PIIDN5005425FC049DELIVERY ORDER
$39,984,647.58
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
January 12, 2026
End Date
November 27, 2026
NAICS
PSC
J998
Transactions (9)
DateMod #Obligation
Sep 18, 20250+$38,725,569
Sep 23, 2025P00001+$13,972
Dec 11, 2025P00002+$470,188
Dec 18, 2025P00003+$1,518,743
Jan 5, 2026P00004+$0
Jan 26, 2026P00005-$61,345
Feb 13, 2026P00006+$0
Jun 2, 2026P00007-$682,480
Jun 4, 2026P00008+$0
Subcontractors 59$16,360,713 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI CEHURV7H94L8
*co9* accomplish requirements on the uss gravely (3576-019) item 150-80-001; nulka launcher fdn install and mk 38 fdn install per attached quote, ffp: $48,150.00 pop 7/17/26 - 8/31/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc tyler russo @ 757 944-2189 or trusso@ecrfab.com.
$48,150
UEI FDDEB3EW3JA4
**co5** increase po ml25e0390 by $87,000.00 for re-work and weld support on the uss gravely sra (ddg-107) for work item 150-80-001. pop: 01/12/2026-09/30/2026 poc: steven margitich / smargitich@ecrfab.com / 757-378-8084
$87,000
UEI ZA1KMNAJMVT3
*co5* accomplish requirements on the uss gravely (ddg-107) sra (3576-091) for work item: 634-21-001 para 3.3-3.4, 3.11.2.1, 3.14; 644-11-002 (a1) and 522-90-001 rcc 149g para's 3.19.2 - 3.19.3, 3.22 per the attached quote. pop: 01/12/2026 - 08/03/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: steven margitich 757-559-8484 or smargitich@ecrfab.com.
$155,259
UEI L2W7SGMLGGH6
Accomplish requirements on the uss gravely (3576 - 251) item 123-10-001 rcc 90g(a) para's 3.3.5 - 3.3.5.1, per attached quote, ffp: $159,463.60 pop 1/12/26 - 10/12/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc steven margitich @ 7575598484 or smargitich@ecrfab.com ***oil ordered from warfighter oil per jdinmore, 009-63 to be performed by third party at the direction of smargitich***
$136,500
UEI ZA1KMNAJMVT3
*co3* accomplish requirements on the uss gravely (ddg-107) sra (3576-084) for work item: 634-11-002 e2 para 3.2; 634-11-006 e2 para 3.1-3.2.2; 634-11-007 para 3.2-3.2.1 and 634-11-008 para 3.3 per the attached quote. pop: 01/12/2026 -08/01/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: steven margitich 757-559-8484 or smargitich@ecrfab.com.
$47,600
UEI YQ9EQZJ8PKM6
*co7* accomplish requirements on the uss gravely (ddg-107) sra (3576-306) for work item: 982-31-002 rcc 106g per the attached quote. ffp: $52,080.00. pop: 01/12/2026 - 10/12/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: steven margitich 757-559-8484 or smargitich@ecrfab.com.
$52,080
UEI XJAHB2WU39Q1
*co10* accomplish requirements on the uss gravely (3576 - 019) item 150-80-001 and item 993-21-001, per attached quote. pop 1/12/26 to 10/12/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc steven margitich @ 7575598484 or smargitich@ecrfab.com
$46,600
UEI RXNUR4G46NG3
*co6* provide labor, supervision, materials and safety to accomplish requirements on the uss gravely (3576 - 287) item 514-20-002 rcc 132g, per attached quote, ffp: $74,095.00 pop 1/12/26 – 10/12/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc steven margitich @ 7575598484 or smargitich@ecrfab.com
$74,095
UEI FDDEB3EW3JA4
*co4* increase po by $158,600.00 to remove, re-fit, and reweld port 02 lvl deck plate and bhd for work item: 150-80-001 and increase po by $488,800.00 to remove and replace 470 sq ft of deck and bhd plate for work item: 150-80-001 for the uss gravely (ddg-107) sra iaw the attached quote: jcw-101 dated may 12, 2026. all original terms and conditions apply. pop: 01/12/2026 - 10/19/2026. ecr poc: steven margitich 757-378-8084 or smargitich@ecrfab.com.
