UEI: LSG1NKYVNVE1
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$284K
Received · FY2025–FY2027
$284K
Received · all years
1
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| LEAD BUILDERS INC | $284K |
Most recent
- $284KDIVISION 01- GENERAL REQUIREMENTS DIVISION 01 - GENERAL REQUIREMENTS (ALL SECTIONS AS THEY RELATE TO YOUR SCOPE OF WORK) DIVISION 07 - THERMAL & MOISTURE PROTECTION 07 52 00 -MODIFIED BITMUS MEMBRANE ROOFING [WHILE SPECIFICATION SECTION 07 52 00 (MODIFIED BITMUS MEMBRANE ROOFING) IS NOT INCLUDED IN THE GOV 'T ISSUED PROJECT SPECIFICATIONS, THERE ARE SPECIFIC STATEMENTS MADE WITHIN THE DRAWINGS SPEC(FYING THE PVC ROOFING IS TO BE INSTALLED. NOTE #150 ON PAGE A-105 WITHIN THE SAME DOCUMENT, IDENTIFIES THE CONTRACTOR IS TO INSTALL AN OVERLAY SINGLY PLY (PVC) ROOF SYSTEM, TO INCLUDE FLUTE FILLER POLYISOCYANURATE INSULATION, ½" DENSE DECKING AND SINGLE PLY PVC MEMBRANE 80 MIL THICK (REDWOOD COLOR) WITH RIBBED DECOR. THIS SCOPE INCLUDES ALL REQUIRED WORK AS SHOWN ON THE DRAWINGS AND DETAILS WITHIN DRAWINGS AND SHALL BE PERFORMED IN ACCORDANCE WITH STANDARD INDUSTRY PRACTICES AND MANUFACTURER GUIDELINES.