Back to contract actions
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
May 11, 2026
End Date
June 12, 2026
NAICS
PSC
J998
Transactions (6)
| Date | Mod # | Obligation |
|---|---|---|
| Apr 13, 2026 | 0 | +$611,690 |
| May 12, 2026 | P00001 | +$0 |
| May 18, 2026 | P00002 | +$63,844 |
| Jun 1, 2026 | P00003 | -$15,494 |
| Jun 3, 2026 | P00004 | -$3,907 |
| Jun 5, 2026 | P00005 | +$68,328 |
Subcontractors 4$217,867 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI WA3QAGQERSN5 Accomplish the requirements of work item: 422-11-001 conduit and stuffing tube replacement accomplish. waveforce to accomplish paragraphs 3.1 - 3.2, 3.2.4, and 3.4. and 441-80-001 install antenna 1-3 cable accomplish. waveforce to accomplish paragraphs 3.1 - 3.2, and 3.4 onboard the uss ramage (ddg-61) cmav serm 036-26 located at mayport naval station. iaw all invoked navsea standard items fy-26 and sermc local standard items apply. please see the attached quote dated march 30, 2026 for reference and exceptions. pop: 05/11/2026 - 06/01/2026. ecr poc: greg english 757-409-7769 or greg.english@ecrfab.com. waveforce is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $50,395 |
UEI M8KGYLHWFNE1 Accomplish the requirements for work item: 512-11-001 vaneaxial fan repair. ips to accomplish paragraphs 3.2, 3.2.1 and 3.2.2. onboard the uss ramage (ddg-61) cmav serm 036-26 located at mayport naval station. iaw all invoked navsea standard items fy-26 and sermc local standard items apply. please see the attached quote: 12031648-2 for reference and exceptions. pop: 05/11/2026 - 05/27/2026. ecr poc: greg english 757-409-7769 or greg.english@ecrfab.com. ips is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $40,354 |
UEI JY88JJ3HNS44 Accomplish the requirements of work item: 167-11-001 para 3.5 - 3.5.1 for 009-78; 167-11-002 structural door repair. cmsi to accomplish paragraphs 3.10 - 3.10.1 for 009-78 utilizing gfm; 422-11-001 conduit and stuffing tube replacement accomplish. cmsi to accomplish 009-023 for 009-011 iwo 3.2; 625-11-001 pilot house window replacement accomplish. cmsi to accomplish 009-023 for 009-011 iwo 3.5; 635-11-001 insulation and lagging replacement accomplish. cmsi to accomplish paragraphs 3.1 - 3.2 for 009-011; 523-11-002 countermeasure washdown (cmwd) flush deck nozzle replacement; 532-11-001 electronic cooling water (ecw) valve replacement; 512-11-001 vaneaxial fan repair; and 523-11-001 countermeasure washdown (cmwd) flush deck nozzle repair. cmsi to accomplish 009-023 for 009-011 iwo 3.1. onboard the uss ramage (ddg-61) cmav serm 036-26 located at mayport naval station. iaw all invoked navsea standard items fy-26 and sermc local standard items apply. please see the attached quote: march 10, 2026 rev 1 for reference and exceptions. pop: 05/11/2026 - 06/03/2026. ecr poc: greg english 757-409-7769 or greg.english@ecrfab.com. cmsi is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $44,258 |
UEI DDNELLWJ1DB1 Accomplish the requirements of work item: 523-11-002; 531-11-001; 532-11-001; 998-41-001; and 541-12-001 onboard the uss ramage (ddg-61) cmav serm 036-26 located at mayport naval station. iaw all invoked navsea standard items fy-26 and sermc local standard items apply. please see the attached quote dated march 26, 2026 for reference and exceptions. pop: 05/11/2026 - 06/02/2026. ecr poc: greg english 757-409-7769 or greg.english@ecrfab.com. amc is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $82,860 |