PIIDW9127825FA175DELIVERY ORDER

STAMPEDE VENTURES, INC.

UEI: WT4BZHCLS8X7
$1,598,604.44
Awarding Agency
Sub-Agency
Department of the Army
Start Date
September 8, 2025
End Date
May 15, 2026
NAICS
PSC
Z2DA
Transactions (3)
DateMod #Obligation
Sep 8, 20250+$1,694,362
Sep 15, 2025P00001-$82,142
Jul 31, 2026P00002-$13,616
Subcontractors 4$1,012,329 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI GR1VB6FAUGM7
Clin 0001 – base - replace pre-surgery prep floor 1.001 remove approximately 100 sf porcelain tile 1.002 remove vinyl sheet flooring 1.003 remove vct tile 1.004 remove base cove 1.005 the contractor shall then remove all adhesive residual from the floor, this would also apply the base cove removal as well. 1.006 disposal 1.00 load 1.007 path of travel protection clin 0002 – base – replace pacu/corr/offices floors 2.001 remove porcelain tile 2.002 remove vinyl sheet flooring 2.003 remove vct tile 2.004 remove base cove 2.005 the contractor shall then remove all adhesive residual from the floor, this would also apply to the base cove removal as well. 2.006 disposal 2.008 path of travel clin 0003 – base - replace or 1&2 floors 3.001 remove porcelain tile 3.002 remove vinyl sheet flooring 3.003 remove vct tile 3.004 remove base cove 3.006 the contractor shall then remove all adhesive residual from the floor this would also apply to the base cove removal as well. 3.007 disposal 3.008 path of travel clin 0004 – base - replace or 3&4 sterile work area/scrub floors 4.001 remove vinyl sheet flooring 4.002 remove vct tile 4.003 remove base cove 4.005 the contractor shall then remove all adhesive residual from the floor, this would also apply to the base cove removal as well. 4.006 disposal 4.007 path of travel clin 0005 – base - replace or, crew lockers and family waiting room 5.001 remove vinyl sheet flooring and cove base 5.002 remove carpet and cove base 5.003 the contractor shall then remove all adhesive residual from the floor, this would also apply to the base cove removal as well. 5.005 disposal - contractor shall relocate shuts for debris removal after completion of clin 0003 to start and complete clin 0004, without hindering or interfering with fire lanes, emergency ambulatory entrance and/or emergency room entrance 5.006 path of travel.
$266,782
UEI DJBJVD1RNAE3
Site survey 35% design submission construction administration
$30,000
UEI T1M7N1S5VHX3
Subcontractor shall prep-scarify/grind concrete to csp 3-4, cut keyways around drains and perimeters and vacuum clean, patch holes and cracks with epoxy gel, apply self-leveling base coat of urethane cement and broadcast sand to refusal, trowel 6" integral, epoxy cove around perimeters and apply two coats of ec-102 polyaspartic topcoat. the color is selected as concrete gray.
$416,572
UEI FZR2B87CJWE9
Cooling tower fan & motor replacement with associated component replacement period of performance (pop): 07 november 2025 through 15 may 2026 1.0 purpose the purpose of this pws/sow is to define the contractor requirements to remove and replace the existing cooling tower fan and motor assembly and related mechanical components, including the auxiliary shaft kit and associated drive and louver components, and to perform required start-up and verification testing to confirm proper operation. this effort includes the full mechanical/electrical service scope required to return the cooling tower system to operational status in accordance with manufacturer requirements, applicable codes, and safe work practices. 2.0 background the cooling tower fan/motor assembly has been identified for replacement, along with supporting drive and airflow components, to restore reliable performance and prevent equipment failure. the contractor shall provide all labor, supervision, equipment, materials, tools, rigging, and disposal necessary to complete the work. 3.0 scope of work the contractor shall furnish all personnel, labor, supervision, equipment, tools, materials, parts, rigging, disposal, start-up, and verification testing to accomplish the following (based on the attached quote mechanical/electrical scope, expanded for contractual completeness): fsc - or floors 3.1 cooling tower fan and motor work scope (remove and replace) the contractor shall: 1. remove the cooling tower fan and motor currently installed in the equipment. 2. install a new cooling tower fan and motor, including all blades (as applicable/configured). 3. remove and replace the following components: o auxiliary shaft kit o bearings o bushings o motor sheave o motor bushing o fan belts o louver media o louver screening/screen parts 4. verify the operational status of the cooling tower after installation. 5. clean surrounding area of debris and work material. 6. restore power upon completion of the work. 7. perform receiving, unloading, storage, handling, and placement of required components and materials. 8. provide start-up, commissioning support as required, and verification testing, including functional checks and operational validation. (these scope elements are derived from the mechanical/electrical section of the attached quote.) fsc - or floors 4.0 performance requirements / technical requirements 4.1 general requirements • work shall be completed in a professional manner by qualified personnel experienced in cooling tower mechanical equipment. • contractor shall comply with all applicable osha requirements and site safety rules. • contractor shall protect surrounding equipment, building systems, and finished surfaces from damage. • all replacement components shall be new (not used/refurbished unless explicitly approved in writing). 4.2 mechanical requirements • proper alignment and installation of auxiliary shaft kit and bearings. • correct belt tensioning and sheave alignment to prevent premature wear. • ensure fan rotation direction is correct. • ensure fan blade pitch (if adjustable) is set consistently and per manufacturer recommended settings. • confirm louvers are installed securely and allow proper airflow while preventing intrusion. 4.3 electrical requirements • contractor shall ensure power is isolated before work begins (lockout/tagout). • contractor shall restore power and confirm safe motor operation. • contractor shall verify voltage/phase compatibility of motor and existing electrical feed. • contractor shall coordinate with site personnel as required for shutdown/restoration. 5.0 labor requirements (included) the contractor shall provide all labor necessary to complete the work, including but not limited to: • site supervisor/foreman • hvac/cooling tower mechanic technicians • electrician (as needed for disconnect/reconnect, controls verification) • rigging support personnel (as required) • safety support (as required by site) labor includes: • mo
$298,975