PIIDN3220525C5002DEFINITIVE CONTRACT
$42,787,117.68
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
April 15, 2025
End Date
September 30, 2026
NAICS
PSC
M2CA
Transactions (19)
DateMod #Obligation
Feb 21, 20250+$8,961,691
Mar 28, 2025P00001+$250,000
May 15, 2025P00002+$657,500
Jun 11, 2025P00003+$500,000
Jul 30, 2025P00004+$0
Aug 4, 2025P00005+$302,409
Aug 18, 2025P00006+$500,000
Aug 28, 2025P00007+$500,000
Sep 18, 2025P00008+$657,500
Nov 3, 2025P00009+$0
Dec 23, 2025P00010+$3,588,559
Jan 8, 2026P00011+$2,644,276
Mar 5, 2026P00012+$3,463,762
Mar 13, 2026P00013+$11,053,879
Apr 1, 2026P00014+$4,334,500
Apr 14, 2026P00015+$1,373,042
Apr 27, 2026P00016+$4,000,000
May 28, 2026P00017+$0
Jul 6, 2026P00018+$0
Subcontractors 77$11,216,162 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI RK42LNY7G5P8
*co4* provide the following iaw the attached spreadsheet. pop: 08/12/2026-09/30/2026 (49 regular days and 1 federal holiday). hours are allocated as follows: unarmed brow guard: 1,176 regular hours billed at $30.40/hr. 24 holiday hours at $45.60/hr. unarmed rover: 1,176 regular hours billed at $27.30/hr. 24 holiday hours at $40.95/hr. ecr poc: jason kjos 7577705043 or jkjos@ecrfab.com.
$69,932
UEI XDJCS2DAFF15
*co10* accomplish requirements on the uss hershel williams ((3526-364)) ia3 wi 0804 cco 087. ffp: $110,339.00. pop: 3/9/26-9/15/26. all requirements to be accomplished iaw abs/msc-gtr. ecr poc kelli royals @ 767-861-3326 or kroyals@ecrfab.com
$110,339
UEI MY2CU5T3WSL8
*co2* provide the rental of 170t crane and an operator for the uss hershel woody williams (3526-154) for work item: (roh) 0011 per the attached quote: 20368 dated july 10, 2026. pop: 07/13/2026 - 07/26/2026. ecr poc: kelli royals 757.861.3326 or kroyals@ecrfab.com. 2nd poc: russell tjepkema 757.651.5790 or rtjepkema@ecrfab.com.
$50,803
UEI ZMJENQMLFNA4
*co9* accomplish requirements on the uss hershel woody williams (3526-193) for work item: (roh) 0508 per the attached quote. ffp: $76,701.60. pop: 03/09/2026 - 09/30/2026. all required references are listed in paragraph 2 of the spec item. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$76,702
UEI XJAHB2WU39Q1
*co21* provide scaffolding onboard the uss hershel woody williams (3526-362) for work item: (roh) 0021 cco 72; (roh) 0106 turnkey; (roh) 0308 turnkey and (roh) 0108 turnkey per the attached quote. all work to be accomplished iaw fy26. ecr poc: jody ellison 757-945-2689 or jellison@ecrfab.com.
