R BROOKS MECHANICAL HEATING AND AIR CONDITIONING LLC
UEI: YMM4E26WHGN9
$1.1M
Obligations · USAspending
Actions Aug '15 – Sep '26
25
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Dec '26
Period of performance through
Top agencies
By obligations · USAspending, all years
- Department of Veterans Affairs$719K · 15 awards
- Department of Health and Human Services$247K · 7 awards
- Department of Defense$104K · 3 awards
Top NAICS
By obligations · USAspending, all years
- 238220 Plumbing, Heating, and Air-Conditioning Contractors$461K
- 561210 Facilities Support Services$263K
- 532490 Other Commercial and Industrial Machinery and Equipment Rental and Leasing$162K
- 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing$95K
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance$50K
- 236220 Commercial and Institutional Building Construction$27K
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| 7571MN26P00091 | Office of the Assistant Secretary for Financial Resources | 09/24/2026 | $64K |
| 36C24426P0383 | Department of Veterans Affairs | 06/12/2026 | $162K |
| 7571MN26P00025 | Office of the Assistant Secretary for Financial Resources | 04/20/2026 | $41K |
| 36C24426P0144 | Department of Veterans Affairs | 12/09/2025 | $13K |
| 75P00225P00033 | Office of the Assistant Secretary for Administration | 05/22/2025 | $19K |
| 75P00225P00013 | Office of the Assistant Secretary for Administration | 12/05/2024 | $76K |
| 36C24425P0117 | Department of Veterans Affairs | 11/25/2024 | $27K |
| 36C24424P0877 | Department of Veterans Affairs | 09/04/2024 | $66K |
| 75P00224P00068 | Office of the Assistant Secretary for Administration | 04/08/2024 | $9K |
| 36C24423N0897 | Department of Veterans Affairs | 06/13/2023 | $26K |
Expiring contracts
Period of performance ending in the next 18 months · USAspending
- 7571MN26P00091 · Department of Health and Human Services$64K · ends 12/30/2026
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$4.0M
Received · FY2025–FY2027
$4.0M
Received · all years
5
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| STAMPEDE VENTURES, INC. | $3.9M |
| LEIDOS, INC. | $101K |
Most recent
- $3.6MMECHANICAL: • INSTALL THE FOLLOWING CUSTOMER SUPPLIED EQUIPMENT: O ADMINISTRATIVE AREA- ONE (1) AIR HANDLING UNIT ONE (1) DOAS UNIT FOUR (4) VAV BOXES ONE (1) ELECTRIC STEAM HUMIDIFIER ONE (1) AIR COOLED CHILLER O COMS ROOMS- TWO (2) LOW AMBIENT DUCTLESS UNITS O TELECOM ROOMS- TWO (2) LOW AMBIENT DUCTLESS UNITS O BLOOD LONG TERM STORAGE- TWO (2) 20 TON DX PACKAGE UNITS ONE (1) ELECTRIC STEAM DUCT HUMIDIFIER O BLOOD PROCESSING AND VERIFICATION ROOMS- TWO (2) AIR HANDING UNITS TWO (2) DOAS UNITS FOUR (4) VAV BOXES FOUR (4) WALL MOUNTED HUMIDIFIERS TWO (2) 25 TON AIR COOLED CHILLERS • FURNISH AND INSTALL THE FOLLOWING EQUIPMENT: O TWO (2) IN LINE FANS TO SERVE THE RESTROOMS / LOCKER ROOMS. O ONE (1) AIR CURTAIN FOR THE DELIVERY AREA O THREE (3) TRENTON WALK IN REFRIGERATORS O UP TO ONE (1) FAN PER MECHANICAL ROOM O ELECTRIC UNIT HEATERS AS REQUIRED IN MECHANICAL ROOMS O TWO (2) HOT WATER PUMPS WITH TRIPLE DUTY VALVES O TWO (2) LOCHINVAR 60KW BOILERS O TWO (2) 200 GALLON BUFFER TANKS • FURNISH AND INSTALL A COMPLETE DUCTWORK SYSTEM INSULATED IN 2” DUCT WRAP, 1.5LB DENSITY. • FURNISH AND INSTALL ALL REQUIRED LINEAR AND LAY IN DIFFUSERS AS REQUIRED FOR A COMPLETE SYSTEM. • FURNISH AND INSTALL ALL REQUIRED MECHANICAL LOUVERS AS REQUIRED. • PROVIDE CRANE AND RIGGING SERVICES BY TITAN CRANE. • PROVIDE TESTING AND BALANCING. • FURNISH AND INSTALL ALL REQUIRED MECHANICAL PIPING FOR A COMPLETE SYSTEM. • PROVIDE MECHANICAL WATER TREATMENT AND GLYCOL. • FURNISH AND INSTALL THE FOLLOWING PLUMBING PIPING: O SANITARY BELOW GRADE: CAST IRON HUB OR SCH 40 PVC O SANITARY ABOVE GRADE: CAST IRON NO HUB O DOMESTIC WATER: COPPER L SWEAT OR PRO-PRESS • FURNISH AND INSTALL THE FOLLOWING PLUMBING FIXTURES: O ALL REQUIRED LAVATORIES O ALL REQUIRED TOILETS O ALL REQUIRED SHOWERS + TRIM O FOUR (4) ICE MAKERS 500LB O ONE (1) 80 GALLON HOT WATER HEATER O ALL REQUIRED SINK O REQUIRED EYE WASHES O REQUIRED FLOOR DRAINS O REQUIRED RECIRCULATION PUMP O REQUIRED BACK FLOW PREVENTERS • FORT MCGUIRE: O CUT AND CAP MECHANICAL SYSTEM BEFORE DEMO BY OTHERS.
