| Date | Mod # | Obligation |
|---|---|---|
| Apr 21, 2026 | 0 | +$415,965 |
Subcontractors 2$298,436 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI WEHRA1DEZRV9 Phase 1, 2 and 3 - rubberized hot crack fill
clean and prep cracks 1. 1/4" and wider with wire brooms and industrial size blowers or high pressure air
compressor.
2. place hot applied high performance hot crack fill with high temperature crack fill machine.
$10,900.00
phase 1 and 3- 2" hot mix asphalt grind and patch
1. grind and patch back with 14 tons hot mix asphalt.
$17,500.00
phase 3 - 1.5" conform grind and overlay
1. take over existing asphalt
2. dig out or grind 2” in depth
3. haul off to an off-site location
4. grade or clean and tack with ss1h.
5. pave with 2” hot mix asphalt
$61,100.00
phase 1,2 and 3 striping and signage
stripe per existing and remove/replace 2 accessible stalls
$36,250.00 | $100,750 |
UEI DUZLEHHMCYT5 In accordance with the base facilities excellence standards, master saber specifications, drawings, rfi’s and all other contract documents including amendment 01 dated 2/23/26 containing the following:
• statement of objectives (soo), revised 20 feb 2026
• hospital parking layout, revised 20 feb 2026
• photos & site map, revised 20 feb 2026
subcontractor shall provide all labor, material and equipment necessary for the completion of the items set forth below for:
245,700 sf – type 2 slurry seal
inclusions:
• one mobilization
• pre-cleaning by sweeper only
• traffic control for subcontractors work
• mix design and calibrations
• blackrock
• rolling
• work to occur during normal weekday hours and within 3 consecutive days
• schedule work 6 weeks in advance to ensure crew availability | $197,686 |