$62,960
UEI V62BFDZ9NQF3
Provide support onboard the uss hershel woody williams located at riverport in newport news, VA for work item 0513, 0505, and 0511 of the roh period. iaw all invoked standard items fy26. gr pipe solutions to provide pipefitter, pipe welder, and firewatch labor iaw the attached quote dated 06/23/2026. pop: 06/24/2026-09/30/2026 poc: kelli royals / kroyals@ecrfab.com / 757-861-3326
$40,542
UEI ZMJENQMLFNA4
**co8** accomplish requirements on the uss hershel williams (3526-351) ia1 wi 0522 and wi 0520 per attached quote. pop 3/9/26 - 9/30/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$266,237
UEI C461C5ZHBC78
Cmr-1015 manrope, polydac, for pilot ladder 1-1/8" dia; pls-1021 pilot ladder iso 799-1-s17-l21ft 21 foot; qmh-2711s-bb-25 shackle, bolt type, 1" st/st type 316; sdl-1020 embarkation ladder iso 5489-s19-l20ft 20 foot; sdl-1079 embarkation ladder iso 5489-s72-l79ft 79 foot; sdl-1138 embarkation ladder iso 5489-s124-l138ft 138 foot; and sdl-1165 embarkation ladder iso 5489-s148-l165ft 165 foot
$178,228
UEI VPPDS9PWLPL5
Accomplish uss hershel williams ((3526-246)) wi 0556 cco-040 per attached quote. ffp: $50,109.80. pop: 6/19/26-9/30/26. all references in paragraph 2 of the work item. ecr poc kelli royals @ 757-861-3326 or kroyals@ecrfab.com.
$50,110
UEI XJAHB2WU39Q1
Accomplish requirements on the uss hershel woody williams (3526-148) for work item: (ia3) 0651; (roh) 0153 cco 055; (roh) item 0107 turnkey; (roh) item 0103 turnkey and (roh) item 0304 turnkey per attached quote. all work to be accomplished iaw fy26. ecr poc jody ellison @ 757-945-2689 or jellison@ecrfab.com
$60,230
UEI XDJCS2DAFF15
*co9* accomplish requirements on the uss hershel williams ((3526-340)) wi 0511a. ffp: $51,657.20. pop: 3/9/26-8/1/26. all requirements to be accomplished iaw abs/msc-gtr. ecr poc kelli royals @ 767-861-3326 or kroyals@ecrfab.com.
$51,657
UEI XJAHB2WU39Q1
Increase po dm25e0030 by $24,200.00 for wi 0900 per cco 028 iaw the attached quote #2608. by $19,760.00 for wi 0052 iaw the attached quote #2654. by $36,400.00 for wi 0510 of the roh period iaw the attached quote #2680. all original terms and conditions apply.
$80,360
UEI WA3QAGQERSN5
Increase po dm26e0038 by $80,548.04 to accomplish the requirements of wi 0460 of the ia3 period per cco 075 for the uss hershel woody williams iaw the attached quote dated 05/28/2026.
$80,548
UEI JZKXX4XVA343
*co3* increase po dm26e0025 by $41,410.01 to accomplish the requirements of cco 059 for work item 0556 for the ia3 period on the uss hershel woody williams iaw the attached quote 3002689 dated 05/22/2026. all original terms and conditions apply. pop: 05/22/2026-09/30/2026
$41,410
UEI ZMJENQMLFNA4
*co7* increase po dm25e0076 by $40,824.00 to accomplish no. 1 stern tube pump repairs on the uss hershel woody williams for work item 0521
$40,824
UEI ELX3A2CND3W6
To accomplish work onboard the uss hershel woody williams located at ecr's riverport facility in newport news, VA for work item: (roh) 0201 cco 047. renk to conduct an inspection of the port and starboard propulsion motor, line shaft, and thrust bearings iaw the attached quote: sq720323 dated may 19, 2026. pop: 05/22/2026 - 09/30/2026. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$85,883
UEI MYRHHKLSY988
*co16* increase po dm25e0038 by $89,400.00 to pump an additional 111,995 gallons from ballast tank 5-65-1 for work item: (ia3) 0021 cco 078 and $194,500.00 to pump up to 237,000 gallons from ballast tank 6-65-1 for work item: (ia3) 0021 cco 079 for the uss hershel woody williams iaw the attached quote dated may 18, 2026. all original terms and conditions apply. pop: 05/20/2026 - 09/30/2026. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$283,900
UEI XJAHB2WU39Q1
**co17** accomplish requirements on the uss hershel woody williams (3526-256) for work item: (roh) 0197 iaw the attached quote. ffp: $83,420.00. pop: 03/09/2026 - 9/30/2026. all required references are listed in paragraph 2 of the spec item. ecr poc: jody ellison 757-945-2689 or jellison@ecrfab.com
$83,420
UEI DZG8GJ3Z2KQ7
Provide oem support to accomplish work onboard the uss hershel woody williams for wi 0521 cco 026 of the ia1 period iaw the attached quote so26-50359. all original terms and conditions apply.