$647,400
UEI CEHURV7H94L8
*co5* accomplish requirements onboard the uss gravely (ddg-107) sra (3576-019) for work item: 150-80-001 per the attached quote $105,840.00. pop: 01/12/2026 to 06/19/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished within fy26. ecr poc: james miller 757-355-0974 or jmiller@ecrfab.com
$105,840
UEI LBSGLZXMV554
*co4* accomplish requirements onboard the uss gravely (ddg-107) sra (3576-261) for work item: 150-80-001 (rcc 73g) per the attached quote $51,000.00. pop: 01/12/2026 to 05/29/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished within fy26. ecr poc: james miller 757-355-0974 or jmiller@ecrfab.com.
$51,000
UEI JZSHR7DX1MQ9
Provide rental of (20ea) duct insulated ac - 20" x 25'; (28ea) 375 amp 4/0 cable; (2ea) dx30 ton air conditioner units: and (8ea) cable tail 4/0 - bare end+female camlock, plis freight
$51,980
UEI WA3QAGQERSN5
Accomplish requirements on the uss gravely (3576-263) item 897-11-002 (rcc 94g) per attached quote, ffp: $43,261.36 pop 1/12/26 - 10/9/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc james miller @ 757-355-0974 jmiller@ecrfab.com
$43,261
UEI CEHURV7H94L8
*co4* accomplish requirements onboard the uss gravely (ddg-107) sra (103576-019) for work item: 150-80-001 to remove and replace 416sq ft of deck plate, 02 level deck. pop: 5/05/2026 to 05/29/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote for a total of $263,002.50. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com.
$263,003
UEI ZA1KMNAJMVT3
Accomplish requirements onboard the uss gravely (ddg-107) sra (3576-019) for work item: 150-80-001 para 3.10 - 3.11, 3.12; 634-11-003 para 3.2 - 3.2.1, 3.4; 634-11-004 para 3.2 - 3.2.1, 3.4; 634-11-005 para 3.2 - 3.2.1, 3.4; 634-21-002 para 3.4, 3.4.1, 3.6, 3.8, 3.11 - 3.12.2, 3.18; 643-11-001 para 3.6 - 3.7.2.1, 3.8.2 - 3.8.3, 3.10; and 644-11-001 para 3.12 - 3.13.1.1, 3.14.2 - 3.14.3, 3.16 per the attached quote. pop: 01/12/2026 – 10/12/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$441,994
UEI LBSGLZXMV554
*co3* accomplish requirements onboard the uss gravely (ddg-107) sra (3576-019) for work item: 150-80-001 for acceleration of subject item to achieve revised completion date of may 29, 2026. pop: 01/12/2026 to 08/10/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote for a total of $62,700.00. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com.
$62,700
UEI V1MQFNQB56Z5
*co2* provide labor, supervision, materials and safety to accomplish requirements on the uss gravely (3576 - 253) item 551-53-001 rcc 97g(a) para 1.4 - 1.4.3, 3.15 - 3.16, , per attached quote, ffp: $825,229.17 pop 1/12/26 – 10/12/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com
$825,229
UEI FZPYZ11SFNA6
Accomplish requirements on the uss gravely (ddg-107) sra (3576-234) for work item: 993-31-002 rcc 36g per the attached quote. ffp: $42,791.00. pop: 01/14/2026 - 10/19/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: natasha toms 757-951-6545 or ntoms@ecrfab.com.
