Back to contract actions
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
May 9, 2025
End Date
May 8, 2028
NAICS
PSC
Y1JZ
Description
NORFOLK NAVAL SHIPYARD TRIPLEX AND BUILDING 163 REPAIRS
Transactions (6)
| Date | Mod # | Obligation |
|---|---|---|
| May 9, 2025 | 0 | +$121,181,400 |
| Aug 1, 2025 | P00001 | +$0 |
| Sep 25, 2025 | P00002 | +$895,580 |
| Sep 29, 2025 | P00003 | +$353,266 |
| Dec 23, 2025 | P00004 | +$0 |
| Feb 11, 2026 | P00005 | +$0 |
Subcontractors 39$63,705,762 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI MY2CU5T3WSL8 Rigging & hoisting | $29,527 |
UEI QJFJBF8ZBUM8 Hvac - dry equipment - seven (7) single-zone ductless split systems | $26,288 |
UEI UBMJNJQ7S465 Electrical equipment inspections & testing | $45,000 |
UEI RC23MUVGNSE5 Thermal insulation for mechanical systems | $96,400 |
UEI K33TE9KPSZY5 Overhead coiling doors | $223,284 |
UEI G12FGVBGCKL3 Metal panel shop drawings | $8,590 |
UEI PQB1KLS6AGQ5 Aluminum windows & glazing | $193,667 |
UEI EETKEK7Q4WG6 Retractable paint booth enclosure system | $240,746 |
UEI PV6PWHDRLKT5 Spray-applied intumescent thin-film coating system | $600,946 |
UEI HRBEHP6JSUF7 Plastic-laminate-clad architectural cabinets & solid surffacing | $65,150 |
UEI TP6KC9GBJJ69 High concrete resinous epoxy floors | $93,980 |
UEI Q59YJK27AV44 Heating, ventilation, and air conditioning (hvac) install | $249,600 |
UEI QK56UCAQFJU6 Supply - plumbing fixtures & equipment | $16,046 |
UEI W4S6SSAMV463 Stucco repair & restoration | $288,235 |
UEI LB2EHML75VW7 Testing, adjusting, balancing (tab) | $32,957 |
UEI ZDLJEETX7QQ8 Firestopping | $352,382 |
UEI WVTLWF7X4LV1 Modular buildings | $163,048 |
UEI N5MJRKJKK323 Roof systems | $5,315,933 |
UEI DJMLFD2967E5 Supply - hvac dry equipment | $230,635 |
UEI UM5PAJF5NQK9 Framing, insulation, drywall, acoustical ceiling tiles | $2,351,350 |
UEI H8RGPKABML13 Hard tiling & resilient flooring | $209,314 |
UEI J3Z5TJXCENE3 Supply - hvac air distribution | $56,795 |
UEI NNELWJDN84A3 Mesh partitions & gates, chain link fence & gates, double & single security gates, all hardware & accessories. | $182,390 |
UEI X3KUHM7J4K53 Structural steel, steel framing, and misc. metals | $1,778,610 |
UEI ZS2JRBG47XE4 Exterior signage & interior signage | $195,851 |
UEI MCXYRM8CFWP5 Masonry, brick & masonry restoration | $2,102,936 |
UEI EQSVNVXYLS95 Supply - hvac dry equipment | $150,605 |
UEI KKG4GM2V15L9 Furniture, fixtures & equipment (ff&e) - cabinets, chairs, desks, lights, microwave, refrigerator, coffee maker, ice maker, fire extinguisher, markerboard, waste baskets. | $949,671 |
UEI DDCYK2Y3J3K1 Building & site demolition, abatement & earthwork | $4,661,911 |
UEI FNQ7H7PT18W9 Swing space site demolition | $38,800 |
UEI H7MBTVPT7AN8 Micropiles | $2,677,000 |
UEI UKHTZTAB38A1 Swing space tie down design | $6,500 |
UEI T2X8B797QGK3 Survey & staking | $63,465 |
UEI EL2KTJ2H2LH8 Site utilities & site demolition | $219,793 |
UEI YDE8SN6MMED9 All fire sprinkler systems | $9,930,527 |
UEI Y5P3FEFWMMY6 Cast-in-place concrete | $1,469,810 |
UEI R5PKHW72L794 All electrical demolition, electrical, lighting, buildign telecommunication cabling systems, electronic safety & security system, interior fire alarm & mass notification, lightning protection systems, underground electrical distribution, and telecom outside plant. | $28,135,893 |
UEI QDA8JKEWN1Z6 Fire protection engineering consulting services & third party firestopping inspections | $206,000 |
UEI F8S1BF56LFY9 Special inspections, material testing & field engineering | $46,127 |