$41,998
UEI JZSHR7DX1MQ9
Provide rental of 150 ton chiller; 375 amp 50ft 4/0 cable loose with cam locks ; cable tail 4/0 - bare end+female camlock loose and hose 4' suction(camlock) per attached quote (rental details - rent start: 05/21/2026. rent end: 09/15/2026. rent location: riverport. location poc: kelli royals 757-861-3326.)
$81,328
UEI RNANB9NTSM39
*co1* increase po dm26e0060 by $52,983.18 to reflect the updated cost shown on quote vaord005449 for work item 0656 cco 077 for the ia3 period on the uss hershel woody williams. all original terms and conditions apply. pop: 05/20/2026 - 05/30/2026
$52,983
UEI MYRHHKLSY988
* co15* to increase po dm25e0038 by $232,400.00 accomplish the requirements for wi 0021 cco 007 for the roh period on the uss hershel woody williams iaw the attached quote dated 05/13/2026. all original terms and conditions apply.
$232,400
UEI NAA7LGTT6WA4
*co1* procure, calibrate, and install all failed gauges identified in transcat cfr 001 for work item: (ia3) 0561c cco 063 and work item: (ia3) 0561c cco 64 for the uss hershel woody williams iaw the attached quote dated may 11, 2026. all original terms and conditions apply. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$99,500
UEI HNQUPHHUSU83
Increase po for cco 062; to procure material with a 16% markup for work item: (roh) 0306, 0308, 0308, 0510, 0102 and 0110 for the uss hershel woody williams iaw the attached quote. all original terms and conditions apply. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$57,911
UEI ZLGJVJDVY623
**co2** increase po dm26e0053 by $4,118.12 to accomplish t wi 0653 cco 057 and $76,709.88 to accomplish wi 0651 cco 058 for the ia3 period on the uss hershel woody williams. all original terms and conditions apply.
$80,828
UEI KRK2MLBEL7J7
*co4* accomplish requirements on the uss hershel woody williams (3526-203) for work item: (roh) 0605 per the attached quote. ffp: $99,500.00. pop: 05/21/2026 - 09/30/2026.
$99,500
UEI FDDEB3EW3JA4
Accomplish requirements on the uss hershel woody williams (3526-171) for work item: (roh) 0107, 0108, 0304, 0605, 0103, 0105 and 0106 per the attached quote: jcw-68 dated may 05, 2026. pop: 05/21/2026 - 09/30/2026. all references are located in paragraph 2 of the work item. ecr poc: jody ellison at 757-954-2689 or jellison@ecrfab.com.
$148,400
UEI FQJTKZNF6GY5
*co4* po by $3,700.00 to accomplish the requirements of work item: (ia3) 0572a cco 060, *co5* to increase po dm25e0129 by $36,287.13 to accomplish repairs iaw report vw0364-4 for wi 0562 cco 071, and *co6* to procure test gas and calibrate the scba compressor iaw the cfr submitted for wi 0563a cco 065 of the ia3 period on the uss hershel woody williams iaw the attached quote. all original terms and conditions apply.
$41,335
UEI FH9HGFKJQUJ9
Increase po dm25e0131 by $43,927.50 to renew ltfw corroded fasteners for wi 0595 cco 015 for the roh period on the uss hershel woody williams iaw the attached quote dated 05/04/2026. all original terms and conditions apply.
$43,928
UEI MYRHHKLSY988
*co16 * pump an additional 111,995 gallons from ballast tank 5-65-1 for work item: (ia3) 0021 cco 078 and pump up to 237,000 gallons from ballast tank 6-65-1 for work item: (ia3) 0021 cco 079 for the uss hershel woody williams iaw the attached quote dated may 18, 2026. all original terms and conditions apply. pop: 05/20/2026 - 09/30/2026. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com. or kroyals@ecrfab.com.
