ALPHA FIRE UNLIMITED
UEI: DQH5LN9QJEC7
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$435K
Received · FY2025–FY2027
$435K
Received · all years
3
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| J G CONTRACTING | $399K |
| CM CONSTRUCTION SERVICES, INC. | $36K |
Most recent
- $266K1. COORDINATION WITH COLLINGS AND ASSOCIATES DEVELOPMENT OF FAMNS PLANS, EQUIPMENT/MATERIALS AND SPECIFICATIONS. 2. INSTALL NEW NFPA 72, 2022, UFC 3-600-01, AND UFC 4-021-01 COMPLIANT FIRE ALARM SYSTEM WITH VOICE EVACUATION CAPABILITIES (FAMNS). A. INCLUSIVE OF FULL COVERAGE SMOKE DETECTION THROUGHOUT BUILDING. BEAM SMOKE DETECTORS WITHIN THE GYMNASIUM AREA. REV: SOW 11 JUL 25. 3. FINAL INSPECTION COORDINATION AND TESTING WITH LOCAL AHJ
- $133K1. PRODUCE AN FPE STAMPED, FIRE ALARM ONLY ENGINEERING PACKAGE FOR REVIEW BY VSFB FD. 2. PROVIDE AND INSTALL AN NFPA 72, 2022, AND UFC3-600-01 COMPLIANT FIRE ALARM ONLY SYSTEM, PER THE APPROVED PLANS. A. INCLUSIVE OF CLASSROOM RENOVATION AREA. B. REMOVAL OF EXISTING FIRE ALARM SYSTEM AFTER CROSS OVER. 3. PROVIDE FINAL INSPECTION COORDINATION WITH LOCAL AHJ.
- $36KSUBMIT EXISTING SHOP DRAWINGS WITH MODIFICATIONS SHOWN FOR NEW DUCT DETECTION. 3. REMOVE EXISTING CEILING MOUNTED DEVICES AND MAKE TEMPORARY JUNCTION BOXES AT THOSE LOCATIONS. A. FIRE ALARM SYSTEM TO REMAIN ACTIVE WHILE CONSTRUCTION IS GOING ON. 4. SAFELY RETAIN AND STORE DEVICE ONSITE FOR FUTURE REINSTALLATION IN EXISTING LOCATIONS. 5. MODIFICATION TO AS-BUILTS BASED UPON MODIFICATIONS TO THE FIRE ALARM SYSTEM. 6. 100% SYSTEM TESTING AT COMPLETION OF PROJECT. 7. CONDUCT FIRE ALARM FINAL ACCEPTANCE TESTING WITH LOCAL FIRE DEPT. 8. PROVIDE NFPA RECORD OF COMPLETION