DAHL AIR CONDITIONING INC
UEI: TXV3QMCCCWF8
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$2.5M
Received · FY2025–FY2027
$2.5M
Received · all years
7
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| J G CONTRACTING | $2.4M |
| AI SOLUTIONS INC | $110K |
Most recent
- $85KIN ACCORDANCE WITH CONCEPT DRAWINGS DATED 7/11/25, THE STATEMENT OF WORK DATED 7/15/25, THE 95% DESIGN SET DATED 6/1/26, SPECIFICATIONS AND ALL OTHER RELATED CONTRACT DOCUMENTS OF BOTH DEMOLITION PHASE AND CONSTRUCTION PHASE; PROVIDE LABOR, MATERIAL AND EQUIPMENT NECESSARY FOR THE COMPLETION OF: DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) INCLUDES: • DEMO EXISTING REGISTERS, EXHAUST FAN AND UNIT HEATER • CAP EXISTING HYDRONIC LINES TO HEATER • EXHAUST FAN (TAG EF-1) • DRINKING FOUNTAIN (TAG DF-1) • SINK (TAG S-1) • FURNISH AND INSTALL NEW SUPPLY, RETURN AND EXHAUST DUCT AT POINTS OF CONNECTION • FURNISH AND INSTALL NEW SUPPLY, RETURN AND EXHAUST REGISTERS • FURNISH AND INSTALL PLUMBING NEW ANGLE STOPS • FURNISH AND INSTALL HOT WATER TEMPERING VALVE • FURNISH AND INSTALL NEW WATER FAUCET • CONNECT TO EXISTING DRAIN LINE • START UP AND CHECK OUT THE SYSTEM • PRE AND FINAL TEST AND BALANCE • ON SITE PERSONAL TRAINING • ONE-YEAR PARTS AND LABOR WARRANTY ON SUBCONTRACTOR PROVIDED SYSTEM EXCLUDES: LEED POINTS, ASHRAE 15 REQUIREMENTS, SEPTIC TANK, WHITE NOISE GENERATORS, PROJECT ENGINEERING/DESIGN/DRAWINGS, CADD DRAWINGS, SHOP DRAWINGS, POLLUTION POLICY, PROFESSIONAL LIABILITY, UMBRELLA POLICY, BONDS, APCD PERMITS, ESCORTS, ASBESTOS AND LEAD PAINT ABATEMENT, CEILING, DUMPSTERS, SOFFIT AND WALL ACCESS DOORS, MOCKUPS, TRENCHING, TREE REMOVAL, FENCING, EXCAVATION, BACKFILLING, CONCRETE, CONDENSATE DRAIN PIPING, CUTTING, FRAMING, PATCHING, DDC CONTROLS, HIGH VOLTAGE ELECTRICAL, CONDUITS, PAINTING, FIRE STOPPING, ROOFING, PERMITS, ESCORTS, FEES, AND ANY ITEMS NOT SPECIFICALLY NOTED ABOVE
- $248KIN ACCORDANCE WITH STATEMENT OF OBJECTIVES (SOO) DATED 2/11/2026, BASE EXCELLENCE STANDARDS, SABER MASTER SPECIFICATIONS, DRAWINGS, RFI’S AND ALL OTHER CONTRACT DOCUMENTS; PROVIDE THE NECESSARY LABOR, MATERIAL AND EQUIPMENT IN ORDER TO COMPLETE THE ITEMS SET FORTH BELOW: • DEMO EXISTING CRAC UNITS AND DISPOSE • DEMO OF EXISTING CEILING TO REMOVE AND REPLACE UNITS • PROVIDE AND INSTALL (2) CRAC UNITS • FLUSH EXISTING REFRIGERATION PIPING REUSE IF POSSIBLE • REPLACE REFRIGERANT DRYER CORES • PROVIDE AND INSTALL NEW CONDENSATE DRAIN PIPING • PROVIDE AND INSTALL NEW THERMOSTATS • RECONNECT TO EXISTING SUPPLY AND RETURN DUCTWORK • RECONNECT TO EXISTING ELECTRICAL • PROVIDE TEMPORARY COOLING AND POWER WHILE UNITS ARE BEING REPLACED. • START UP AND CHECK OUT THE SYSTEM • TEST AND BALANCE • ONE-YEAR PARTS AND LABOR WARRANTY ON THE SYSTEM O ADD DDC CONTROLS: $80,080.00 O EQUIPMENT: $93,402.00 O LABOR: $42,145.00 O MATERIAL: $11,715.00 O CEILING T-BAR WORK $4,650.00 O ELECTRICAL: $7,500.00 O DEMO: $4,500.00 O TEST AND BALANCE: $3,850.00 EXCLUSIONS: LEED POINTS, VENTILATION SYSTEM PER ASHRA 15, SEPTIC TANK, WHITE NOISE GENERATORS, PROJECT ENGINEERING/DESIGN/DRAWINGS, CADD DRAWINGS, SHOP DRAWINGS, POLLUTION POLICY, PROFESSIONAL LIABILITY, UMBRELLA POLICY, APCD PERMITS, ESCORTS, ASBESTOS AND LEAD PAINT ABATEMENT, CEILING, DUMPSTERS, SOFFIT AND WALL ACCESS DOORS, MOCKUPS, TRENCHING, TREE REMOVAL, FENCING, EXCAVATION, BACKFILLING, CONCRETE, CUTTING, FRAMING, PATCHING, PAINTING, FIRE STOPPING, ROOFING, PERMITS, ESCORTS, FEES, BONDS, AND ANY ITEMS NOT SPECIFICALLY NOTED ABOVE.