- $106K• EXECUTE ALL MAINTENANCE PROCEDURES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDED MAINTENANCE FOR THE SPECIFIC PIECE OF EQUIPMENT. • PERFORM LOCK-OUT TAG-OUT PROCEDURE PRIOR TO SERVICING ANY PIECE OF EQUIPMENT. • CHECK IN WITH ON-SITE PERSONNEL TO IDENTIFY ANY ISSUES WITH THE PERFORMANCE OF THE EQUIPMENT. • PERFORM AS NEEDED CHEMICAL CLEANING OF CONDENSER COILS. • PERFORM CLEANING OF EVAPORATOR COILS AS NEEDED. • INSTALL NEW AIR FILTERS, AND CLEAN WASHABLE FILTERS. • PERFORM VISUAL LEAK INSPECTIONS FOR ANY SIGNS OF REFRIGERANT OR OIL LEAKS. • INSPECT CONDENSER FAN MOTORS AND ASSOCIATED CONTACTORS FOR WEAR. • INSPECT AND SECURELY FASTEN ALL ELECTRICAL CONNECTIONS. • LUBRICATE ALL MOTORS AND PULLEYS AND ENSURE PROPER BELT ALIGNMENT AND TENSION. • CLEAR DRAIN LINES AND DRAIN PANS. • ASSESS AIR TEMPERATURE SPLITS TO ENSURE PROPER EQUIPMENT PERFORMANCE. • ASSESS THE OVERALL CONDITION OF EACH PIECE OF EQUIPMENT. • REMOVE ANY DEBRIS FROM THE SITE THAT MAY RESULT FROM ANY WORK PERFORMED. • REPORT ANY OBSERVATIONS TO THE APPROPRIATE ON-SITE CONTACT.
- $40KFURNISH AND INSTALL FLEXIBLE DUCTWORK FURNISH AND INSTALL TEMPORARY AIR DEVICES
- $166K• FURNISH AND INSTALL THREE (3) NEW NITROGEN DROPS W/ NEW LINES AS NEEDED. O TWO (2) IN LAB Z2C-43 O ONE (1) IN LAB Z2C-45 O THREE (3) ATP TECH REGULATORS OR EQUAL • FURNISH AND INSTALL DI WATER LINES FROM WHERE AVAILABLE BACK TO LAB 45. • FURNISH AND INSTALL ONE (1) DI WATER FAUCET IN LAB 45. • ASSIST IN REMOVAL OF GAS CYLINDER OUTSIDE OF LAB 45 AS NEEDED. • DI WATER FOR LABS Z2C-39, 41/42 O LOCATE NEAREST DI WATER MAIN AND BRING PIPING DOWN MAIN CORRIDOR. O FURNISH AND INSTALL NECESSARY PIPING TO STUB INTO LABS 39, 41, AND 42. O FURNISH AND INSTALL NEW DI WATER PIPING FOR ONE SINK IN EACH LAB FOR LABS 39, 41, AND 42. O FURNISH AND INSTALL TWO (2) NEW DI WATER FAUCETS, ONE (1) FOR EACH LAB. • EXHAUST DUCTWORK: O FURNISH AND INSTALL NEW 4” TRUNK OFF OF EXISTING 12” EXHAUST TRUNK. O FURNISH NEW 3” LEG ACROSS LAB TO FAR CORNER NEAR PASSENGER CORRIDOR. O FURNISH AND INSTALL FIVE (5) 2” DROPS WITH 1” NPT CONNECTIONS. O INSTALL CUSTOMER SUPPLIED FUME HOOD AND CONNECT TO EXHAUST TRUNK.
- $101KPROCURED GOODS AND/OR SERVICES BETWEEN 05-AUG-25 AND 30-SEP-25 IN SUPPORT OF CONTRACT SOW.