$283,900
UEI TBN5HN9WRAM5
Accomplish work onboard the uss hershel woody williams located at riverport facility in newport news, VA for work item: (roh) 0578 cco 028; 0578 per cco 028; 0579 per cco 029; and 0579 per cco 029 iaw the attached quote: qt0071150 dated april 09, 2026. pop: 04/17/2026 - 09/30/2026. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$127,737
UEI U864F3HRME53
Accomplish requirements on the uss hershel woody williams (3526-228) for work item: (ia3) 0598; 0201; 0312; and 0301a per the attached quote. pop: 03/09/2026 - 09/30/2026. all required references are located in paragraph 2. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$797,544
UEI HHM2PERCK575
Accomplish requirements on the uss hershel williams (3526-204) wi 0851a and wi 0852 per attached quote. pop: 4/15/26-8/1/2026. all required references are listed in paragraph 2 of the spec item. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$45,680
UEI E3YNKWRANZ18
Accomplish requirements on the uss hershel williams (3526-200) wi 0585a per attached quote. ffp:$88,697.78. pop: 4/15/26-8/1/2026. all required references are listed in paragraph 2 of the spec item. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$88,698
UEI HNQUPHHUSU83
Accomplish roh wi 0602; 0603; cco16 wi 0475; cco25 wi 0152; cco 26 wi 015; wi 0308; cco 26 wi 0813; wi 0111; wi 0199; wi 0102; wi 0110; wi 0306; wi 0510 and cco 31, wi 0308 on-board the uss woody williams located at riverport shipyard from now through 7/1/2026. ecr will provide sub ktr's to accomplish paint, decking, staging, insulation and gas-free upon receipt of chits provided by the ait on-site project manager. ait is required to have a supv briefing at all daily production and schedule meetings to provide current status and assist in the coordination of any such requests. **ecr has procured materials and are ready for turn over** if any are missing, ait will procure all of their own materials and submit cost receipts along with a 16% mark up for reimbursement. the ecr on-site project manager is kelli royals @ 757-861-3326.
$1,151,345
UEI FH9HGFKJQUJ9
*co4* accomplish wtd repair; para. 7.0-7.20 with tech rep support; para. 7.0-7.20 with tech rep support; and replace port high seachest skin valve onboard the uss woody williams located at riverport for work item: (ia3) 0900 cco 42 per the attached quote. ecr will provide a po to east coast valve for the shop work portion only. the pop is now through 07/01/2026. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$62,118
UEI JA2KCX21NL48
*co1* and *co2* accomplish requirements on the uss hershel williams (3526-181) roh wi 0307, increase for cco052 per attached quote. pop: 3/9/26-9/30/26. all required references are located in paragraph 2. ecr poc kelli royals @ kroyals@ecrfab.com or 757-861-3326.
$212,715
UEI CLCKQ1XMY6D4
Increase po sc25w0151 by $52,256.99 to provide oem support onboard the uss hershel woody williams for wi 0599 cco 035 for the roh period iaw the attached quote qot0003157-3 dated 04/16/2026. all original terms and conditions apply.
$52,257
UEI QUA5D1RC6BB3
Provide oem support onboard the uss hershel woody williams located at ecr's riverport facility in newport news, VA for work item: (ia3) 0591a cco 044 and work item: (ia3) 0589 cco 045. iaw the attached quote: q301911_cco44 dated april 15, 2026. pop: 04/21/2026 - 09/30/2026. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$132,289
UEI EAPRNLG15EJ1
*co3* increase po dm25e0128 by $341,676.92 to provide oem support on the uss hershel woody williams for work item: (ia3) 0206a cco 033 iaw the attached quote: q-31309 dated february 25, 2026. ecr acknowledges and accepts the bid notes listed in the quote. all original terms and conditions apply.