$42,791
UEI RXNUR4G46NG3
*co4* accomplish requirements on the uss gravely (3576 - 240) item 982-32-001 , per attached quote, ffp: $65,238 pop 1/12/26 - 10/12/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com
$65,238
UEI LBSGLZXMV554
*co2* accomplish requirements onboard the uss gravely work item: 150-80-001, para 3.18-3.19. period of performance is 1/12/2026 to 08/10/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote , for a total of $69,992.00. all work to be accomplished within fy26. ecr poc: dion wigfall 757- 813-0723 or dwigfall@ecrfab.com.
$69,992
UEI EP2TN3E6Z624
*co6* accomplish requirements onboard the uss gravely (ddg-107) sra (3576-243) for work item: 588-21-001 rcc 71g per the attached quote. ffp: $159,260.03. pop: 04/22/2026 - 06/17/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$159,260
UEI FDDEB3EW3JA4
*co1* and *co2* accomplish requirements on the uss gravely (ddg-107) sra (3576 -009) for work item: 123-11-003 para's 3.2 - 3.3, 3.5 - 3.5.2 and 150-80-001 to remove, store, and reinstall ventilation and cut hangers for cable interference per the attached quote. pop: 01/12/2026 -“ 10/12/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$104,930
UEI QLR1UQAG8L85
Flexible hose assembly, size -48, cwx/ha047; cwx/ha048; cwz/ha049; and cwz/ha050. flex hose lengths are 72" l. reuse each flexible hose assembly insert and flange. *****note, this has a 350 day lead time.*****
$61,077
UEI UZGNVGQVER16
*co3* accomplish requirements on the uss gravely (ddg-107) sra (3576-094) for work item: 643-11-001 para 3.6 - 3.7.1; and 644-11-001 para 3.12 - 3.13 iaw the attached quote. pop: 01/12/2026 – 10/12/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$50,050
UEI QLR1UQAG8L85
Flexible hose assembly, 4" ips, cres, fwe/ha172. flex hose lengths are 64" l; flexible hose assembly, 3" ips, cres, fwe/ha173. flex hose lengths are 80" l; flexible hose assembly, 4" ips, cres, ha/089. flex hose lengths are 72" l; flexible hose assembly, 4" ips, cres, ha/090. flex hose lengths are 52" l; flexible hose assembly, size -6, cal/ha309. flex hose lengths are 48" l; flexible hose assembly, size -6, cal/ha307. flex hose lengths are 48" l; flexible hose assembly, size -80, swc/ha007. flex hose lengths are 60" l; and flexible hose assembly, size -80, swc/ha008. flex hose lengths are 52" l. reuse each flexible hose assembly insert and flange. hampton rubber quote #10012399
$74,558
UEI KNEFNMWXBK39
Dt365urk non-fusible, three pole, three wire, 600vac, 250vdc triple pole double throw safety switch; de1022106fa - black male camlok; de1022111fa - white male camlok; and de1022108fa - red male camlok
$62,306
UEI KNEFNMWXBK39
Nus-2 cable entry seal; male dsc 100a meltric plug 3p + g p/n 33-68243-c-k04; ds60 poly handle p/n 514p0d35; ds30 poly handle p/n 513p0d30; male 50 amp plug 125-250 v marino 12-00243m; female 50 amp plug 125-250 v marino 2-00242m; male ds60 meltric plug 3p + g p/n 33-68043; and eaton series c electronic molded case circuit breaker, l-frame, ldc, complete breaker, optim 550, electronic lsi trip type, three-pole, 600a, 600 vac, item 6636c33g12
$53,754
UEI UZGNVGQVER16
*co1* provide labor, supervision, materials and safety to accomplish requirements on the uss gravely (ddg-107) sra for work item: 634-11-009 (a1) para 3.1 - 3.2; 634-11-010 (a1) para 3.1 - 3.2; 634-11-011 (a1) para 3.1 - 3.2; 634-11-012 (a1) para 3.1 - 3.2; 634-11-013 (a1) para 3.1 - 3.2; 634-11-014 (a1) para 3.1 - 3.2; 634-11-015 (a1) para 3.1 - 3.2 and 634-11-016 (a1) para 3.1 - 3.2. pop: 01/12/2026 – 10/12/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$113,040
UEI JZSHR7DX1MQ9
Rental extension request. original requisition (186933) original po number (sc25e0410) 375kw generator in support of yrbm 60 from carter per attached quote (rental details - rent start: 02/07/2026. rent end: 10/19/2026. rent location: riverport. location poc: deigo gutierrez.)
