M2 ELECTRIC LLC
UEI: EAKHLUBBKU27
$10.7M
Obligations · USAspending
Actions Mar '14 – Apr '25
46
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Top agencies
By obligations · USAspending, all years
- Department of Defense$7.6M · 31 awards
- Department of Agriculture$3.1M · 15 awards
Top NAICS
By obligations · USAspending, all years
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| W91CRB25F0173 | Department of the Army | 04/07/2025 | $145K |
| W91CRB24F0148 | Department of the Army | 04/04/2024 | $84K |
| W91CRB24F0140 | Department of the Army | 04/01/2024 | $84K |
| W91CRB22F0229 | Department of the Army | 04/19/2022 | $43K |
| 12639522C0024 | Animal and Plant Health Inspection Service | 01/28/2022 | $959K |
| W91CRB22F0006 | Department of the Army | 10/13/2021 | $26K |
| W91CRB21F0510 | Department of the Army | 09/24/2021 | $90K |
| W91CRB21F0307 | Department of the Army | 05/19/2021 | $133K |
| W91CRB21F0275 | Department of the Army | 04/20/2021 | $13K |
| W91CRB21F0226 | Department of the Army | 03/16/2021 | $19K |
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$547K
Received · FY2025–FY2027
$547K
Received · all years
2
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| CHUGACH CONSOLIDATED SOLUTIONS, LLC | $346K |
| STAMPEDE VENTURES, INC. | $201K |
Most recent
- $201K1. DEMO OLD LIGHTS MAIN ENTRANCE. INSTALL (4) NEW WRAP AROUND BATTERY BACKUP LED FIXTURES. CONTROL OF CEILING MOTION DETECTOR 2. .DEMO OLD LIGHTS SECONDARY ENTRANCE. INSTALL (4) NEW 4' WRAP AROUND BATTERY BACKUP LED FIXTURES. CONTROL OF CEILING MOTION DETECTOR. 3. SOUTH END COMMS ROOM. RELOCATE EXISTING LIGHT. INSTALL (1) 4 WRAP LED BATTERY BACKUP FIXTURE. INSTALL WALL MOUNTED MOTION SWITCH. 4. CONNECT 3- TON MINI SPLIT. OUTSIDE UNIT APPROX.250' AWAY. SUPPLY DISCONNECTS AT BOTH ENDS. INSTALL OUTLET FOR CONDENSATE PUMP. 5. FURNISH AND INSTALL NEW 100-AMP 3 PHASE/ BOLT ON/MAIN LUG PANEL IN SOUTH END COMMS ROOM. FEED FROM HALLWAY PANEL APPROX. 100' AWAY. FURNISH BREAKER IN EXISTING PANEL. 6. RELOCATE (4) EXISTING LIGHT FIXTURES IN NORTH END COMMS ROOM. 7. INSTALL (4) NEW 4' WRAP LED FIXTURES WITH BATTERY BACKUP IN NORTH END COMMS ROOM. INSTALL WALL MOTION SENSOR. 8. CONNECT 3-TON MINI SPLIT. FEED CONDENSER. INSTALL DISCONNECT TO EACH PART AND INSTALL BREAKER IN EXISTING PANEL. INSTALL OUTLET FOR CONDENSATE PUMP. 9. INSTALL NEW 20-AMP CIRCUIT FROM NEW PANEL FOR CAMERA SYSTEM. 10. INSTALL (1) 20-AMP QUAD FOR MONITOR AT DESK. APPROX 100' AWAY FROM PANEL. 11. INSTALL (L) 20-ARNP CIRCUIT FOR SECOND MONITOR LOCATION, APPROX 100' FROM PANEL. 12. REMOVE AND REINSTALL (15) LIGHTS AFTER WORK IS COMPLETE. 13. INSTALL BOX EXTENSION RINGS WHERE DOUBLE SHEETROCK IS BEING INSTALLED APPROX. (18). 14. REMOVE AND RE-FEED (3) BASE FEEDS WHEN WORK IS COMPLETE. 15. INSTALL (3) 30-AMP L6-30 2POLE 3 WIE LOCKING RECEPTACLES. 16. INSTALL 1EA SMOKE IN EACH COMM ROOM. 17. DISASSEMBLE (7) WORKSTATIONS AND DISPOSE IN DUMPSTER. 18. DISASSEMBLE AND RECONFIGURE (2) WORKSTATIONS FOR NEW RECEPTION AREA. 19. DISASSEMBLE (18) WORKSTATIONS AND STORE THEM IN TRAILER. REINSTALL AFTER WORK IS FINISHED. 20. EMPTY ALL CONTENTS OF CONFERENCE ROOM. (1) TABLE, (12) CHAIRS, (1) WHITE BOARD AND STORE IN TRAILER. REINSTALL AFTER WORK IS FINISHED. 21. REMOVE AND REINSTALL CONFERENCE ROOM LIGHTS AS REQUIRED. 22. REMOVE AND REINSTALL ELECTRICAL BASEBOARD HEATERS. 23. REMOVE OR EXTEND EXISTING DEVICES AND REPLACE OR REINSTALL AS REQUIRED, REUSE OR PROVIDE NEW COVER PLATES. 24. RELOCATE (A) 5 DRAWER FILE CABINETS AND REPLACE THEM WHEN COMPLETE. 25. INSTALL (1100') OF 4" X 12" CABLE TRAY . 26. INSTALL (50') OF L0" WIREMOLD PN05L10-W DROPS WITH BOXES ON PRIVATE OFFICE WALLS. 27. INSTALL (150') OF 20' WIREMOLD PN05L10-W WITH BOXES FOR WORKSTATIONS. 28. INSTALL (30) POWER POLES FROM CABLE TRAYS TO WORKSTATIONS. 29. INSTALL (500') 1" RIDGED CONDUIT FROM NORTH COMM ROOM (OR NORTH SECURE AREA) TO SOUTH COMM ROOM. 30. INSTALL (600') 1.5" RIDGED CONDUIT FROM SIPER COMM ROOM TO OLD SECURE AREA. 31. RUN CONTINUOUS 6AWG COPPER FROM GROUND BOND THROUGH CABLE TRAY. 32. INSTALL (2) 4” PVX TROUGH WALL TO TRAY. 33. LIFTS FOR THIS TRADES WORK 34. BONDS 35. SUBMITTALS AND SKETCHES FOR THIS TRADES WORK. 36. AS-BUILTS AND O&MS
- $346KLED LIGHTING PHASE 5C-1