J G CONTRACTING

UEI: KQLSDGDM8YJ1
$411,609.27
Awarding Agency
Sub-Agency
Department of the Air Force
Start Date
July 21, 2025
End Date
January 7, 2026
NAICS
PSC
Z2LB
Transactions (1)
DateMod #Obligation
Jul 15, 20250+$411,609
Subcontractors 3$235,675 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI WEHRA1DEZRV9
1" leveling course and 2" hot mix asphalt overlay • take over existing asphalt in 41,400 sf • clean and prep for leveling course • apply ss1h tack coat and overlay with 1" hot mix asphalt • clean, apply pg 64-10 hot oil and place mirafi paving fabric. • pave with new 2" hot mix asphalt
$192,500
UEI TEQKM7226LB7
Crack pcc pavement: • utilizing a t8600 badger breaker (guillotine); crack existing 4,575 square yards of up to 8” thick, bare, non-reinforced pcc pavement to attain 18” – 36” cracked pieces (seating and coring are excluded). • one mobilization / one concrete breaker
$30,000
UEI L1HCMN9QMJL1
Striping & raised reflective markers. included: • 950 lf painted centerline stripe (4" broken yellow) w/ pavement markers • 1900 lf painted fog line stripe (4" solid white) • 3 ea painted "stop" markings and limit lines • 1 ls mobilization
$13,175