TECTA AMERICA CORP
UEI: G12FGVBGCKL3CAGE: 328D1ROSEMONT, IL
$2.9M
Obligations · USAspending
Actions Jul '26 – Aug '26
2
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Mar '27
Period of performance through
Top agencies
By obligations · USAspending, all years
- General Services Administration$2.9M · 2 awards
Top NAICS
By obligations · USAspending, all years
- 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing$2.9M
Recent awards
Latest contract actions by start date · USAspending
| Award | Agency | Start | Amount |
|---|---|---|---|
| 47PD5126F0254 FORT COLLINS FOB ROOF REPLACEMENT PROJECT - 301 S. HOWES ST., FORT COLLINS, CO 80521 | Public Buildings Service | 08/03/2026 | $467K |
| 47PD5126F0237 DAVID SKAGGS ROOF REPLACEMENT PROJECT - BOULDER COLORADO 80305 | Public Buildings Service | 07/23/2026 | $2.5M |
Expiring contracts
Period of performance ending in the next 18 months · USAspending
- 47PD5126F0237 · General Services Administration$2.5M · ends 03/20/2027
- 47PD5126F0254 · General Services Administration$467K · ends 02/05/2027
Contract vehicles
Vehicles this company holds its own contract on, with or without orders · USAspending IDV records, GSA eLibrary SINs
- GSA Multiple Award Schedule (MAS)ScheduleNo orders on fileGeneral Services AdministrationOrdering through 06/30/202814,022 holdersGS07F0405U238160332999BMSOLM
Single-award IDIQs, BPAs and BOAs open for orders (1)
- THE PURPOSE OF THIS BPA IS TO PROVIDE ROOFING REPAIR SERVICES FOR GSA PBS REGION 8 · BPA · General Services Administration09/14/2027
Expired vehicles (3)
- MFG · IDIQ · Department of the Treasury02/28/2011
- MFG · IDIQ · Department of the Treasury04/30/2012
- ROOFING CONTRACTOR · IDIQ · Smithsonian Institution08/23/2021
Orders are task and delivery orders in USAspending under this company's contract on the vehicle. Open a vehicle to see its other holders, or browse all contract vehicles.
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$126K
Received · FY2025–FY2027
$1.5M
Received · all years
5
Subawards
4
Primes
Top primes
| Prime contractor | Total |
|---|---|
| R.A. BURCH CONSTRUCTION CO., INC. | $1.4M |
| TRIAD NATIONAL SECURITY, LLC | $119K |
| FIRELAKE CONSTRUCTION INC | $64K |
| RQ CONSTRUCTION, LLC | $9K |
Most recent
- $9KMETAL PANEL SHOP DRAWINGS
- −$2K"SET UP AT SITE. PROTECT BUILDING FROM DEBRIS, AND SECURE WORK AREA. PROVIDE ALL NECESSARY EQUIPMENT REQUIRED FOR LIFTING MATERIAL AND EQUIPMENT ON TO THE ROOF. INSTALL A SBS MODIFIED BITUMEN VAPOR RETARDER. INSTALL A BASE LAYER OF 3” AND 3.5” ISO INSULATION TO THE DECK USING MECHANICAL FASTENERS. INSTALL A ¼” TAPERED ISO INSULATION SYSTEM PER SHOP DRAWINGS IN AN EFFORT TO MINIMIZE PONDING WATER ON THE ROOF. INSTALL A TOP LAYER OF 5/8” DENSDECK PRIME OVER THE BASE LAYERS USING MECHANICAL FASTENERS. INSTALL TAPERED SUMPS AT ALL OVERFLOW