APODACA PAVING, INC,
UEI: WEHRA1DEZRV9CAGE: 20QP7GROVER BEACH, CA
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$954K
Received · FY2025–FY2027
$954K
Received · all years
8
Subawards
2
Primes
Top primes
| Prime contractor | Total |
|---|---|
| J G CONTRACTING | $485K |
| RDZ CONTRACTORS, INC. | $470K |
Most recent
- $141KFACILITY #8173 VSFB ESTIMATE 1.5 "HOT MIX ASPHALT CONFORM GRIND AND OVERLAY WITH 8" R&R, STRIPING AND SIGNS 1. TAKE OVER EXISTING ASPHALT IN 44,280 SF 2. CONFORM GRIND EDGES 1.5" FOR NEW HOT MIX ASPHALT OVERLAY 3. DIG OUT 8" DEPTH AND HAUL OFF APPROX. 3,500 SF 4. REPLACE DIG OUT AREA WITH 6" CL2 AGGREGATE BASE AND 2" HOT MIX ASPHALT 5. CLEAN WITH INDUSTRIAL SIZE BROOMS, WIRE BROOMS AND OR SWEEPERS. 6. PLACE DEERY 210 HOT CRACK FILL IN VARIOUS LOCATIONS 7. APPLY SS1H TACK COAT 8. PAVE WITH 1.5" HOT MIX ASPHALT 9. STRIPING AND SIGNS PER SOO $141,250.00 TOTAL
- $101KPHASE 1, 2 AND 3 - RUBBERIZED HOT CRACK FILL CLEAN AND PREP CRACKS 1. 1/4" AND WIDER WITH WIRE BROOMS AND INDUSTRIAL SIZE BLOWERS OR HIGH PRESSURE AIR COMPRESSOR. 2. PLACE HOT APPLIED HIGH PERFORMANCE HOT CRACK FILL WITH HIGH TEMPERATURE CRACK FILL MACHINE. $10,900.00 PHASE 1 AND 3- 2" HOT MIX ASPHALT GRIND AND PATCH 1. GRIND AND PATCH BACK WITH 14 TONS HOT MIX ASPHALT. $17,500.00 PHASE 3 - 1.5" CONFORM GRIND AND OVERLAY 1. TAKE OVER EXISTING ASPHALT 2. DIG OUT OR GRIND 2” IN DEPTH 3. HAUL OFF TO AN OFF-SITE LOCATION 4. GRADE OR CLEAN AND TACK WITH SS1H. 5. PAVE WITH 2” HOT MIX ASPHALT $61,100.00 PHASE 1,2 AND 3 STRIPING AND SIGNAGE STRIPE PER EXISTING AND REMOVE/REPLACE 2 ACCESSIBLE STALLS $36,250.00
- $133KREMOVE AND REPAIR FAILED AREAS.
- $193K1" LEVELING COURSE AND 2" HOT MIX ASPHALT OVERLAY • TAKE OVER EXISTING ASPHALT IN 41,400 SF • CLEAN AND PREP FOR LEVELING COURSE • APPLY SS1H TACK COAT AND OVERLAY WITH 1" HOT MIX ASPHALT • CLEAN, APPLY PG 64-10 HOT OIL AND PLACE MIRAFI PAVING FABRIC. • PAVE WITH NEW 2" HOT MIX ASPHALT
- $80KSEAL COAT PARKING LOT. GRIND AND OVERLAY SECTION OF PARKING LOT. STRIPE AND SIGN.
- $241KGRIND AND OVERLAY. REMOVE AND REPAIR FAILED AREAS. TRENCH PAVE FOR NEW STORM DRAIN LINE. STRIPE AND SIGN PER APPROVED PLAN.
- $16KTRENCH PAVE FOR NEWLY INSTALLED STORM DRAIN PIPE
- $50KPAVING- TAKE OVER EXISTING ASPHALT. CLEAN WITH INDUSTRIAL SIZE BROOMS, WIRE BROOMS AND/OR SWEEPER. APPLY SS1H TACK COAT AND PAVE WITH HOT MIX ASPHALT. HMA PATCHING: PATCH BACK WITH HOT MIX ASPHALT. HOT CRACK FILL: CLEAN AND PREP CRACKS 1/4" AND WIDER WITH WIRE BROOMS AND INDUSTRIAL SIZE BLOWERS OR HIGH PRESSURE AIR COMPRESSOR. PLACE HOT APPLIED HIGH PERFORMANCE HOT CRACK FILL WITH HIGH TEMPERATURE CRACK FILL MACHINE.