Back to contract actions
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
July 6, 2026
End Date
October 30, 2026
NAICS
PSC
J998
Transactions (2)
| Date | Mod # | Obligation |
|---|---|---|
| Jan 7, 2026 | 0 | +$6,391,784 |
| Jun 30, 2026 | P00001 | +$0 |
Subcontractors 11$1,608,009 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI XJAHB2WU39Q1 Accomplish the requirements for work item: 150-11-001 (3612-006) 03 level deck plating; repair. axs to provide, erect, and remove nte (qty 1) 5 x 5 x 8 scaffold tower as designated by prime; 150-11-002 (3612-007) provide, erect, and remove nte (qty 2) 5 x 5 x 8 scaffold towers as designated by prime; 241-80-001 (3612-008) provide, erect, and remove nte (qty 2) 10 x 10 x 10 containment structures; 251-30-001 (3612-009) provide, erect, and remove nte (qty 2) 16 x 5 hanging scaffolds going down 16' to access 02 over the side louvers. (qty 2) 16 x 5 x 12 scaffold towers for the fwd stack 03 louvers. (qty 2) 35 x 5 x 12 scaffold towers for the aft 03 louvers. (qty 4) minor modifications will be included total; 251-30-002 (3612-010) provide, erect, and remove nte (qty 8) 5 x 5 x 8 scaffold towers as designated by prime onboard; 251-32-001 (3612-011) provide, erect, and remove nte (qty 8) 5 x 5 x 8 scaffold towers as designated by prime onboard; 259-10-001 (3612-013) provide, erect, and remove nte (qty 14) 7 x 7 scaffold towers as designated by prime; 259-10-002 (3612-014) provide, erect, and remove nte (qty 14) 7 x 7 scaffold towers as designated by prime; 259-11-001 (3612-015) provide, erect, and remove nte (qty 4) 5 x 4 tube and clamp hanging scaffolds; 262-11-002 (3612-017) provide, erect, and remove nte (qty 1) 25 x 25 containment, covering deck levels 5 and 4 for mer 1, and (qty 1) 25 x 25 containment, covering deck levels 5 and 4 for mer 2. containments will have (qty 4) zipper doors each for controlled entry; 583-11-001 (3612-024) provide, erect, and remove nte (qty 1) 10 x 10 x 10 scaffold tower and (qty 1) 5 x 5 x 16 scaffold tower; 588-20-001 (3612-025) provide, erect, and remove nte (qty 1) 7 x 5 cantilevered hanging scaffold going down 8' to access outboard windows; 588-20-002 (3612-026) provide, erect, and remove nte (qty 2) 7 x 7 x 16 rolling towers with (qty 2) deck levels to access full door seal and operational components; 980-11-001 (3612-045) provide, erect and remove nte (qty 1) 16 x 14 x 10 scaffold tower and (qty 1) "u" shaped 10 x 5 x 8 scaffold tower per 3.1.14; 980-90-010 (3612-054) provide, erect, and remove nte (qty 12) 6 x 3 x 6 scaffold towers per 3.1.10.1; and 980-90-012 (3612-057) provide, erect, and remove nte (qty 1) 12 x 12 x 26 cantilevered scaffold tower with multiple deck levels to access stub mast onboard the uss winston churchill (ddg-81) isra located at mayport naval station. all invoked navsea standard items fy-26 and sermc local standard items apply. please see the attached quote: 1977 for reference and exceptions. pop: 07/27/2026 - 10/23/2026. ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. 2nd poc: ron thomas 904-574-3761 or rthomasjr@ecrfab.com. axs is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $145,530 |
UEI FDDEB3EW3JA4 Accomplish the requirements for work item: 251-30-002 (3612-010) engine room no.2 gas turbine dirty/clean side intake repair. jcw to accomplish paragraphs 3.2,3.5,3.6.1, 3.7-3.9,3.11; 259-10-002 (3612-014) engine room no.2 gas turbine uptake repair. jcw to accomplish paragraphs 3.4,3.5.1,3.6-3.8; 640-80-001 (3612-039) ship at partition privacy door removal. jcw to accomplish paragraphs 3.2-3.2; 643-80-001 (3612-040) hab mrpr-r2499 install. jcw to accomplish paragraphs 3.1-3.2.3,3.3-3.5.4,3.6,3.6.1; and and 644-80-001 (3612-041) hab mrpr-r2500 install. jcw to accomplish paragraphs 3.1-3.1.1.1,3.7-3.7.2.1,3.8-3.8.2 onboard the uss winston churchill (ddg-81) isra located at mayport naval station. all invoked navsea standard items fy-26 and sermc local standard items apply. please see the attached quote: jcw000wc1 for reference and exceptions. pop: 07/27/2026 - 09/11/2026. ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. 2nd poc: ron thomas 904-574-3761 or rthomasjr@ecrfab.com. jcw is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $193,105 |
UEI CPWUSW4XYAM5 Provide rental of 900 cfm air compressor set up; enviroair 8000 exhaust fan; (qty 27) 4/0 x 50' cam lock cables (set of 4); and delivery and pick up | $109,782 |
UEI LR14GGZ9KUT7 Provide rental of (qty 19) storage connex 8 x 20 x 8'6", delivery and pick up | $43,833 |
UEI LR14GGZ9KUT7 Provide rental of 2000-2199 kva generator and delivery and pick up | $92,973 |