SCUPPERS TO AID IN DRAINAGE. INSTALL 2” ISO INSULATION TO INTERIOR PARAPET WALLS USING MECHANICAL FASTENERS. INSTALL 5/8” FIRE TREATED PLYWOOD TO INTERIOR PARAPET WALLS AS NOTED ON DETAIL 4 OF A301. INSTALL AN ELEVATE 90 MIL ECOWHITE EPDM ROOFING SYSTEM IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS. INSTALL ELEVATE ECOWHITE EPDM BASE FLASHINGS AT ALL PERIMETERS, MECHANICAL UNITS, AND ROOF TO WALL DETAILS IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS. BACKFILL CHIMNEY DEMO AREA WITH NEW INSULATION TO MATCH EXISTING ROOF SYSTEM, TIE-IN TO EXISTING ROOF SYSTEM AS RECOMMENDED BY MANUFACTURER. INSTALL LOOSE-LAID BACKER ROD ALONG TRANSITION TO NEW ROOF. FABRICATE AND INSTALL NEW .040” PREFINISHED COPING AT ROOF PERIMETER. FABRICATE AND INSTALL NEW GALVANIZED METAL KEEPER STRIP AT ROOF PERIMETER DETAIL. FABRICATE AND INSTALL TWO NEW .040” PREFINISHED OVERFLOW SCUPPERS. FABRICATE AND INSTALL NEW 24-GAUGE PREFINISHED DOWNSPOUTS. PREFINISHED GALVANIZED METAL TO BE 0.040” AND SHALL BE CHOSEN FROM MANUFACTURER’S STANDARD COLOR CHART. PROVIDE A MANUFACTURER’S 20-YEAR 100 MPH WARRANTY"
- $119KC5794 EBERHARD SIGMA ROOF MOD 1
- $66K"SET UP AT SITE. PROTECT BUILDING FROM DEBRIS, AND SECURE WORK AREA. PROVIDE ALL NECESSARY EQUIPMENT REQUIRED FOR LIFTING MATERIAL AND EQUIPMENT ON TO THE ROOF. INSTALL A SBS MODIFIED BITUMEN VAPOR RETARDER. INSTALL A BASE LAYER OF 3” AND 3.5” ISO INSULATION TO THE DECK USING MECHANICAL FASTENERS. INSTALL A ¼” TAPERED ISO INSULATION SYSTEM PER SHOP DRAWINGS IN AN EFFORT TO MINIMIZE PONDING WATER ON THE ROOF. INSTALL A TOP LAYER OF 5/8” DENSDECK PRIME OVER THE BASE LAYERS USING MECHANICAL FASTENERS. INSTALL TAPERED SUMPS AT ALL OVERFLOW SCUPPERS TO AID IN DRAINAGE. INSTALL 2” ISO INSULATION TO INTERIOR PARAPET WALLS USING MECHANICAL FASTENERS. INSTALL 5/8” FIRE TREATED PLYWOOD TO INTERIOR PARAPET WALLS AS NOTED ON DETAIL 4 OF A301. INSTALL AN ELEVATE 90 MIL ECOWHITE EPDM ROOFING SYSTEM IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS. INSTALL ELEVATE ECOWHITE EPDM BASE FLASHINGS AT ALL PERIMETERS, MECHANICAL UNITS, AND ROOF TO WALL DETAILS IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS. BACKFILL CHIMNEY DEMO AREA WITH NEW INSULATION TO MATCH EXISTING ROOF SYSTEM, TIE-IN TO EXISTING ROOF SYSTEM AS RECOMMENDED BY MANUFACTURER. INSTALL LOOSE-LAID BACKER ROD ALONG TRANSITION TO NEW ROOF. FABRICATE AND INSTALL NEW .040” PREFINISHED COPING AT ROOF PERIMETER. FABRICATE AND INSTALL NEW GALVANIZED METAL KEEPER STRIP AT ROOF PERIMETER DETAIL. FABRICATE AND INSTALL TWO NEW .040” PREFINISHED OVERFLOW SCUPPERS. FABRICATE AND INSTALL NEW 24-GAUGE PREFINISHED DOWNSPOUTS. PREFINISHED GALVANIZED METAL TO BE 0.040” AND SHALL BE CHOSEN FROM MANUFACTURER’S STANDARD COLOR CHART. PROVIDE A MANUFACTURER’S 20-YEAR 100 MPH WARRANTY"
- $1.4MPOLYVINYL CHLORIDE ROOFING