Back to contract actions
Awarding Agency
Sub-Agency
Department of the Air Force
Start Date
October 1, 2025
End Date
September 3, 2027
NAICS
PSC
Z2JZ
Transactions (1)
| Date | Mod # | Obligation |
|---|---|---|
| Sep 25, 2025 | 0 | +$2,394,594 |
Subcontractors 7$1,092,095 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI PA5AQJLCP751 1.1 project environmental submittals : prior to mobilization and any onsite activities, mec inc., will prepare and submit a
draft abatement / demolition plans as required by cal osha or the em-385-1-1 manual, approved by the buyer, also in
accordance with vafb specifications 01000 & 01010, base environmental management 30 ces/ceiec
1.2 hazardous material asbestos abatement: removal and disposal of existing class ii non-friable asbestos containing
materials (acm): abatement of carpet over acm vinyl composite tile (vct) with black mastic (approx. 2,670 sq. ft.) on
rooms 101, 106, 106b, 105/108, 111, 11a and 112. abatement will be performed within a negative pressure enclosure
(npe), mastic will be removed using low-odor non-hazardous soy-base mastic remover and re-clean with environ wash 805,
hepa vacuum area, encapsulate and leaving area ready for new installation on vandenberg sfb building 9005
all work will be performed in strict accordance with all federal, state and local regulations.
selective soft demolition: removal and disposal of existing (2) interior walls, doors, floor, (approx. 24 lf, 6 door units,
2,670 sq ft ceiling), (4) demo fixtures and equipment, demo lockers , benches (approx. 90 lockers 8 benches), (9) demo
fire protection equipment (approx. 3 units), (20) demo service counter (approx. 2 units), (22) demo folding door and
hardware at entry gymnasium in rooms 101, 106, 106b, 105/108, 111, 11a and 112 on vandenberg space force base
building 9005.
inconsistent or contrary. in the event of a partial acceptance of the work proposed, a revised proposal would be provided for incorporation into the agreement document.
selective hard demolition: removal and disposal of existing (3) cmu block wall (approx. 27 lf, 4 locations) new wall door opening and door lay-out, (30) demo cmu structure walls on mens locker room 112 on building 9005 | $88,394 |
UEI KR6JWEDJKMJ1 In accordance with concept drawings dated 7/11/25, the statement of work dated 7/15/25, the 95% design set
dated 6/1/26, specifications and all other related contract documents of both demolition phase and construction
phase; provide labor, material and equipment necessary for the completion of the items set forth below:
lighting and/or lighting controls
• furnish and install emergency egress lighting per drawings
• furnish and install lighting controls as per drawings
• furnish and install indicated branch mc cable, emt conduit, and wire per drawings
• include all required testing and training
• provide required for safe-off conditions for existing lighting branch circuitry
primary, secondary, and/or distribution power
• furnish and install required circuit breakers for panel b & panel c. feeder and panel board to remain
• furnish and install power for receptacle locations for new walls as indicated on drawings
• furnish and install branch mc cable, emt conduit, and wire per design scope of work
• furnish and install new breakers for added branch circuitry
• furnish and install required receptacles with standard plates
• furnish and install indicated new grounding per reference documents
• provide required safe-off conditions of power branch circuitry
low voltage systems
• furnish and install indicated fire alarm conduits and boxes only as per drawing sheets fa-100, 102 & 103. supply cabling, parts and smarts, all required programming and any demolition of original system provided by other.
clarifications:
• bid alternate a: allowance for data conduits to accessible ceilings to be included
• rfi’s / addenda: none noted | $156,800 |
UEI RMMVP3GTPQM9 In accordance with concept drawings dated 7/11/25, the statement of work dated 7/15/25, the 95% design set
dated 6/1/26, specifications and all other related contract documents of both demolition phase and construction
phase; provide labor, material and equipment necessary for the completion of: division 09 – finishes
09 51 00 – acoustical ceilings
includes:
suspended acoustical ceilings in rooms: 101a, 101b, 101c, 102a, 102b, 102c, 104, 104a, 104b, 108, 108a, 110, 110a, 112a per a-101.
• armstrong suprafine 9/16” heavy duty ceiling grid system with 7/8” wall molding and berc-2 seismic clips
• armstrong calla 24” x 24” x 1” square tegular edge ceiling tile #2824 per keynote #9 sheet a-101 | $36,151 |
UEI DQH5LN9QJEC7 1. coordination with collings and associates development of famns plans, equipment/materials
and specifications.
2. install new nfpa 72, 2022, ufc 3-600-01, and ufc 4-021-01 compliant fire alarm system
with voice evacuation capabilities (famns).
a. inclusive of full coverage smoke detection throughout building. beam smoke
detectors within the gymnasium area. rev: sow 11 jul 25.
3. final inspection coordination and testing with local ahj | $265,525 |
UEI TXV3QMCCCWF8 In accordance with concept drawings dated 7/11/25, the statement of work dated 7/15/25, the 95% design set dated 6/1/26, specifications and all other related contract documents of both demolition phase and construction phase; provide labor, material and equipment necessary for the completion of:
division 23 – heating, ventilation, and air conditioning (hvac)
includes:
• demo existing registers, exhaust fan and unit heater
• cap existing hydronic lines to heater
• exhaust fan (tag ef-1)
• drinking fountain (tag df-1)
• sink (tag s-1)
• furnish and install new supply, return and exhaust duct at points of connection
• furnish and install new supply, return and exhaust registers
• furnish and install plumbing new angle stops
• furnish and install hot water tempering valve
• furnish and install new water faucet
• connect to existing drain line
• start up and check out the system
• pre and final test and balance
• on site personal training
• one-year parts and labor warranty on subcontractor provided system
excludes: leed points, ashrae 15 requirements, septic tank, white noise generators, project engineering/design/drawings, cadd drawings, shop drawings, pollution policy, professional liability, umbrella policy, bonds, apcd permits, escorts, asbestos and lead paint abatement, ceiling, dumpsters, soffit and wall access doors, mockups, trenching, tree removal, fencing, excavation, backfilling, concrete, condensate drain piping, cutting, framing, patching, ddc controls, high voltage electrical, conduits, painting, fire stopping, roofing, permits, escorts, fees, and any items not specifically noted above | $84,765 |
UEI N9KBTQRLLA21 Design:
perform (1) site visit.
provide demolition and new power and lighting plan view drawings.
provide egress photometric calculations for areas under the scope of work.
coordination with dor & construction team on design requirements.
attend (4) design coordination virtual conference calls.
attend (2) in-person design review meetings, 65% & 95%.
provide electrical engineering design specifications for new lighting and power scope of
work.
provide electrical engineering design submittal requirements per “attch
01_242219_sow_20250715” for 35%, 65%, 95%, and 100% design submittal.
participate in 35%, & 100% design review virtual meetings & incorporate vsfb comments
into design.
construction admin:
perform (1) site visit with project team for government bod.
review of contractor submittals for general conformance.
participate in (16) weekly conference calls.
answer contractor rfi’s.
incorporate record drawings for final submittal to vsfb. | $20,200 |
UEI KKETR86APJD4 Perform as dor providing multi-discipline design support services including civil, structural, architectural fire and mechanical. | $440,260 |