UEI DDNELLWJ1DB1 Accomplish electrical requirements for work item: 123-00-001 paragraphs 3.1, 3.1.2, 3.1.4 - 3.2.4; 262-11-001 (e1) paragraph 3.1-3.1.7; 262-11-002 paragraph 3.4; 521-11-001 (e2) drain and dispose in support of cofferdam installation; 528-11-001 paragraph 3.1; 583-11-001 paragraph 3.3.1; 593-11-001 accomplish 009- 88/009-009 for gas free of vcht ejector pump and motor assemblies; 992-31-001 paragraphs 3.1 - 3.2.5; and 998-41-001 paragraphs 3.1 - 3.7.2. onboard the uss winston churchill (ddg-81) isra serm-502-26 located at mayport naval station. pop: 07/27/2026 - 10/30/2026. please see the attached quote dated 09/29/2025 for reference and exceptions. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. amc is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $155,068 |
UEI WA3QAGQERSN5 Accomplish electrical requirements for work item: 593-90-001; 593-80-002; 252-90-001; 561-11-001; 644-80-001; 897-11-001; 593-90-002; and 643-80-001 onboard the uss winston churchill (ddg-81) isra serm-502-26 located at mayport naval station. pop: 07/06/2026 - 10/09/2026. please see the attached quote dated march 23, 2026 for reference and exceptions. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. waveforce is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $165,322 |
UEI F1ZLR8RBKLJ3 Accomplish work onboard the uss winston churchill (ddg-81) isra located at mayport naval station for work item: 123-00-001; 123-19-001 para: 3.2, 3.7, 3.9; 150-11-001 para: 3.1, 3.6 - 3.7; 150-11-002 para: 3.3 - 3.5; 150-11-002 para: 3.3; 251-30-001 para: 3.3 & 3.6; 251-30-002 para: 3.4, 3.10, 3.12.2, 3.12.3, 3.14; 251-32-001para: 3.4, 3.10, 3.12.2, 3.12.3, 3.14; 259-10-001 para: 3.2, 3.7, 3.7.1, 3.8.2, 3.8.3, 3.10; 259-10-002 para: 3.2, 3.3, 3.9, 3.10, 3.11.2, 3.11.3, 3.13; 583-11-001 para: 3.5, 3.6.1, 3.6.2, 3.7.2, 3.9-3.9.2, 3.11; 583-11-001 para: 3.9; 588-20-001 e2 para: 3.5, 3.5.1, 3.12-3.12.2, 3.14-3.14.2, 3.16.2, 3.16.3, 3.20; 588-20-001 e2 para: 3.14; 593-11-001 para: 3.1.2, 3.4; 593-80-001 para: 3.3-3.4, 3.6; 631-10-001 para: 3.1, 3.4-3.7; 631-10-001 para: 3.4; 631-11-001 para: 3.1, 3.2; 631-21-001 para: 3.1, 3.2; 643-80-001 para: 3.6.2.2, 3.6.2.3, 3.7.3-3.8, 644-80-001 para: 3.1.2, 3.1.3, 3.2 - 3.2.2, 3.3.1.2-3.3.2, 3.4.4, 3.5.2, 3.5.3, 3.6.1, 3.6.2, 3.7.3, 3.8.3, 3.9.1, 3.10.1, 3.16; and 640-80-00 para: 3.5.2, 3.5.3, 3.6. pop: 07/06/2026 - 10/09/2026. axs-p must provide daily updates and reports to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. axs-p is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $165,322 |
UEI YELYMYLF82L9 Accomplish work onboard the uss winston churchill (ddg-81) isra located at mayport naval station for work item 583-11-001. iaw all invoked navsea standard items fy26 and all local sermc standard items and iaw the attached quote: fsq180091 dated september 30, 2025 to provide 3 trips to accomplish the following: "slewing arm davit (slad) overhaul accomplish". pop: 07/06/2026 - 10/09/2026. trident must provide daily updates and reports to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. trident is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $193,870 |
UEI ZA1KMNAJMVT3 Accomplish work onboard the uss winston churchill (ddg-81) isra located at mayport naval station for work item: 588-21-001. para: 3.7-3.7.1, "flight deck and recovery assist, securing and traversing (rast) system track and plate clean and preserve" and 634-21-001 3.1, 3.3, 3.3.1, 3.6-3.8.1, 3.10, "flight iia ddg flight deck nonskid replacement accomplish" iaw all invoked navsea standard items fy26 and all local sermc standard items and iaw the attached estimate: 5631 dated october 06, 2025 to accomplish the following . pop: 07/06/2026 - 10/09/2026. stc must provide daily updates and reports to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. stc is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $201,924 |
UEI KRK2MLBEL7J7 Accomplish the requirements of 009-011 for work item: 150-11-002; 241-80-001; 150-11-001; 251-30-002; 251-32-001; 259-10-001; 259-10-002; 259-11-001; 262-11-001; 262-11-002; 262-80-001; 264-30-001; 521-11-001; 588-20-001; 593-80-001; 593-80-002;593-90-001; 640-80-001; 643-80-001; 644-80-001; and 993-31-001 onboard the uss winston churchill (ddg-81) isra serm-502-26 (3612-064) located at mayport naval station. pop: 07/06/2026 - 10/09/2026. please see the attached quote: 1052 dated march 30, 2026 for reference and exceptions. all fy-26 navsea standard items apply including local standard items are invoked. daily updates and reports are required to be provided to the ecr poc: josh dewitt 757-284-7965 or jdewitt@ecrfab.com. wde is required to have a representative at all ecr daily production meetings or at a minimum a daily update sent via email to the ecr pm while the subcontractors work is on-going prior to 0730 mon-fri. all subcontractors are to check in with ecr safety manager: richard murray 904-229-9833 or rmurray@ecrfab.com prior to the commencement of any shipboard work. | $141,279 |