$84,906
UEI JSAXGRLNEJ63
Provide labor, supervision, materials and safety to accomplish requirements onboard the uss gravely work item: 150-80-001, para 3.3-3.3.1, 3.8-3.8.3.2. period of performance is 1/12/2026 to 08/10/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote , for a total of $223,937.00. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com.
$223,937
UEI YQ9EQZJ8PKM6
*co1* provide labor, supervision, materials and safety to accomplish requirements on the uss gravely (ddg-107) sra for work item: 582-11-001 para's 3.1 - 3.14 and 251-34-001 para's 3.1 - 3.9 per the attached quote. pop: 01/12/2026 - 03/15/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$121,176
UEI JZSHR7DX1MQ9
Rental of 375kw generator (for yrbm-60), freight for rental delivery & pick up
$259,980
UEI EP2TN3E6Z624
*co1* provide labor, supervision, materials and safety to accomplish requirements on the uss gravely (ddg-107) sra (3576-057) for work item: 583-11-003 para 3.1 for the services of a tech rep per the attached oem quote. ffp: $192,721.11. pop: 01/12/26 - 09/11/26. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$192,721
UEI WRKPUUEWMRB3
*co1* provide labor, supervision, materials and safety to accomplish requirements on the uss gravely item 150-11-001 para 3.2, 3.10 - 3.11; 150-11-002 para 3.4; 155-11-001 para 3.5, 3.7; 156-11-001 para 3.4; 251-34-001 para 3.1.3, 3.7.2 - 3.7.3, 3.9; 533-11-001 para 3.9; 582-11-001 para 3.4 - 3.4.1, 3.7 - 3.8, 3.14; 612-11-002 para 3.8; 631-11-003 para 3.3 - 3.3.1, 3.5; 631-12-002 para 3.2 - 3.3; and 631-20-001 para 3.4 - 3.5 per attached quote. pop 1/12/26 – 10/12/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com
$84,736
UEI RXNUR4G46NG3
**co1** to provide labor, supervision, materials and safety to accomplish requirements on the uss gravely item 514-20-001 para rcc 1g, and per 541-20-002 rcc2g attached quote. pop 1/12/26 – 10/12/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com
$1,727,839
UEI RK42LNY7G5P8
One unarmed rover at our river port facility iso uss gravely (ddg-107) sra. pop: 01/05/2026 through 10/19/2026 (288 days (7 fed holidays included)). nte: $149,737.86. see attached spreadsheet. hours allocated are as follows: unarmed rover 01/05/26-03/31/26: 1,548 hours billed at $27.30/hr. two fed holidays: 36 hours at $40.95/hr. unarmed rover 04/01/26-10/19/26: 3,636 hours billed at $28.11/hr. five fed holidays: 90 hours at $42.17/hr. ecr poc: jason kjos, esh director 757-770-5043 or jkjos@ecrfab.com
$149,738
UEI XJAHB2WU39Q1
To provide labor, supervision, materials and safety to accomplish requirements on the uss gravely (3576-004) to provide, erect and remove scaffolding on items 113-80-001, 123-11-002, 123-11-003, 150-80-001, 167-11-001, 168-80-001, 241-80-001, 251-30-001, 251-30-002, 251-30-003, 251-30-004, 251-30-005, 251-30-006, 259-10-001, 259-10-002, 259-10-004, 321-80-001, 467-11-001, 472-11-001, 505-11-001, 522-90-001, 526-80-001, 571-31-001, 581-10-001, 583-11-002, 588-20-001, 593-11-001, 612-80-001, 622-12-002, 623-10-001, 631-13-001, 631-21-001, 631-21-002, 631-21-004, 642-80-001, 643-11-001, 644-11-001, 980-11-002, 980-90-003, 992-11-003, 993-31-003, and 993-31-004. pop 1/12/26 – 9/11/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com.