$341,677
UEI FH9HGFKJQUJ9
*co3* accomplish work on the uss hershel woody williams (3526-057) for work item: (ia1) 0522; ltfw cooler cleaning & inspection; and htfw cooler cleaning & inspection onboard the uss hershel woody williams (3526-198) for work item: (roh) 0518a per the attached quote. pop: 03/09/2026 - 07/01/2026. all references are located in paragraph 2 of the work item. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com. 2nd poc: justin stern 904-885-9462 or jstern@ecrfab.com.
$49,940
UEI MYRHHKLSY988
*co10* accomplish requirements on the uss hershel woody williams (3526-238) for work item: (ia3) 0165 turnkey; 0516; 0011 iaw all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: timothy kehoe 757-634-2595 or tkehoe@ecrfab.com.
$132,420
UEI XJAHB2WU39Q1
*co11* accomplish requirements on the uss hershel williams (3526-227) item 0151 turnkey; wi 0153 cco 026; wi 0152 cco 025; and wi 0540 per cco 050 for the lb1 period. all original terms and conditions apply.
$169,425
UEI FE6LAJ81JKF9
Accomplish requirements on the uss hershel woody williams (3526-177) for work item: (roh) 0303; 0305; and 0353a per the attached proposal: m24-00451. pop: 04/15/2026 - 09/01/2026. all required references are listed in paragraph 2 of the spec item. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$238,479
UEI YKP9GGNT1EK8
**co1** please issue a change order to bluepoint engineering llc to increase po dm25e0012 by $896,790.00 to extend their current contract to provide four watchstander positions to be filled 7-days per week on the uss hershel woody williams. all original terms and conditions apply. pop: 04/16/2026-09/30/2026
$896,790
UEI RK42LNY7G5P8
*co3* increase po dm25e0011 by $165,483.60 to provide the following iaw the attached spreadsheet: unarmed brow guard: 2,760 regular hours billed at $30.40/hr, 72 holiday hours at $45.60/hr. unarmed rover: 2760 regular hours billed at $27.30/hr, 72 holiday hours at $40.95/hr. pop: 04/15/2026-08/11/2026 (115 regular days and 3 federal holidays). ecr poc: jason kjos 757-770-5043 or jkjos@ecrfab.com.
$165,484
UEI KH31DNAMP754
Accomplish requirements on the uss hershel woody williams (3526-187) for work item: (roh) 0404 iaw the attached quote. ffp: $55,200.00. pop: 04/09/2026 - 09/01/2026. all required references are listed in paragraph 2 of the spec item. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$55,200
UEI XDJCS2DAFF15
*co6* accomplish ia3 work item 0804 and 0805 on-board the uss woody williams iaw tci quote 2026gov8198. the pop is now through 6/30/2026. the ecr poc is kelli royals @ 757-861-3326.
