FedOps logoFedOps

SUMMER CONSULTANTS INC

UEI: XQ8CE8NGKYM5
Browse awards
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$336K
Received · FY2025–FY2027
$336K
Received · all years
1
Subawards
1
Prime

Top primes

Prime contractorTotal
STAMPEDE VENTURES, INC.$336K

Most recent

  • 11/26/2025 STAMPEDE VENTURES, INC. · W912BU25F0037 · Department of Defense (DOD)
    DESIGN REVIEWS 65%, 95%, AND 100% SUBMISSIONS, INCLUDING FINAL COMMENT BACKCHECK. 4.5.2 CONSTRUCTION MEETINGS – TOTAL 44 MEETINGS. 4.5.3 COMMISSIONING – HVAC A. HEATING, VENTILATING, AIR-CONDITIONING, AND REFRIGERATION SYSTEMS (MECHANICAL AND PASSIVE) AND ASSOCIATED CONTROLS (HVAC) B. CHILLERS, BOILERS, PUMPS, AND OTHER ENERGY PLANT EQUIPMENT C. BUILDING CONTROL SYSTEM / BUILDING ENERGY MANAGEMENT SYSTEM AND COLD STORAGE TEMPERATURE MONITORING AND ALARMING SYSTEM D. EPSS AND THEIR INTERFACES TO OTHER CRITICAL BUILDING SYSTEM OPERATIONS. 4.5.4 COMMISSIONING – ENERGY SYSTEMS A. ENERGY AND WATER UTILITY METERING SYSTEMS AND SUB-METERS 4.5.5 COMMISSIONING - PLUMBING A. SERVICE WATER HEATING SYSTEMS B. PLUMBING SYSTEMS AND ASSOCIATED CONTROLS C. WATER PRESSURE-BOOSTER SYSTEMS D. ENERGY CONSERVATION EQUIPMENT AND SYSTEMS, INCLUDING SOLAR HOT WATER SYSTEM AND ANY RENEWABLE ENERGY SYSTEMS E. EPS AND THEIR INTERFACES TO OTHER CRITICAL BUILDING SYSTEM OPERATIONS 4.5.6 COMMISSIONING - ELECTRICAL A. POWER DISTRIBUTION SYSTEMS B. POWER GENERATION SYSTEMS C. COMMUNICATION SYSTEMS, INCLUDING TELECOMMUNICATION INFRASTRUCTURE, NC, ITV, INTRUSION DETECTION, INFANT ABDUCTION, OTHER ESSS, AND OTHER COMMUNICATION SYSTEMS D. LIGHTING SYSTEMS INCLUDING INTERIOR AND EXTERIOR, AUTOMATIC AND MANUAL DAYLIGHTING CONTROLS, OCCUPANCY SENSING DEVICES, AUTOMATIC SHUT-OFF CONTROLS, TIME SWITCHING, AND OTHER LIGHTING CONTROL DEVICES AND DIMMING SYSTEMS E. AUTOMATIC RECEPTACLE CONTROL 4.5.7 COMMISSIONING - FIRE PROTECTION A. FIRE SUPPRESSION, SMOKE OR FIRE DAMPERS, FIRE DETECTION AND ALARM SYSTEMS, AND MASS NOTIFICATION SYSTEMS, AND THEIR INTERFACES TO OTHER BUILDING SYSTEM COMPONENTS 4.5.8 COMMISSIONING – BUILDING ENVELOPE IN ACCORDANCE WITH PROVIDED SPECIFICATION SECTION 01 91 19 A. VERIFICATION OF THE DESIGN AND INSTALLATION OF THE CONTINUOUS AIR BARRIER B. INSPECTION OF FENESTRATION AND DOORS C. INSPECTION OF OPAQUE ROOF, WALLS, AND FLOORS D. FENESTRATION INSPECTIONS E. LOADING DOCK WEATHER SEAL INSPECTIONS 4.5.9 DELIVERABLES: A. COMMISSIONING MEETING MINUTES B. DESIGN-PHASE COMMISSIONING PLAN C. OWNER’S PROGRAM OF REQUIREMENTS (OPR) D. COMMISSIONING SPECIFICATION E. DESIGN REVIEW COMMENTS F. CONSTRUCTION-PHASE COMMISSIONING PLAN G. PRE-FUNCTIONAL CHECKLISTS H. PRE-VERIFICATION TESTS I. FUNCTIONAL PERFORMANCE TESTS J. SYSTEMS MANUAL / MAINTENANCE PLAN 1)PERFORMED IN ACCORDANCE WITH ER 25-245-1, BUT IN CONJUNCTION WITH AND IN SUPPORT OF THE CONTRACTOR AND SUBCONTRACTORS. ARCHITECT/ENGINEER IS NOT AND CANNOT BE SOLELY RESPONSIBLE FOR THIS TASK. K. TRAINING PLAN L. COMMISSIONING REPORT (WITH UPDATE AT THE END OF THE WARRANTY PERIOD)
    $336K