PIIDHQ003422F0517DELIVERY ORDER

STAMPEDE VENTURES, INC.

UEI: WT4BZHCLS8X7
$8,253,907.77
Awarding Agency
Sub-Agency
Washington Headquarters Services
Start Date
September 29, 2022
End Date
March 12, 2026
NAICS
PSC
Y1AA
Transactions (7)
DateMod #Obligation
Sep 28, 20220+$5,268,840
Oct 20, 2022P00001+$0
Nov 30, 2023P00002+$2,534,243
Dec 28, 2023P00003+$0
Sep 13, 2024P00004+$310,368
Feb 28, 2025P00005+$140,457
Oct 23, 2025P00006+$0
Subcontractors 3$474,764 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI K21HJ3JTATV8
• submittals, complete shop drawings. • hydraulic calculations. fire pump test report to be provided by the facility. • sequence and logistics plan. • sprinkler systems to remain in service. • work to be performed in 2 phases. • identify, cut, cap, make safe. demo and removal by others. • for phase 1, install new main, branch lines, and sprinklers to provide proper protection. connect new main to existing phase 2 main temporarily and connect new feed main to existing feed main in corridor. tie in for final feed main to be completed in phase 2. • for phase 2, install new main, branch lines and sprinklers to provide proper protection. install new feed main from the valve in the stair well to reconnect to the new feed main installed under phase 1. • install new header in the stairwell with 4” welded outlets and provide (1) new control valve assembly to feed our new zone. the other (2) existing control valve assemblies to remain and will be reconnected to the new header outlets. • new purge in the mechanical room as shown. drain to terminate at plumbing drain in the mechanical room or adjacent space. no piping to exterior. plumbing connections by others if required. • new system drain to terminate in the stairwell at the existing main drain riser. • new main and branch lines to be roughed in prior to ceiling framing. • new main to be schedule 40 black steel with roll-grooved ends and new branch lines to be schedule 40 black steel with roll-grooved or threaded ends. • new sprinklers to be semi-recessed with chrome plates, horizontal side wall sprinklers with chrome plates, and brass uprights in exposed ceilings. • new sprinklers to be quick response. • flexible couplings at expansion joints. • hydrostatic testing and assisting the fire alarm sub in testing devices associated with the sprinkler system. • wrap around pipe labels on new main and branch lines. • fire stopping and mineral wool for new penetrations in rated walls. • work shall comply with bid documents, nfpa 13, ufc 3-600-01, and the facility fire marshals requirements.
$282,414
UEI QU4LMJCPF2B3
Phase 1 • furnish and install cpt-1: philadelphia commercial - 24x24 - q100 nylon, 22oz/yd - sound advice tile #54488 - color: hold the line #88300. • furnish and install lvt-1: shaw - 12x24, 2.5mm - terasu terrace #4108v - color: brushwood #08765. • furnish and install sealed concrete - surface treatment / no concrete prep work included (budget: sherwin williams armorseal tread-plex). • furnish and install rb-1: allstate - 4"h rubber base - no. a06. • skimming for resilient (up to 1/8"). • accessories [transition - budget vinyl transition strip]. • attic stock: cpt-1 [3%]. phase 2 • furnish and install cpt-1: philadelphia commercial - 24x24 - q100 nylon, 22oz/yd - sound advice tile #54488 - color: hold the line #88300. • furnish and install rb-1: allstate - 4"h rubber base - no. a06. • accessories. • attic stock: cpt-1 [3%].
$39,890
UEI MQT6UATE7WN4
Furnish and install 900sf sd2500 window film furnish and install 22 laminated glass panels and framing
$152,460