Back to contract actions
Awarding Agency
Sub-Agency
Department of the Air Force
Start Date
July 21, 2025
End Date
August 21, 2026
NAICS
PSC
Z2JZ
Transactions (3)
| Date | Mod # | Obligation |
|---|---|---|
| Jul 17, 2025 | 0 | +$903,011 |
| Oct 1, 2025 | P00001 | +$0 |
| Nov 17, 2025 | P00002 | +$0 |
Subcontractors 3$652,371 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI PA5AQJLCP751 Abatement of absestos and or lead based materials. hazardous material selective lead-based paint (lbp) abatement or asbestos abatement of existing hvac abatement of acm or lead: equipment with approved workers in ppe. demolition to be performed under a regulated area with dust control and a competent person / supervisor. all areas to be properly marked and protected during abatement / demo activities | $14,025 |
UEI TXV3QMCCCWF8 Heating, ventilation and air conditioning (hvac) system per soo xumu 14-1014b dated march 06, 2025.
we include only the following in our quotation:
• demo all mechanical equipment
• provide install new air handler connecting to existing duct
• provide and install new condensing unit
• provide install new boiler
• provide install new boiler pumps connecting to existing pipe
• provide install new vav boxes connecting to existing duct
• provide and install new rooftop exhaust fan
• connect to existing refrigeration piping
• new ddc controls
• start up and check out the system
• test and balance | $523,535 |
UEI MKRBFSUZKW63 Assumptions
1. access to facility will be available during normal working hours monday-friday, 7:00 am to 3:30 pm.
2. a minimum of 2 escorts will be provided by others to support work being performed as required.
3. disruptions / work stoppages for site operations are not expected during work effort.
4. hvac unit replacement will be done as facility allows. no temporary cooling expected.
5. all hvac equipment will be removed and replaced by others with as found configuration.
6. all new hvac units will be reinstalled in the same location as existing.
7. hvac units are currently non-operational and can be replaced as work flow allows. no temporary cooling expected.
8. no hvac equipment to be replaced in clin 002 only duct modification, and new roof exhaust fan.
9. fire alarm programming is outside this scope of work and excluded from this proposal.
10. hvac control work will be provided by others including but not limited to conduit, wire, terminations, field devices,
controllers, programming, and testing.
11. existing breakers, conduit and wiring supporting hvac units from panel to service disconnect are in good operation
condition and will be reused.
12. loto will be provided by axc for all power circuits being worked.
13. electrical installation will follow vsfb standards.
ii. inclusions
clin 001 base bid soo for 7403a (provide power only as necessary per soo)
1. provide power from existing electrical power source to following units:
• vsc-1 (208v 3p-150a) (furnished and installed by others)
• acc-1 condenser (208v 3p-20a) (furnished and installed by others)
• ac-1 indoor unit dx(208v 3p-20a) (furnished and installed by others)
• ac-1 outdoor condenser dx (208v 3p-60a) (furnished and installed by others)
• b-1 boiler (120v 1p-20a) (furnished and installed by others)
• p-1 boiler pump (208v 3p-15a)( furnished and installed by others)
• vav boxes 1 – 11 (furnished and installed by others)
• ddc controller (furnished and installed by others)
2. loto hvac equipment units prior to removal.
3. remove and replace with new electrical disconnects nema 4x ss on exterior, and nema 1 on interior, as necessary
for hvac replacement per soo.
4. install conduit and wire between disconnects and new hvac units.
5. ensure all electrical equipment installed are properly updated and re-labeled.
6. provide and install conduit and cat6 cable from server room to mechanical rooms (nipr network to ddc control
cabinets provided by others). | $114,811 |