FedOps logoFedOps

WAVEFORCE ELECTRICAL, LLC

UEI: WA3QAGQERSN5
Browse awards
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo

Subcontracts received

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

$3.2M
Received · FY2025–FY2027
$3.2M
Received · all years
25
Subawards
3
Primes

Top primes

Prime contractorTotal
EAST COAST REPAIR & FABRICATION, LLC$2.6M
METRO MACHINE CORP.$404K
MARINE HYDRAULICS INTERNATIONAL, LLC$148K

Most recent

  • 07/31/2026 METRO MACHINE CORP · N5005426FC020 · Department of Defense (DOD)
    FFP 2 OR MORE NON-COMMERCIAL
    $404K
  • 07/31/2026 MARINE HYDRAULICS INTERNATIONAL, LLC · N0002424C4406 · Department of Defense (DOD)
    REPAIR AVA5-50FX COAXIAL CABLE
    $5K
  • 07/22/2026 EAST COAST REPAIR & FABRICATION, LLC · N5005425D0008 · Department of Defense (DOD)
    ACCOMPLISH REQUIREMENTS ON THE USS HERSHEL WOODY WILLIAMS CMAV (3654-007) FOR WORK ITEM 167-10-001 PARA 3.1 - 3.3.1, 3.5 - 3.9; 321-11-001 PARA 3.1 - 3.2.2.1, 3.4 - 3.5; 441-11-001 PARA 3.1 - 3.10; 631-13-001 PARA 3.1 - 3.3.4, 3.5, 3.6; 631-21-002 PARA 3.1, 3.3 - 3.3.1, 3.6 - 3.7.3.1, 3.16 - 3.17, 3.20; AND 651-11-001 PARA 3.1 - 3.3 PER THE ATTACHED QUOTE. FFP: $3,791.61. POP: 07/20/2026 - 09/29/2026. ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC: JESSE BRICKHOUSE 904-508-8215 OR JBRICKHOUSE@ECRFAB.COM. ** PLEASE NOTE THE FOLLOWING: ECR RECEIVED AN UNDEFINITIZED CONTRACT ACTION (UCA) REGARDING THE USS WOODY WILLIAMS CMAV PACKAGE, STARTING ON 07/22/2026. ECR IS ISSUING THIS PO PER YOUR COMPANY'S PROPOSED PRICING, HOWEVER, MARMC WILL BE REQUESTING TO SCOPE THE PACKAGE AFTER EXECUTION HAS STARTED PER THE T&CS OF A UCA.
    $104K
  • 07/17/2026 EAST COAST REPAIR & FABRICATION, L.L.C. · N5005426FC012 · Department of Defense (DOD)
    ACCOMPLISH REQUIREMENTS ON THE USS BAINBRIDGE (DDG-96) SRA (3616-047) FOR WORK ITEM: 262-80-001 PARA 3.1 3.1 (REF 2.2, 8-10), 3.3-3.6, 3.9; 264-31-002 PARA 3.1-3.1.2; 324-11-001 PARA 3.1-3.4.1.1; 431-23-001 PARA 3.1-3.2; 441-11-001 PARA 3.1, 3.1.1, 3.3.2; 441-71-001 PARA 3.1-3.3.1.1, 3.8-3,11; 441-71-002 PARA 3.1, 3.4; 593-25-001 PARA 3.4, 3.4.1, 3.17; 897-11-001 PARA 3.1-3.1.9.2, 3.3-3.6; 992-11-001 PARA 3.1-3.3.1; AND 157-11-001 PARA 3.1-3.2.1, 3.3, 3.7, 3.8-3.9.1 PER THE ATTACHED QUOTE: 6006 REV H DATED AUGUST 06, 2025. POP: 08/17/2026 - 04/15/2027. ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC: JAMES MILLER 757-355-0974 OR JMILLER@ECRFAB.COM.
    $331K
  • 06/30/2026 MARINE HYDRAULICS INTERNATIONAL, LLC · N0002424C4406 · Department of Defense (DOD)
    REPLACED DAMAGED CONNECTOR VERIFY INSTALL OF NEW CONNECTOR PARA 3.14, 3.15 & 3.15.1
    $5K
  • 06/04/2026 EAST COAST REPAIR & FABRICATION, LLC · N3220525C5002 · Department of Defense (DOD)
    INCREASE PO DM26E0038 BY $80,548.04 TO ACCOMPLISH THE REQUIREMENTS OF WI 0460 OF THE IA3 PERIOD PER CCO 075 FOR THE USS HERSHEL WOODY WILLIAMS IAW THE ATTACHED QUOTE DATED 05/28/2026.
    $81K
  • 05/31/2026 MARINE HYDRAULICS INTERNATIONAL, LLC · N0002424C4406 · Department of Defense (DOD)
    ACCOMPLISH THE PARA 3.1.8, 3.1.9 & 3.1.10 (SEE QUOTE DATED 5/12/26 FOR EXCEPTIONS)
    $39K
  • 05/18/2026 EAST COAST REPAIR & FABRICATION, L.L.C. · N5005425FC049 · Department of Defense (DOD)
    ACCOMPLISH REQUIREMENTS ON THE USS GRAVELY (3576-263) ITEM 897-11-002 (RCC 94G) PER ATTACHED QUOTE, FFP: $43,261.36 POP 1/12/26 - 10/9/26 ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC JAMES MILLER @ 757-355-0974 JMILLER@ECRFAB.COM
    $43K
  • 04/24/2026 EAST COAST REPAIR & FABRICATION, LLC · N4002726F0215 · Department of Defense (DOD)
    ACCOMPLISH ELECTRICAL REQUIREMENTS FOR WORK ITEM: 593-90-001; 593-80-002; 252-90-001; 561-11-001; 644-80-001; 897-11-001; 593-90-002; AND 643-80-001 ONBOARD THE USS WINSTON CHURCHILL (DDG-81) ISRA SERM-502-26 LOCATED AT MAYPORT NAVAL STATION. POP: 07/06/2026 - 10/09/2026. PLEASE SEE THE ATTACHED QUOTE DATED MARCH 23, 2026 FOR REFERENCE AND EXCEPTIONS. ALL FY-26 NAVSEA STANDARD ITEMS APPLY INCLUDING LOCAL STANDARD ITEMS ARE INVOKED. DAILY UPDATES AND REPORTS ARE REQUIRED TO BE PROVIDED TO THE ECR POC: JOSH DEWITT 757-284-7965 OR JDEWITT@ECRFAB.COM. WAVEFORCE IS REQUIRED TO HAVE A REPRESENTATIVE AT ALL ECR DAILY PRODUCTION MEETINGS OR AT A MINIMUM A DAILY UPDATE SENT VIA EMAIL TO THE ECR PM WHILE THE SUBCONTRACTORS WORK IS ON-GOING PRIOR TO 0730 MON-FRI. ALL SUBCONTRACTORS ARE TO CHECK IN WITH ECR SAFETY MANAGER: RICHARD MURRAY 904-229-9833 OR RMURRAY@ECRFAB.COM PRIOR TO THE COMMENCEMENT OF ANY SHIPBOARD WORK.
    $165K
  • 04/24/2026 EAST COAST REPAIR & FABRICATION, LLC · N5005425F5324 · Department of Defense (DOD)
    ACCOMPLISH REQUIREMENTS ON THE APL-71 (3573-003) ITEM 320-00-001 PER ATTACHED QUOTE, FFP: $89,339.36. POP 2/6/26 - 6/15/26 ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC: KELLI ROYALS 757-861-3326 OR KROYALS@ECRFAB.COM
    $89K