PIIDN0017425C0009DEFINITIVE CONTRACT
$44,581,564.23
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
September 29, 2025
End Date
October 29, 2027
NAICS
PSC
Z2EA
Transactions (2)
DateMod #Obligation
Sep 29, 20250+$43,497,606
May 27, 2026P00001+$1,083,958
Subcontractors 14$20,457,325 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI D68DMNV3CJK9
Exterior and interior explosion proof camera's with servers and licenses. device installation, programming, testing and commissioning
$697,385
UEI LP8KKACWKJT1
"provide structural steel for rear loading dock, rear wall bracing, upper floor infill, framing for coater vessel support, lid support, tabletop scale, lift recess, recess scale, hopper, mezzanine, humidifier upper deck roof, valve room roof and exterior stair roof. installation of structural framing for roof deck and sub roof decking. covered walkway roof framing, emergency chute framing and small and large group conduit racks."
$1,173,236
UEI T4XVXC3JGL91
Electrical installation services in 4 buildings and general site electrical support
$6,866,001
UEI SQ3FG9FRB434
Installation of concrete pads, curbs, and foundation work
$1,047,768
UEI K21HJ3JTATV8
Fire protection installation, sprinklers
$1,033,045
UEI ZL3LH37LF183
Qfpe support (fire protection eng.), drawing support, integrated master scheduler, special inspections
$1,134,172
UEI HF8BP36NFBV9
Project execution and support, and management, controls o&m data, cybersec testing and training, scada development, testing and training, compressed air panel, control panel building requirements, plc software, factory testing, install, documentation, commissioning and field training.
$2,840,267
UEI DA5ARHJK8Z37
Metal stud framing, batt insulation, drywall, gypsum and acoustical ceilings, metal doors, frames and hardware.
$162,993
UEI NQXBZFKX6UN6
Surface prep, cleaning, prime and finish painting of 3 facility buildings
$164,543
UEI PKLFLRGW7H79
Procurement, installation and testing of monorail crane
$650,000
UEI KM1KVDZ8JUF9
24 gauge fabricated metal roof panel assemblies, 24 gauge steel standing seam roof panels, metal flashing and k style gutters.
$376,408
UEI GPCDG9C3JUF3
Demolition of building components and relocation of various pieces
$618,000
UEI G5GLAB6FJM11
Installation of new ductwork and hvac system, plumbing lines
$3,467,126
UEI KJN9YJK8RDU6
Preparation and sealing of concrete floor, removal of existing conductive floor, prep area and install new conductive flooring
$226,381