAMAGED TO THE POINT OF DETERIORATION SUCH THAT ASBESTOS FIBERS FREE-FALL FROM THE BOTTOM HALF OF THE DUCT DUE TO VIBRATIONS WHICH OCCUR DURING PLANT OPERATION. SEVERAL KNOWN LEAKS ARE PRESENT. THE CURRENT CONDITION OF THE DUCT IS UNKNOWN DUE TO THE INSULATION COVERAGE. TO ASSESS THE CURRENT AND FUTURE CONDITION OF THE DUCTING A MORE EFFICIENT APPROACH IS NECESSARY TO HELP WITH THE REMOVAL OF THE INSULATION. NUMEROUS LOCATIONS ON THE DUCT ARE CURRENTLY INACCESSIBLE WITHOUT SCAFFOLDING. AS SUCH, DURING SCAFFOLD CONSTRUCTION, AND AS NEW AREAS ARE REVEALED AND BECOME ACCESSIBLE, CONTINUAL ASBESTOS CLEANUP WILL HAVE TO OCCUR ALONGSIDE SCAFFOLD CONSTRUCTION. ONCE THE SCAFFOLD IS CONSTRUCTED, THE DAMAGED ASBESTOS WILL NEED TO BE ABATED. ONCE THIS WORK IS COMPLETED, THE SCAFFOLD WILL BE DECONSTRUCTED, AND THE WASTE DISPOSED OF VIA AEDC'S ASBESTOS LANDFILL.
- $38KSERVICES-ON-BASE-PROVIDE ALL MATERIALS, EQUIPMENT, LABOR, PLANT &TRANSPORTATION NECESSARY TO PERFORM THE FOLLOWING IN BLDG 320RESTROOM INSTALL 30 X 70 DOOR FRAME AND HARDWARE INSTALL PARTITIONS FOR HANDICAP STALL REPLACE (1) FLOOR MOUNTED TOILET, (1) URINAL AND VALVE, (2) SINKS AND HARDWARE INSTALL PARTITION FOR URINAL BETWEEN SINKS INSTALL (I) LIGHT INSTALL ( 1) EXHAUST FAN IN CURRENT LOCATION EPOXY FLOOR TOUCH UP EXISTING PAINT CUT OFF BOLTS AROUND WINDOWS SEAL THE HOLES THROUGH THE EXTERIOR WALL INSIDE THE BATHROOM AREA
- $80KPREP SITE; INSTALL ARMAG; RUN POWER.
- $44KCOVER, ALUMINUM, BUTTERFLY GORE, 2"X6"