| Date | Mod # | Obligation |
|---|---|---|
| May 1, 2026 | 0 | +$341,439 |
Subcontractors 1$247,842 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI TXV3QMCCCWF8 In accordance with statement of objectives (soo) dated 2/11/2026, base excellence standards, saber master specifications, drawings, rfi’s and all other contract documents; provide the necessary labor, material and equipment in order to complete the items set forth below:
• demo existing crac units and dispose
• demo of existing ceiling to remove and replace units
• provide and install (2) crac units
• flush existing refrigeration piping reuse if possible
• replace refrigerant dryer cores
• provide and install new condensate drain piping
• provide and install new thermostats
• reconnect to existing supply and return ductwork
• reconnect to existing electrical
• provide temporary cooling and power while units are being replaced.
• start up and check out the system
• test and balance
• one-year parts and labor warranty on the system
o add ddc controls: $80,080.00
o equipment: $93,402.00
o labor: $42,145.00
o material: $11,715.00
o ceiling t-bar work $4,650.00
o electrical: $7,500.00
o demo: $4,500.00
o test and balance: $3,850.00
exclusions: leed points, ventilation system per ashra 15, septic tank, white noise generators, project engineering/design/drawings, cadd drawings, shop drawings, pollution policy, professional liability, umbrella policy, apcd permits, escorts, asbestos and lead paint abatement, ceiling, dumpsters, soffit and wall access doors, mockups, trenching, tree removal, fencing, excavation, backfilling, concrete, cutting, framing, patching, painting, fire stopping, roofing, permits, escorts, fees, bonds, and any items not specifically noted above. | $247,842 |