Back to contract actions
Awarding Agency
Sub-Agency
Department of the Army
Start Date
September 22, 2025
End Date
March 6, 2029
NAICS
PSC
Y1DB
Transactions (4)
| Date | Mod # | Obligation |
|---|---|---|
| Aug 18, 2025 | 0 | +$25,225,102 |
| Sep 11, 2025 | P00001 | +$0 |
| May 21, 2026 | P00002 | +$500,626 |
| Jul 1, 2026 | P00003 | +$0 |
Subcontractors 5$7,377,619 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI LD7DNJ4KNU21 Task 1: geotechnical investigation and report development
1. perform a geotechnical evaluation of the site to support design of the proposed building and associated site infrastructure. all drilling will be performed by a licensed driller with a track-mounted drill rig to complete the proposed boring schedule outlined below within proximity to the proposed building footprint. all borings will be advanced to the specified depths or until refusal. borings will be sampled continuously for the first 20’, then every 5’ thereafter and will include spt testing. up to two shelby tube samples will be collected during the drilling operation if clay material is encountered. a minimum of 20% of the borings will remain open to allow for 24-hour groundwater readings. borings will be backfilled with cuttings and borings within asphalt areas will be hand patched with cold patch material. excess cuttings will be removed from the site and disturbed soil will be seeded and mulched. provide certified personnel to be on site during the borings operations to provide oversight, sample collection, and develop geotechnical logs.
a. 1 boring to 100’
b. 3 borings to 30’
2. coordinate with a licensed subcontractor to complete shear wave velocity testing to confirm the site-specific site seismic class category. shear wave velocity testing will be performed on the single 100- deep borehole.
3. develop a geotechnical recommendations report that will adhere to the requirements outlined in as per the rfp specifications in volume 01, division 01, 01 10 10 statement of work, section 6.7.4.3 contractor-provided geotechnical report and ufc 3-220-01. information in the report will include, but is not limited to, laboratory testing results, foundation recommendations, underground utility discussion, soil stabilization, slope stability, settlement analysis, surcharge program recommendations, in-situ soil bearing capacity analysis, compaction requirements, and sheeting and shoring considerations. assumes the portion of the scope including environmental testing and remedial measures will be completed by others. include findings from these activities, provided by others, in the geotechnical report.
task 2: optional fill material testing
1. collect a soil sample and coordinate soil chemical testing for imported fill material to verify if import material meets the project specifications. develop a memo outlining the findings and will include a copy of the laboratory testing analysis. assumed 2 borrow material locations will be sampled. | $53,000 |
UEI YMM4E26WHGN9 Mechanical:
• install the following customer supplied equipment:
o administrative area-
one (1) air handling unit
one (1) doas unit
four (4) vav boxes
one (1) electric steam humidifier
one (1) air cooled chiller
o coms rooms-
two (2) low ambient ductless units
o telecom rooms-
two (2) low ambient ductless units
o blood long term storage-
two (2) 20 ton dx package units
one (1) electric steam duct humidifier
o blood processing and verification rooms-
two (2) air handing units
two (2) doas units
four (4) vav boxes
four (4) wall mounted humidifiers
two (2) 25 ton air cooled chillers
• furnish and install the following equipment:
o two (2) in line fans to serve the restrooms / locker rooms.
o one (1) air curtain for the delivery area
o three (3) trenton walk in refrigerators
o up to one (1) fan per mechanical room
o electric unit heaters as required in mechanical rooms
o two (2) hot water pumps with triple duty valves
o two (2) lochinvar 60kw boilers
o two (2) 200 gallon buffer tanks
• furnish and install a complete ductwork system insulated in 2” duct wrap,
1.5lb density.
• furnish and install all required linear and lay in diffusers as required for a complete system.
• furnish and install all required mechanical louvers as required.
• provide crane and rigging services by titan crane.
• provide testing and balancing.
• furnish and install all required mechanical piping for a complete system.
• provide mechanical water treatment and glycol.
• furnish and install the following plumbing piping:
o sanitary below grade: cast iron hub or sch 40 pvc
o sanitary above grade: cast iron no hub
o domestic water: copper l sweat or pro-press
• furnish and install the following plumbing fixtures:
o all required lavatories
o all required toilets
o all required showers + trim
o four (4) ice makers 500lb
o one (1) 80 gallon hot water heater
o all required sink
o required eye washes
o required floor drains
o required recirculation pump
o required back flow preventers
• fort mcguire:
o cut and cap mechanical system before demo by others. | $3,588,416 |
UEI XQ8CE8NGKYM5 Design reviews 65%, 95%, and 100% submissions, including final comment backcheck.
4.5.2 construction meetings – total 44 meetings.
4.5.3 commissioning – hvac
a. heating, ventilating, air-conditioning, and refrigeration systems (mechanical and passive) and associated controls (hvac)
b. chillers, boilers, pumps, and other energy plant equipment
c. building control system / building energy management system and cold storage temperature monitoring and alarming system
d. epss and their interfaces to other critical building system operations.
4.5.4 commissioning – energy systems
a. energy and water utility metering systems and sub-meters
4.5.5 commissioning - plumbing
a. service water heating systems
b. plumbing systems and associated controls
c. water pressure-booster systems
d. energy conservation equipment and systems, including solar hot water system and any renewable energy systems
e. eps and their interfaces to other critical building system operations
4.5.6 commissioning - electrical
a. power distribution systems
b. power generation systems
c. communication systems, including telecommunication infrastructure, nc, itv, intrusion detection, infant abduction, other esss, and other communication systems
d. lighting systems including interior and exterior, automatic and manual daylighting controls, occupancy sensing devices, automatic shut-off controls, time switching, and other lighting control devices and dimming systems
e. automatic receptacle control
4.5.7 commissioning - fire protection
a. fire suppression, smoke or fire dampers, fire detection and alarm systems, and mass notification systems, and their interfaces to other building system components
4.5.8 commissioning – building envelope in accordance with provided specification section 01 91 19
a. verification of the design and installation of the continuous air barrier
b. inspection of fenestration and doors
c. inspection of opaque roof, walls, and floors
d. fenestration inspections
e. loading dock weather seal inspections
4.5.9 deliverables:
a. commissioning meeting minutes
b. design-phase commissioning plan
c. owner’s program of requirements (opr)
d. commissioning specification
e. design review comments
f. construction-phase commissioning plan
g. pre-functional checklists
h. pre-verification tests
i. functional performance tests
j. systems manual / maintenance plan
1)performed in accordance with er 25-245-1, but in conjunction with and in support of the contractor and subcontractors. architect/engineer is not and cannot be solely responsible for this task.
k. training plan
l. commissioning report (with update at the end of the warranty period) | $335,684 |
UEI K51NQNM7EXF1 Clin 0001 base bid: design
clin 0002 base bid: demolition
clin 0003 base bid: new facility at dover afb
clin 0007 option 3: demolition of existing facility | $3,357,712 |
UEI CRMCSQC1JMH5 Accident prevention plan (ffp)
quality control plan (ffp)
environmental protection plan (ffp)
waste management plan (ffp)
monthly schedule updates (t & m) | $42,807 |