$549,200
UEI L3P4D4KJD6Q8
Rental of 53' diesel power refrigerated trailer, plus delivery and pick up
$107,017
UEI ENMMW6ZQHGB5
Rental of 5000 cfm blower, plus freight and recurring environmental fee - 5.00%
$44,591
UEI UZGNVGQVER16
To provide labor, supervision, materials and safety to accomplish requirements onboard the uss gravely work item: 634-11-002 para 3.2; 634-11-003, para 3.2-3.2.1; 634-11-004, para 3.2-3.2.1; 634-11-005, para 3.2-3.2.1; 634-11-006, para 3.1-3.2.2; 634-11-007, para 3.2-3.2.1; 634-11-008, para 3.3; 634-21-001, para 3.3-3.4, 3.11- 3.11.2.1, 3.14; and 634-21-002, para 3.4, 3.6, 3.9- 3.12, 3.16 . period of performance is 1/12/2026 to 09/11/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote dated october 29, 2025. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com
$526,620
UEI JZSHR7DX1MQ9
Rental of (2ea) 815 cfm air compressor, (2ea) 930 cfm dryer, 5k telehandler - th255, and (4ea) berm, plus delivery and pick up
$228,888
UEI MNZGEAM8WG31
Manufacture stainless steel framed net assembly with 3/8" x 316 cres stainless steel corner filler net pendants cutout i.a.w. drw.# 612-8978907 and shipcheck measurements; 3/8" x 316 stainless steel flight deck pendant with i.a.w. drw.# 612-8978907 and shipcheck measurements; 5/8" 3 strand nylon guard line i.a.w. drw.# 612-8978907 and shipcheck measurements; lash wire rope nets to frames; manufacture stainless steel corner net; manufacture stainless steel filler net; manufacture stainless steel framed net assembly; shackle(bta)bolt type anchor 7/16" (1t wll)stainless 316 and duardline rope assembly transom aft 3 port and starboard
$78,363
UEI YQ9EQZJ8PKM6
To provide labor, supervision, materials and safety to accomplish requirements on the uss gravely (3576-031) item 256-80-001 para's 3.2 - 3.2.2; item 593-80-001 para's 3.4 - 3.5, 3.7; item 980-11-002 para's 3.9 - 3.9.1; item 992-11-005; and item 992-11-014 para's 3.3 per attached quote. pop 1/12/26 - 10/9/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$209,340
UEI KRK2MLBEL7J7
Accomplish requirements onboard the uss gravely work item: 113-11-001, para 3.3,3.9; 150-80-001, 009-23 for 009-11; 165-80-001, 009-23 for 009-11; 167-11-001, 009-23 for 009-11; 168-12-001, 009-23 for 009-11; 168-80-001, para 3.2.5; 251-30-002, para 3.5.2- 3.5.2.1, 3.7.5, 3.12.1, 3.12.3; 251-30-004, 009-23 for 009-11; 251-30-005, para 3.5.2-3.5.2.1, 3.9.5, 3.12.1, 3.12.3; 259-10-003, 009-23 for 009-11; 259-10-004, 009-23 for 009-11; 264-31-001, para 3.8; 264-32-001, para 3.8; 472-11-001, para 3.1-3.1.15 (pcms only); 512-11-001, 009-23 for 009-11 ; 514-20-001,para 3.9; 514-20-002, para 3.9; 514-20-003, para 3.9; 514-20-004, 009-23 for 009-11; 522-90-001, para 3.19; 526-80-001, 009-23 for 009-11; 555-90-001, 009-23 for 009-11; 571-31-001, para 3.4.1; 583-11-002, para 3.2.8, 3.2.12; 593-11-001, 009-23 for 009-11; 593-11-002, 009-23 for 009-11; 593-90-001, para 3.11; 593-90-002, para 3.8; 631-11-001, 009-23 for 009-11; 631-13-001, 009-23 for 009-11; 631-21-001, para 3.2 (pcms only); 631-21-002, para. 3.1.1 (pcms only); 634-21-001, 009-23 for 009-11; and 642-80-001, 009-23 for 009-11. period of performance is 1/12/2026 to 8/10/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com.
