Awarding Agency
Sub-Agency
Department of the Navy
Start Date
September 29, 2025
End Date
October 29, 2027
NAICS
PSC
Z2EA
Transactions (2)
| Date | Mod # | Obligation |
|---|---|---|
| Sep 29, 2025 | 0 | +$43,497,606 |
| May 27, 2026 | P00001 | +$1,083,958 |
Subcontractors 14$20,457,325 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI D68DMNV3CJK9 Exterior and interior explosion proof camera's with servers and licenses. device installation, programming, testing and commissioning | $697,385 |
UEI LP8KKACWKJT1 "provide structural steel for rear loading dock, rear wall bracing, upper floor infill, framing for coater vessel support, lid support, tabletop scale, lift recess, recess scale, hopper, mezzanine, humidifier upper deck roof, valve room roof and exterior stair roof. installation of structural framing for roof deck and sub roof decking.
covered walkway roof framing, emergency chute framing and small and large group conduit racks." | $1,173,236 |
UEI T4XVXC3JGL91 Electrical installation services in 4 buildings and general site electrical support | $6,866,001 |
UEI SQ3FG9FRB434 Installation of concrete pads, curbs, and foundation work | $1,047,768 |
UEI K21HJ3JTATV8 Fire protection installation, sprinklers | $1,033,045 |
UEI ZL3LH37LF183 Qfpe support (fire protection eng.), drawing support, integrated master scheduler, special inspections | $1,134,172 |
UEI HF8BP36NFBV9 Project execution and support, and management, controls o&m data, cybersec testing and training, scada development, testing and training, compressed air panel, control panel building requirements, plc software, factory testing, install, documentation, commissioning and field training. | $2,840,267 |
UEI DA5ARHJK8Z37 Metal stud framing, batt insulation, drywall, gypsum and acoustical ceilings, metal doors, frames and hardware. | $162,993 |
UEI NQXBZFKX6UN6 Surface prep, cleaning, prime and finish painting of 3 facility buildings | $164,543 |
UEI PKLFLRGW7H79 Procurement, installation and testing of monorail crane | $650,000 |
UEI KM1KVDZ8JUF9 24 gauge fabricated metal roof panel assemblies, 24 gauge steel standing seam roof panels, metal flashing and k style gutters. | $376,408 |
UEI GPCDG9C3JUF3 Demolition of building components and relocation of various pieces | $618,000 |
UEI G5GLAB6FJM11 Installation of new ductwork and hvac system, plumbing lines | $3,467,126 |
UEI KJN9YJK8RDU6 Preparation and sealing of concrete floor, removal of existing conductive floor, prep area and install new conductive flooring | $226,381 |