FedOps logoFedOps

WALLACE, MONTGOMERY & ASSOCIATES, L.L.P.

UEI: LD7DNJ4KNU21
Browse awards
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$53K
Received · FY2025–FY2027
$53K
Received · all years
1
Subawards
1
Prime

Top primes

Prime contractorTotal
STAMPEDE VENTURES, INC.$53K

Most recent

  • 05/21/2026 STAMPEDE VENTURES, INC. · W912BU25F0037 · Department of Defense (DOD)
    TASK 1: GEOTECHNICAL INVESTIGATION AND REPORT DEVELOPMENT 1. PERFORM A GEOTECHNICAL EVALUATION OF THE SITE TO SUPPORT DESIGN OF THE PROPOSED BUILDING AND ASSOCIATED SITE INFRASTRUCTURE. ALL DRILLING WILL BE PERFORMED BY A LICENSED DRILLER WITH A TRACK-MOUNTED DRILL RIG TO COMPLETE THE PROPOSED BORING SCHEDULE OUTLINED BELOW WITHIN PROXIMITY TO THE PROPOSED BUILDING FOOTPRINT. ALL BORINGS WILL BE ADVANCED TO THE SPECIFIED DEPTHS OR UNTIL REFUSAL. BORINGS WILL BE SAMPLED CONTINUOUSLY FOR THE FIRST 20’, THEN EVERY 5’ THEREAFTER AND WILL INCLUDE SPT TESTING. UP TO TWO SHELBY TUBE SAMPLES WILL BE COLLECTED DURING THE DRILLING OPERATION IF CLAY MATERIAL IS ENCOUNTERED. A MINIMUM OF 20% OF THE BORINGS WILL REMAIN OPEN TO ALLOW FOR 24-HOUR GROUNDWATER READINGS. BORINGS WILL BE BACKFILLED WITH CUTTINGS AND BORINGS WITHIN ASPHALT AREAS WILL BE HAND PATCHED WITH COLD PATCH MATERIAL. EXCESS CUTTINGS WILL BE REMOVED FROM THE SITE AND DISTURBED SOIL WILL BE SEEDED AND MULCHED. PROVIDE CERTIFIED PERSONNEL TO BE ON SITE DURING THE BORINGS OPERATIONS TO PROVIDE OVERSIGHT, SAMPLE COLLECTION, AND DEVELOP GEOTECHNICAL LOGS. A. 1 BORING TO 100’ B. 3 BORINGS TO 30’ 2. COORDINATE WITH A LICENSED SUBCONTRACTOR TO COMPLETE SHEAR WAVE VELOCITY TESTING TO CONFIRM THE SITE-SPECIFIC SITE SEISMIC CLASS CATEGORY. SHEAR WAVE VELOCITY TESTING WILL BE PERFORMED ON THE SINGLE 100- DEEP BOREHOLE. 3. DEVELOP A GEOTECHNICAL RECOMMENDATIONS REPORT THAT WILL ADHERE TO THE REQUIREMENTS OUTLINED IN AS PER THE RFP SPECIFICATIONS IN VOLUME 01, DIVISION 01, 01 10 10 STATEMENT OF WORK, SECTION 6.7.4.3 CONTRACTOR-PROVIDED GEOTECHNICAL REPORT AND UFC 3-220-01. INFORMATION IN THE REPORT WILL INCLUDE, BUT IS NOT LIMITED TO, LABORATORY TESTING RESULTS, FOUNDATION RECOMMENDATIONS, UNDERGROUND UTILITY DISCUSSION, SOIL STABILIZATION, SLOPE STABILITY, SETTLEMENT ANALYSIS, SURCHARGE PROGRAM RECOMMENDATIONS, IN-SITU SOIL BEARING CAPACITY ANALYSIS, COMPACTION REQUIREMENTS, AND SHEETING AND SHORING CONSIDERATIONS. ASSUMES THE PORTION OF THE SCOPE INCLUDING ENVIRONMENTAL TESTING AND REMEDIAL MEASURES WILL BE COMPLETED BY OTHERS. INCLUDE FINDINGS FROM THESE ACTIVITIES, PROVIDED BY OTHERS, IN THE GEOTECHNICAL REPORT. TASK 2: OPTIONAL FILL MATERIAL TESTING 1. COLLECT A SOIL SAMPLE AND COORDINATE SOIL CHEMICAL TESTING FOR IMPORTED FILL MATERIAL TO VERIFY IF IMPORT MATERIAL MEETS THE PROJECT SPECIFICATIONS. DEVELOP A MEMO OUTLINING THE FINDINGS AND WILL INCLUDE A COPY OF THE LABORATORY TESTING ANALYSIS. ASSUMED 2 BORROW MATERIAL LOCATIONS WILL BE SAMPLED.
    $53K