$82,811
UEI FH9HGFKJQUJ9
*co2* increase po dm25e0131 by $149,626.00 to accomplish work onboard the uss hershel woody williams for wi 0556 for the ia3 period. pld mechanics to coordinate directly with oems and all parties involved to accomplish this wi in its entirety. all original terms and conditions apply. pop: 04/03/2026-07/01/2026
$149,626
UEI JW63VMCWX4M4
Increase po ml25e0427 by $13,160.00 to accomplish para. 7.1-7.8.3 for wi 0907; increase po ml25e0427 by $59,400.00 to accomplish para. 7.1-7.11.2 for wi 0952; and increase po ml25e0427 by $29,640.00 to accomplish para. 7.1-7.13.1 for wi 0958 in the roh period onboard the uss hershel woody williams. all original terms and conditions apply. pop end date: 09/30/2026
$102,200
UEI FQJTKZNF6GY5
Accomplish requirements on the uss hershel williams (3526-135) item 0565b; 0567b; 0569; 0570; 0571; 0572a; 0573; 0574a; and 0566 per attached quote. pop 3/9/26 - 5/21/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$255,386
UEI WA3QAGQERSN5
*co1* accomplish requirements on the uss hershel williams (3526-213) item 0302 and item 0460 turnkey various locations per attached quote. pop 05/21/26 - 08/01/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc timothy kehoe @ 757-634-2595 or tkehoe@ecrfab.com
$70,010
UEI HHM2PERCK575
Accomplish requirements on the uss hershel williams (3526-209) item 0853 turnkey various locations per attached quote, ffp: $98,840.00 pop 05/21/26 - 08/01/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc timothy kehoe @ 757-634-2595 or tkehoe@ecrfab.com
$98,840
UEI NAA7LGTT6WA4
Accomplish requirements on the uss hershel woody williams (3526-132) for work item: (ia3) 0561c iaw the attached quote. ffp: $89,076.00. pop: 03/09/2026 - 10/01/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$89,076
UEI MYRHHKLSY988
*co8* accomplish requirements on the uss hershel woody williams (3526-117) for work item: (ia3) 0021 iaw the attached quote. ffp: $264,000.00. pop: 03/09/2026 - 10/01/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$264,000
UEI ZA1KMNAJMVT3
Accomplish requirements on the uss hershel woody williams (3526-115) for work item: (roh) 0150 turnkey various locations iaw the attached quote. ffp: $65,790.00. pop: 05/21/2026 - 08/01/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy26. ecr poc: timothy kehoe 757-634-2595 or tkehoe@ecrfab.com.
$65,790
UEI WA3QAGQERSN5
Accomplish requirements on the uss hershel williams (3526-095) item 0301 cco 2; item 0305 cco 9; item 0309 cco 23; and item 0315 cco 12. pop 3/9/26 - 5/4/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$90,548
UEI RK42LNY7G5P8
**co2** issue po to allied universal security for one armed cia gate guard at our river port facility. pop: 01/01/2026 through 07/31/2026 (212 days (6 fed holidays included)). nte: $156,864.00. see attached spreadsheet. hours allocated are as follows: armed cia gate guard guard: 4,944 hours billed at $30.40/hr. six fed holidays: 144 hours at $45.60/hr. ecr poc: jason kjos, esh director 757-770-5043 or jkjos@ecrfab.com
$156,864
UEI M8LCUMSL3TQ7
Provide labor, materials, supervision, and safety to accomplish requirements on the uss hershel williams (3526-090) wi 0540 cco 17 per attached quote. ffp:$96,312.09. pop: 4/15/26-8/1/2026. all required references are listed in paragraph 2 of the spec item. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$96,312
UEI M5G6JXFLMGN5
**co3** issue mod to po ml25e0137 for moran towing corporation to provide tug support for the uss hershel woody williams (3526-091) wi 0011 cco 47 per attached quote. ffp:$60,140.03. pop: 4/1/25-8/1/26. inv 1135433
$60,140
UEI YPT7NRD8L3X3
To provide labor, supervision, materials and safety to accomplish requirements on the uss hershel williams (3526-088) item 0552 per attached quote, ffp: $65,502.83. pop 4/15/25 - 10/1/26 all required references are listed in paragraph 2 of the spec item. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$65,503
UEI ZMJENQMLFNA4
*co4* provide labor, supervision, materials and safety to accomplish requirements on the uss hershel williams (3526-087) for work item: (ia1) 0522 cco 020 per the attached quote. ffp: $163,936.80. pop: 08/18/2025 - 06/01/2026. all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$163,937
UEI XDJCS2DAFF15