$695,925
UEI PU5BH9QJ3VL3
*co1* accomplish requirements on the uss gravely (3576-095) item 644-11-001 para's 3.1 - 3.12.1 per attached quote, ffp: $62,325.00 pop 1/12/26 – 8/24/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$62,325
UEI FH9HGFKJQUJ9
Accomplish requirements on the uss gravely (3576-022) item 168-12-001 para's 3.1 – 3.2.6, 3.5 - 3.7.3; 571-31-001 para's 3.1 - 3.2, 3.4, 3.4.2 - 3.4.3.1, 3.4.5 - 3.4.7, 3.7 - 3.10; and 588-20-001 para's 3.1- 3.13 per attached quote. pop 1/12/26 – 9/11/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com
$85,414
UEI PU5BH9QJ3VL3
Accomplish requirements on the uss gravely (3576-013) item 123-19-001; 123-19-002; 241-80-001; 555-90-001; 593-90-001; and 593-90-002. pop 1/12/26 - 8/31/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com
$168,705
UEI WA3QAGQERSN5
Accomplish requirements on the uss gravely (3576-040) item 321-11-001 para's 3.1-3.2; 321-80-001 para's 3.1-3.2; 522-90-001; 593-80-002 para's 3.1-3.3; 897-11-002 para's 3.1-3.3.2; and 992-11-007 per attached quote. pop 1/12/26 - 10/9/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 dgutierrez@ecrfab.com.
$781,944
UEI FDDEB3EW3JA4
Accomplish requirements on the uss gravely (ddg-107) sra (3576-094) for work item: 643-11-001 ref 2.2, 2.3; and 644-11-001 ref 2.2, 2.3, per attached quote: 545 dated april 28, 2025. pop: 01/12/2026 - 08/31/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy-26. ecr poc: diego gutierrez 757-769-1180 or dgutierrez@ecrfab.com.
$660,498
UEI LBSGLZXMV554
To provide labor, supervision, materials and safety to accomplish requirements onboard the uss gravely work item: 150-80-001, para 1.2.3, 3.1 - 3.4.8, 3-4.13 - 3.4.14.1. period of performance is 1/12/2026 to 08/10/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote , for a total of $397,575.00. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com.
$397,575
UEI HNQUPHHUSU83
Accomplish requirements onboard the uss gravely work item: 150-80-001, para. 1.2.1, 1.2.2,3.1-3.12; 113-80-001, para 3.1 -3.5.1, 3.7-3.11, 3.13-3.17.2; 122-21-001, para 3.2-3.4.6, 3.6-3.8; 123-11-003, para. 3.2-3.3.1, 3.5-3.5.3; 251-30-002, para. 3.1-3.2.2, 3.3.1-3.8, 3.10; 251-30-004, para 3.1- 3.2.2, 3.3.1-3.9, 3.11; 251-30-005, para 3.1-3.2.1, 3.4-3.8, 3.10; 259-10-001, para. 3.1-3.1.1, 3.3-3.3.2,3.4.1-3.7,3.10; 259-10-002, para. 3.1-3.1.1,3.3-3.3.2,3.4.1-3.8,3.11: and 259-10-004, para. 3.1-3.2.2,3.3-3.9,3.11. period of performance is 1/12/2026 to 08/28/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com.
