JC WELLS, LLC
UEI: FDDEB3EW3JA4
—
Obligations · USAspending
—
Contract awards · USAspending
—
SAM.gov award notices · 12 mo
Subcontracts received
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
$3.9M
Received · FY2025–FY2027
$3.9M
Received · all years
14
Subawards
1
Prime
Top primes
| Prime contractor | Total |
|---|---|
| EAST COAST REPAIR & FABRICATION, LLC | $3.9M |
Most recent
- $50KPROVIDE PROJECT MANAGER SUPPORT ON THE USS HERSHEL WOODY WILLIAMS CMAV (3654) FROM 7/20/26 - 9/29/26 AT A DAILY RATE OF $700 PER DAY PLUS ALL EXPENSES X 10% FOR JESSE BRICKHOUSE. NTE: $50,000 ALL EXPENSES SHOULD BE SUBMITTED
- $193KACCOMPLISH THE REQUIREMENTS FOR WORK ITEM: 251-30-002 (3612-010) ENGINE ROOM NO.2 GAS TURBINE DIRTY/CLEAN SIDE INTAKE REPAIR. JCW TO ACCOMPLISH PARAGRAPHS 3.2,3.5,3.6.1, 3.7-3.9,3.11; 259-10-002 (3612-014) ENGINE ROOM NO.2 GAS TURBINE UPTAKE REPAIR. JCW TO ACCOMPLISH PARAGRAPHS 3.4,3.5.1,3.6-3.8; 640-80-001 (3612-039) SHIP AT PARTITION PRIVACY DOOR REMOVAL. JCW TO ACCOMPLISH PARAGRAPHS 3.2-3.2; 643-80-001 (3612-040) HAB MRPR-R2499 INSTALL. JCW TO ACCOMPLISH PARAGRAPHS 3.1-3.2.3,3.3-3.5.4,3.6,3.6.1; AND AND 644-80-001 (3612-041) HAB MRPR-R2500 INSTALL. JCW TO ACCOMPLISH PARAGRAPHS 3.1-3.1.1.1,3.7-3.7.2.1,3.8-3.8.2 ONBOARD THE USS WINSTON CHURCHILL (DDG-81) ISRA LOCATED AT MAYPORT NAVAL STATION. ALL INVOKED NAVSEA STANDARD ITEMS FY-26 AND SERMC LOCAL STANDARD ITEMS APPLY. PLEASE SEE THE ATTACHED QUOTE: JCW000WC1 FOR REFERENCE AND EXCEPTIONS. POP: 07/27/2026 - 09/11/2026. ECR POC: JOSH DEWITT 757-284-7965 OR JDEWITT@ECRFAB.COM. 2ND POC: RON THOMAS 904-574-3761 OR RTHOMASJR@ECRFAB.COM. JCW IS REQUIRED TO HAVE A REPRESENTATIVE AT ALL ECR DAILY PRODUCTION MEETINGS OR AT A MINIMUM A DAILY UPDATE SENT VIA EMAIL TO THE ECR PM WHILE THE SUBCONTRACTORS WORK IS ON-GOING PRIOR TO 0730 MON-FRI. ALL SUBCONTRACTORS ARE TO CHECK IN WITH ECR SAFETY MANAGER: RICHARD MURRAY 904-229-9833 OR RMURRAY@ECRFAB.COM PRIOR TO THE COMMENCEMENT OF ANY SHIPBOARD WORK.
- $1.7MACCOMPLISH REQUIREMENTS ON THE USS BAINBRIDGE (DDG-96) SRA (3616-150) FOR WORK ITEM: 641-11-001 PARA 3.4-3.4.7; 641-11-004 PARA 3.1-3.3; 661-11-001 PARA 3.1,3.1.1,3.3,3.6; 651-11-004 PARA 3.3,3.4,3.6,3.8,3.9; 150-11-009 PARA 3.1-3.4; 150-80-003 PARA 3.3.1-3.3.2 FOR 1.2.3; 512-11-002 PARA 3.1-3.4; 512-11-003 PARA 3.1-3.4; 513-10-001 PARA 3.1-3.4; 641-11-002 PARA 3.4-3.4.7; 641-11-003 PARA 3.1-3.2,3.4-3.5; 644-11-002 PARA 3.1; 641-21-001 PARA 3.1-3.2; 643-11-001 FOR ALL SHEET METAL AND STRUCTURAL; 643-11-002 FOR ALL SHEET METAL AND STRUCTURAL; 643-11-003 FOR ALL SHEET METAL AND STRUCTURAL; 644-11-001 FOR ALL SHEET METAL AND STRUCTURAL; 643-11-004 PARA 3.1-3.2; 642-80-001 PARA 3.1-3.2; 644-11-003 PARA 3.1-3.2; 652-11-001 PARA 3.1 - 3.1.3.1 & 3.2; 655-11-001 PARA 3.1,3.1.3-3.1.6,3.2,3.3; 665-30-001 PARA 3.1; 512-11-012 PARA 3.1 - 3.3; 621-11-001 PARA 3.1, 3.2, 3.3; AND 625-80-001 PARA 3.1-3.1.5,3.2,3.3,3.6 PER THE ATTACHED QUOTE DATED JUNE 16, 2026. POP: 08/17/2026 - 04/15/2027. ALL REQUIRED REFERENCES ARE LISTED IN PARAGRAPH 2 OF THE SPEC ITEM. ALL WORK TO BE ACCOMPLISHED IAW FY26. ECR POC: JAMES MILLER 757-355-0974 OR JMILLER@ECRFAB.COM.
