FedOps logoFedOps

WATKINS ENVIRONMENTAL, INC

UEI: GR1VB6FAUGM7
Browse awards
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$3.1M
Received · FY2025–FY2027
$3.1M
Received · all years
5
Subawards
3
Primes

Top primes

Prime contractorTotal
Harper Construction Company, Inc.$2.7M
STAMPEDE VENTURES, INC.$267K
DPR-RQ CONSTRUCTION, LLC$137K

Most recent

  • 05/06/2026 HARPER CONSTRUCTION COMPANY, INC. · N6247324F4416 · Department of Defense (DOD)
    BUILDING DEMOLITION
    $545K
  • 03/17/2026 HARPER CONSTRUCTION COMPANY, INC. · W912QR25C0022 · Department of Defense (DOD)
    HAZARDOUS ABATEMENT
    $135K
  • 02/18/2026 STAMPEDE VENTURES, INC. · W9127825FA175 · Department of Defense (DOD)
    CLIN 0001 – BASE - REPLACE PRE-SURGERY PREP FLOOR 1.001 REMOVE APPROXIMATELY 100 SF PORCELAIN TILE 1.002 REMOVE VINYL SHEET FLOORING 1.003 REMOVE VCT TILE 1.004 REMOVE BASE COVE 1.005 THE CONTRACTOR SHALL THEN REMOVE ALL ADHESIVE RESIDUAL FROM THE FLOOR, THIS WOULD ALSO APPLY THE BASE COVE REMOVAL AS WELL. 1.006 DISPOSAL 1.00 LOAD 1.007 PATH OF TRAVEL PROTECTION CLIN 0002 – BASE – REPLACE PACU/CORR/OFFICES FLOORS 2.001 REMOVE PORCELAIN TILE 2.002 REMOVE VINYL SHEET FLOORING 2.003 REMOVE VCT TILE 2.004 REMOVE BASE COVE 2.005 THE CONTRACTOR SHALL THEN REMOVE ALL ADHESIVE RESIDUAL FROM THE FLOOR, THIS WOULD ALSO APPLY TO THE BASE COVE REMOVAL AS WELL. 2.006 DISPOSAL 2.008 PATH OF TRAVEL CLIN 0003 – BASE - REPLACE OR 1&2 FLOORS 3.001 REMOVE PORCELAIN TILE 3.002 REMOVE VINYL SHEET FLOORING 3.003 REMOVE VCT TILE 3.004 REMOVE BASE COVE 3.006 THE CONTRACTOR SHALL THEN REMOVE ALL ADHESIVE RESIDUAL FROM THE FLOOR THIS WOULD ALSO APPLY TO THE BASE COVE REMOVAL AS WELL. 3.007 DISPOSAL 3.008 PATH OF TRAVEL CLIN 0004 – BASE - REPLACE OR 3&4 STERILE WORK AREA/SCRUB FLOORS 4.001 REMOVE VINYL SHEET FLOORING 4.002 REMOVE VCT TILE 4.003 REMOVE BASE COVE 4.005 THE CONTRACTOR SHALL THEN REMOVE ALL ADHESIVE RESIDUAL FROM THE FLOOR, THIS WOULD ALSO APPLY TO THE BASE COVE REMOVAL AS WELL. 4.006 DISPOSAL 4.007 PATH OF TRAVEL CLIN 0005 – BASE - REPLACE OR, CREW LOCKERS AND FAMILY WAITING ROOM 5.001 REMOVE VINYL SHEET FLOORING AND COVE BASE 5.002 REMOVE CARPET AND COVE BASE 5.003 THE CONTRACTOR SHALL THEN REMOVE ALL ADHESIVE RESIDUAL FROM THE FLOOR, THIS WOULD ALSO APPLY TO THE BASE COVE REMOVAL AS WELL. 5.005 DISPOSAL - CONTRACTOR SHALL RELOCATE SHUTS FOR DEBRIS REMOVAL AFTER COMPLETION OF CLIN 0003 TO START AND COMPLETE CLIN 0004, WITHOUT HINDERING OR INTERFERING WITH FIRE LANES, EMERGENCY AMBULATORY ENTRANCE AND/OR EMERGENCY ROOM ENTRANCE 5.006 PATH OF TRAVEL.
    $267K
  • 10/13/2025 HARPER CONSTRUCTION COMPANY, INC. · N6247325F0354 · Department of Defense (DOD)
    BUILDING DEMOLITION
    $2.0M
  • 10/08/2025 DPR-RQ CONSTRUCTION, LLC · N6247325F0260 · Department of Defense (DOD)
    DEMOLITION
    $137K