$1,408,663
UEI EP2TN3E6Z624
Accomplish requirements on the uss gravely (3576-018) item 130-11-001; para 3.1 - 3.6; 251-30-003; para 3.1 - 3.17; 262-41-001; para 3.1 - 3.6; 262-42-001; para 3.1 - 3.6; 583-11-003; para 3.2 - 3.11; 588-21-001; para 3.2 - 3.24; and 588-21-002; para 3.4 - 3.8.1; 3.12 per attached quote. pop 1/12/26 - 9/11/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com
$1,121,727
UEI MYRHHKLSY988
Accomplish requirements on the uss gravely (3576 - 004) item 113-80-001 para 3.4; 123-10-001 para 3.1-3.2.4, 3.4-3.4.1,(ex 3.1.6); 123-14-001 para 3.7; 123-19-001 para 3.2, 3.4; 165-80-001 para 3.1; 241-80-001 para 3.2; 256-80-001 para 3.1.1; 262-41-001 para 3.1; 262-42-001 para 3.1; 264-31-001 para 3.1; 264-32-001 para 3.1; 514-20-004 para 3.2.1; 555-90-001 drain and dispose; 583-11-003 para 3.3; 593-11-001 para's 3.1.-3.6; 593-11-002 para's 3.1 -3.1.1.1; 593-90-001 para 3.1; 593-90-002 drain and dispose; 644-11-001 para's 3.3, 3.8-3.8.2; 992-21-002 para's 3.1-3.2.6.1, (ex 3.2.5); and 992-31-001 para's 3.1-3.2.5. pop 1/12/26 – 9/11/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com
$391,610
UEI V1MQFNQB56Z5
Accomplish requirements on the uss gravely (3576-052) item 551-53-001 para's 3.1 and 3.1.1, 3.2-3.2.2 and 3.2.4, 3.3, 3.3.2-3.3.6, 3.5 and 3.5.1, 3.6, 3.8-3.8.1.1, 3.10, 3.10.1 and 3.11, 3.12 and 3.12.1, per attached quote, ffp: $464,029.85 pop 1/12/26 - 8/3/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc diego gutierrez @ 757-769-1180 or dgutierrez@ecrfab.com
$464,030
UEI RXNUR4G46NG3
To provide labor, supervision, materials and safety to accomplish requirements onboard the uss gravely (103576) wi: 514-21-001 para 3.1-3.7; 514-21-002 para 3.1-3.7; and 514-21-003 para 3.1-3.7 turnkey. pop 1/12/2026 to 08/03/2026. all required references are listed in paragraph 2 of the spec item. iaw the quote attached dated april 11, 2025. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com
$235,665
UEI HHM2PERCK575
Accomplish requirements onboard the uss gravely work item: 512-11-001 para 3.1 -3.1.1, 3.3, 3.5 - 3.5.4, 3.6 - 3.6.1. period of performance is 1/12/2026 to 10/09/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote dated april 23, 2025, for a total of $ 36,840.00. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com
$36,840
UEI L1K5Y97JCLF9
To provide labor, supervision, materials and safety to accomplish requirements work onboard the uss gravely item: 985-12-001 and 992-11-008. period of performance is 1/12/2026 to 08/31/2026. all required references are listed in paragraph 2 of the spec item. iaw the attached quote dated april 25, 2025. all work to be accomplished within fy26. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com
$1,053,572
UEI DQAYCKTDLND5
Cover floor surface protection 30 mil 36" x 100' blue; type iii switchboard matting 3/16" gray diamond plate; and white poly tape 9 mil 4" x 180' flame retardant 12/case
$35,483
UEI DW33W8L3N1P8
Provide a 20 ft conex box for the uss gravely (ddg-107) located at riverport in newport news, VA for work item 863-51-001. pop: 01/12/2026-10/19/2026 poc: jake dinmore / jdinmore@ecrfab.com / 904-222-5067
$175,000