- $87K**CO5** INCREASE PO ML25E0390 BY $87,000.00 FOR RE-WORK AND WELD SUPPORT ON THE USS GRAVELY SRA (DDG-107) FOR WORK ITEM 150-80-001. POP: 01/12/2026-09/30/2026 POC: STEVEN MARGITICH / SMARGITICH@ECRFAB.COM / 757-378-8084
- $50K*CO2* INCREASE PO $50,000 NTE TO ACCOMPLISH ADDITIONAL HOTWORK INCLUDING: WELDING, GRINDING, CUTTING AND OTHER MISC WORK REQUIRED TO SUPPORT THE INSTALL
- $46K*CO1* ACCOMPLISH HAB WORK REQUIRED IAW WORK ITEM: 644-11-001 AS DIRECTED BY ECR'S ONSITE PM: RON THOMAS JR. 904-574-3761 OR RTHOMASJR@ECRFAB.COM. POP: 05/06/2026 - 07/28/2026. ECR TO SUPPLY ALL MATERIALS.
- $647K*CO4* INCREASE PO BY $158,600.00 TO REMOVE, RE-FIT, AND REWELD PORT 02 LVL DECK PLATE AND BHD FOR WORK ITEM: 150-80-001 AND INCREASE PO BY $488,800.00 TO REMOVE AND REPLACE 470 SQ FT OF DECK AND BHD PLATE FOR WORK ITEM: 150-80-001 FOR THE USS GRAVELY (DDG-107) SRA IAW THE ATTACHED QUOTE: JCW-101 DATED MAY 12, 2026. ALL ORIGINAL TERMS AND CONDITIONS APPLY. POP: 01/12/2026 - 10/19/2026. ECR POC: STEVEN MARGITICH 757-378-8084 OR SMARGITICH@ECRFAB.COM.
- $148KACCOMPLISH REQUIREMENTS ON THE USS HERSHEL WOODY WILLIAMS (3526-171) FOR WORK ITEM: (ROH) 0107, 0108, 0304, 0605, 0103, 0105 AND 0106 PER THE ATTACHED QUOTE: JCW-68 DATED MAY 05, 2026. POP: 05/21/2026 - 09/30/2026. ALL REFERENCES ARE LOCATED IN PARAGRAPH 2 OF THE WORK ITEM. ECR POC: JODY ELLISON AT 757-954-2689 OR JELLISON@ECRFAB.COM.
- $49K*CO1* ACCOMPLISH HOTWORK INCLUDING: WELDING, GRINDING, AND CUTTING ON T-BEAMS, HANDRAILS, AND LOCKING CLIPS FOR HOLDING DOWN EQUIPMENT, WALKWAY BEAMS, AND CHT FOUNDATIONS FOR WORK ON THE RENTAL BARGE (3628-005) FOR WORK ITEM: 992-11-002 IAW THE ATTACHED QUOTE: JCW-66 DATED MAY 05, 2026. ECR'S ONSITE PM: RON THOMAS JR. 904-574-3761 OR RTHOMASJR@ECRFAB.COM. POP: 05/06/2026 - 06/28/2026. ECR TO SUPPLY ALL MATERIALS.
- $50KASSIST IN ACCOMPLISHING WORK ITEM: 624-10-001 AND THE REMOVAL AND REPLACEMENT OF (QTY 2) HATCHES FOR WORK ITEM: 167-11-001ONBOARD YRBM(L)-43 (3595-019) LOCATED AT RIVERPORT IAW THE ATTACHED QUOTE: JCW-73 DATED APRIL 20, 2026. POP: NOW THROUGH 05/30/2026. ECR POC: KELLI ROYALS 757-861-3326 OR KROYALS@ECRFAB.COM.