*co2* provide labor, material, and supervision onboard the uss hershel woody williams (esb-4) for work item: 0511a cco 041, 042, 043, 044, and 040 per attached quote. pop: 04/15/2025 - 10/01/2026. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$112,292
UEI JW63VMCWX4M4
*co1* accomplish requirements on the uss hershel williams (3526-074) item 0958 cco 011 and cco 012 per attached quote. pop 11/10/25 - 11/21/25 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$46,880
UEI FMKADN1KAXH6
*co1* accomplish requirements on the uss hershel williams (3526-069) item 0402 per attached quote, ffp: $79,862.00 pop 11/10/25 - 11/21/25 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com
$79,862
UEI ZMJENQMLFNA4
*co3* accomplish requirements on the uss hershel williams (3526-067) item 0520; item 0521; and item 0523 per attached quote. pop 8/18/25 - 9/12/25 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$386,126
UEI KNEFNMWXBK39
Breaker and transformer, power
$63,680
UEI MNZGEAM8WG31
2-5/8” x 650’ double braid nylon 6’ eye/chaffing gear one
$83,300
UEI HWLGUR28KMS6
4wrz25w325-7x/6eg24n9k4/v-373; 4wrz25w6-325-7x/6eg24n9k4/v; cable track (large); expansion tank kit; filter element; flex io module; junction box; and tank cover assembly
$52,966
UEI LR2HQKYJLDZ7
Pima 150# brz/flgd/hose angle valve/bt/comp. disc and pima 150# brz/flgd/hose globe valve/bt/comp. disc
$97,205
UEI ZMJENQMLFNA4
*co** provide labor, supervision, materials and safety to accomplish requirements on the uss hershel williams (3526-057) item 0522 per attached quote, ffp: $61,000.00 pop 6/13/25 - 4/14/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com
$61,000
UEI C5JCTRRWHC21
Provide labor, supervision, materials and safety to accomplish requirements on the uss hershel williams (3526-054) item 0542 per attached quote, ffp: $166,892.00 pop 6/13/25 - 4/14/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$166,892
UEI ZMJENQMLFNA4
*co1* accomplish work item: 0523, onboard the uss hershel woody williams located at riverport. services to be performed is to overhaul the ships's central low temperature freshwater pumps and motors. period of performance is 8/18/2025 to 9/16/2025 . iaw the attached quote dated july 23, 2025 for a total of $41,000.00. all work to be accomplished within fy25. ecr poc: dion wigfall 757-813 -0723 or dwigfall@ecrfab.com.
$41,000
UEI MYRHHKLSY988
*co3* provide labor, supervision, materials and safety to accomplish requirements on the uss hershel williams (3526-044) item 0100, (3526-049) item 0521, (3526-047) item 0523, and (3526-038) item 0021 per attached quote. pop 6/13/25 - 4/14/26 all required references are listed in paragraph 2 of the spec item. all work to be accomplished iaw fy25. ecr poc: kelli royals 757-861-3326 or kroyals@ecrfab.com.
$70,650
UEI FMKADN1KAXH6
For labor to accomplish work item: 0402, onboard the uss hershel woody williams located at riverport. services to be performed is to provide an oem representative or trained, experienced and authorized service personnel for the specific system. supply all services and assistance to accomplish the inspection and servicing of the general announcing and talk back system identified in section 3.0 using references 2.1 through 2.3 as guidance. period of performance is 8/18/2025 to 9/16/2025 . iaw the attached quote dated august 06, 2025 for a total of $40,968.00. all work to be accomplished within fy25. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com
$40,968
UEI ZMJENQMLFNA4
For labor to accomplish work item: 0520 and 0521, onboard the uss hershel woody williams located at riverport. services to be performed is to overhaul the mission module seawater pumps (2). period of performance is 8/18/2025 to 9/16/2025 . iaw the attached quote dated july 23, 2025 for a total of $85,000.00. all work to be accomplished within fy25. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com
$85,000
UEI XDJCS2DAFF15
To provide emergent technical services by providing labor, material, and supervision onboard the uss hershel woody williams (esb-4) located at riverport in newport news, VA for work item 0511a per cco 019. iaw attached quote #2025com7666 for $319,404.88. all work to be accomplished within fy25. pop: 04/15/2025 - 11/30/2025. ecr poc: dion wigfall 757-813-0723 or dwigfall@ecrfab.com.
$319,405