FedOps logoFedOps

RPR, INC.

UEI: EZJBXK4JEXH1
Browse awards
$2.4M
Obligations · USAspending
Actions Nov '15 – Jul '19
6
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Top agencies

By obligations · USAspending, all years

Top NAICS

By obligations · USAspending, all years

  • 236220 Commercial and Institutional Building Construction$1.2M
  • 238160 Roofing Contractors$1.2M

Recent awards

Latest contract actions by start date · USAspending

AwardAgencyStartAmount
697DCK19C00199Federal Aviation Administration07/01/2019$465K
697DCK18C00018Federal Aviation Administration11/29/2017$703K
DOCWE133W16SE1715National Oceanic and Atmospheric Administration09/23/2016—
DTFAWN16C00415Federal Aviation Administration08/26/2016$425K
ING16PX00085U.S. Geological Survey11/24/2015$5K
DTFAWN16C00212Federal Aviation Administration11/13/2015$810K

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$2.1M
Received · FY2025–FY2027
$2.1M
Received · all years
3
Subawards
3
Primes

Top primes

Prime contractorTotal
WELDIN CONSTRUCTION LLC$1.2M
STAMPEDE VENTURES, INC.$841K
RED POINT CONSTRUCTION, LLC$92K

Most recent

  • 06/02/2026 RED POINT CONSTRUCTION, LLC · FA500026F0046 · Department of Defense (DOD)
    ROOFING
    $92K
  • 02/13/2026 WELDIN CONSTRUCTION LLC · 70Z08726FSITK0001 · Department of Homeland Security (DHS)
    ROOFING
    $1.2M
  • 10/29/2025 STAMPEDE VENTURES, INC. · W912DY25FA090 · Department of Defense (DOD)
    ROOF DEMOLITION: ROOF RELATED DEMOLITION. • REMOVE AND DISPOSE OF EXISTING COPING AND BASE FLASHINGS. O METAL COMPONENTS WILL BE DELIVERED TO LOCAL RECYCLER IN ANCHORAGE. • REMOVE EXISTING ROOF ASSEMBLY DOWN TO STRUCTURAL DECKING. O DEPOSIT DEBRIS INTO GC SUPPLIED DUMPSTERS. • PROVIDE TEMPORARY TIE INS AND COVER DURING DEMOLITION AND ROOF INSTALL IN ORDER TO MAINTAIN WEATHER INTEGRITY OF THE ROOF SYSTEM. MAIN BUILDING ROOF AREAS: FULLY ADHERED 3 PLY SBS MODIFIED BUILT UP ROOF SYSTEM ADHERED TO STRUCTURAL CONCRETE DECK. • OVER STRUCTURAL CONCRETE DECK INSTALL SELF ADHERING VAPOR RETARDER. • AT STRUCTURALLY SLOPED ROOF DECKS PROVIDE R38 POLYISOCYANURATE RIGID INSULATION IN 2 LAYERS ADHERED WITH MANUFACTURER’S 2 PART INSULATION ADHESIVE. O INSTALL POLYISOCYANURATE INSULATION CRICKETS WITH A FINISHED SLOPE OF ½” PER FOOT AT VALLEYS OF STRUCTURAL SLOPE TO DIRECT WATER TO ROOF DRAINS ADHERED WITH MANUFACTURER’S 2 PART INSULATION ADHESIVE. CRICKET VALLEY WILL BE 3/12 SLOPE IN PLAN VIEW. • INSTALL 1/2” DENSPRIME COVER BOARD ADHERED WITH MANUFACTURER’S 2 PART INSULATION ADHESIVE. • INSTALL 3 PLY SBS MODIFIED BUILT UP ROOF SYSTEM WITH WHITE GRANULES MEETING OR EXCEEDING SRI INDEX OF 79. • ROOF SYSTEM WILL BE DESIGNED TO COMPLY WITH MOA AND/OR IBC WIND UPLIFTS WHICH EVER IS GREATER AND WILL BE UL CLASS A FIRE RATED. • PROVIDE INSTALLER’S 5 YEAR STANDARD LABOR AND MATERIAL WARRANTY. • PROVIDE MANUFACTURER’S STANDARD 20 YEAR NDL LABOR AND MATERIAL WARRANTY WITH 120MPH WIND SPEED ENDORSEMENT (NOTE: THIS IS THE MAXIMUM WIND SPEED PROVIDED BY THE MANUFACTURER). SHEETMETAL FLASHING AND TRIM: INSTALL ROOF RELATED SHEET METAL FLASHINGS AS LISTED BELOW. • INSTALL 24 GA. STANDARD COLOR FACTORY FINISHED COPING AT ROOF IN COMPLIANCE WITH BUR MANUFACTURER’S REQUIREMENTS AND ES-1 COMPLIANT FOR DESIGN WIND UPLIFT. PARAPET FRAMING AND RAISE CURBS: PROVIDE AND INSTALL DIMENSIONAL WOOD FRAMING TO RAISE PARAPETS AND ROOF CURBS TO ACCOMMODATE HEIGHT OF NEW INSULATION. • PROVIDE AND INSTALL A 2X WOOD FRAMED PARAPET WALL TO EXTEND THE EXISTING PARAPET WALL APPROXIMATELY 18”-24”. O INSULATE WALL WITH BATT INSULATION. O SHEET FRONT AND BACK OF PARAPET WALL WITH ½” CDX SHEATHING. O ASSUME STANDARD FRAMING PRACTICES FOR NAILING. O ALL LUMBER TO PRESSURE TREATED (AC2) AND FASTENERS WILL BE HDG O ASSUME ½” WEDGE STYLE BOLT AT 24” OC TO SECURE PARAPET TO CONCRETE. • EXTEND EXISTING ROOF CURBS WITH 2X DIMENSIONAL PRESSURE TREATED LUMBER APPROXIMATELY 12”. PARAPET AND WALL SIDING: INSTALL STANDING SEAM CONCEALED FASTENER METAL PANEL AT EXISTING PARAPET WALL AND NEW EXTENSION. • INSTALL SELF ADHERING AIR/MOISTURE BARRIER AT EXISTING PARAPET WALL AND THE NEW PARAPET EXTENSION. • INSTALL HORIZONTAL HAT CHANNEL AT 2’ OC TO ACCOMMODATE PARAPET SHEATHING THICKNESS AND A FASTENING POINT FOR METAL PANEL CLIPS. • INSTALL 24 GA. STANDARD COLOR FACTORY FINISHED 1.75”X 16” STANDING SEAM SNAP LOCK METAL PANEL WITH CONCEALED CLIPS. • INSTALL 24 GA. STANDARD COLOR FACTORY FINISHED BASE, CORNER AND PENETRATION FLASHINGS ASSOCIATED WITH METAL PANEL SYSTEM. • FILL EXISTING SCUPPER HOLES WITH INSULATION. • PROVIDE MANUFACTURER’S 20 YEAR STANDARD MATERIAL AND FINISH WARRANTY.
    $841K