- $746K• REMOVE AND REPLACE (1) CRAC UNIT IN ROOM 12 • REMOVE AND REPLACE (1) FAN COIL UNIT AND CONDENSER IN ROOM 41 • REMOVE AND REPLACE (2) CRAC UNITS IN ROOM 32 • REMOVE AND REPLACE (2) FAN COILS UNITS AND CONDENSERS IN ROOM 35 • REMOVE AND REPLACE (1) CRAC UNITS IN ROOM 28 • REMOVE AND REPLACE (1) CRAC UNITS IN ROOM 31 • REMOVE AND REPLACE REFRIGERATION PIPING • RECONNECT TO EXISTING SUPPLY AND RETURN • PROVIDE TEMPORARY COOLING WHEN UNITS ARE REPLACED • REMOVE AND REPLACE CONDENSATE PIPING • DDC CONTROLS • REMOVE AND REPLACE ANY CORRODED COMPONENTS AND BRACKETS WITH NON-CORROSIVE MATERIAL • START UP AND CHECK OUT THE SYSTEM • TEST AND BALANCE • ONE-YEAR PARTS AND LABOR WARRANTY ON THE SYSTEM PROVIDED BY DAHL A/C
- $417KDAHL AIR CONDITIONING, INC., IS PLEASED TO SUBMIT THE FOLLOWING QUOTATION FOR XUMU24-2436 VSFB BUILDING 8290. WE PROPOSE TO SUPPLY AND INSTALL A NEW CHILLER AND BOILER SYSTEM ACCORDING TO THE STATEMENT OF OBJECTIVES DATED JANUARY 21, 2025 AND RFI DATED MAY 28, 2025. WE INCLUDE ONLY THE FOLLOWING IN OUR QUOTATION: • PROVIDE AND INSTALL NEW TRANE CHILLER • PROVIDE AND INSTALL NEW ELECTRIC BOILER • PROVIDE AND INSTALL NEW MULTI-ZONE AIR HANDLER • PROVIDE AND INSTALL NEMA 4X ELECTRICAL DISCONNECT SWITCHES • PROVIDE AND INSTALL NEW CHILLED WATER PIPING AT POINT OF CONNECTION • PROVIDE AND INSTALL NEW HOT WATER PIPING AT POINT OF CONNECTION • PROVIDE AND INSTALL NEW DUCT CONNECTION AT POINT OF CONNECTION • DRAIN AND FLUSH EXISTING HYDRONIC SYSTEM PIPING • DDC CONTROLS • DUCT AND PIPING INSULATION • START UP AND CHECK OUT THE SYSTEM • ONE-YEAR PARTS AND LABOR WARRANTY ON THE SYSTEM PROVIDED BY DAHL A/C
- $357KPROVIDE AND INSTALL NEW TRANE CHILLER • PROVIDE AND INSTALL NEW CHILLED WATER PIPING AT POINT OF CONNECTION • PROVIDE AND INSTALL NEW NEMA 4X • DRAIN AND FLUSH EXISTING HYDRONIC SYSTEM PIPING • DDC CONTROLS • DUCT AND PIPING INSULATION • START UP AND CHECK OUT THE SYSTEM
- $524KHEATING, VENTILATION AND AIR CONDITIONING (HVAC) SYSTEM PER SOO XUMU 14-1014B DATED MARCH 06, 2025. WE INCLUDE ONLY THE FOLLOWING IN OUR QUOTATION: • DEMO ALL MECHANICAL EQUIPMENT • PROVIDE INSTALL NEW AIR HANDLER CONNECTING TO EXISTING DUCT • PROVIDE AND INSTALL NEW CONDENSING UNIT • PROVIDE INSTALL NEW BOILER • PROVIDE INSTALL NEW BOILER PUMPS CONNECTING TO EXISTING PIPE • PROVIDE INSTALL NEW VAV BOXES CONNECTING TO EXISTING DUCT • PROVIDE AND INSTALL NEW ROOFTOP EXHAUST FAN • CONNECT TO EXISTING REFRIGERATION PIPING • NEW DDC CONTROLS • START UP AND CHECK OUT THE SYSTEM • TEST AND BALANCE
- $110KUNSCHEDULED MAINTENANCE