Back to contract actions
Awarding Agency
Sub-Agency
Department of the Navy
Start Date
September 2, 2025
End Date
October 16, 2026
NAICS
PSC
Z2ED
Transactions (8)
| Date | Mod # | Obligation |
|---|---|---|
| Sep 2, 2025 | 0 | +$225,700,000 |
| Nov 6, 2025 | P00001 | +$152,000,000 |
| Feb 12, 2026 | P00002 | +$150,000,000 |
| Feb 18, 2026 | P00003 | -$75,000,000 |
| Mar 12, 2026 | P00004 | +$0 |
| Apr 30, 2026 | P00005 | +$62,927,193 |
| Jul 9, 2026 | P00006 | +$1,964,216 |
| Jul 17, 2026 | P00007 | +$0 |
Subcontractors 22$84,895,457 total
Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete
| Subcontractor | Amount |
|---|---|
UEI FB8SXSEEVAP1 Provide design phase surveying and establish construction baseline monitoring baselines for the duration of construction to measure against. provide construction survey and monitoring for facility structures and potential impacts related to construction. provide layout markings for core and drilling subcontractors. | $1,000,000 |
UEI HG17C8B1NPB3 Base rock supply and placement
a. provide, haul, and place base rock material in designated areas of the project site.
b. perform grading, compaction, and proof-rolling of base rock to achieve required thickness, density, and surface tolerances.
c. maintain the base rock surface free from rutting, pumping, and contamination until acceptance or overlay by subsequent work.
asphalt removal
a. sawcut, break, and remove existing asphalt pavement at project-designated locations.
b. excavate to required depth and remove asphalt and sub-base material as directed.
c. load, haul, and legally dispose of asphalt waste at an approved off-site disposal facility.
d. prepare subgrade or replacement section for follow-on construction in coordination with adjacent trades.
sinkhole repair
a. excavate the sinkhole area and remove loose or unsuitable materials.
b. install engineered backfill (aggregate, rock, or controlled low-strength material as directed) in compacted lifts.
c. reconstruct surface to match adjacent grade and provide stable condition for follow-on work.
d. implement measures to prevent recurrence, including stabilization fabric, drainage improvements, or other means if directed.
general
a. provide traffic control, site access coordination, and laydown in accordance with attachment a – additional provisions ap-e2
requirements.
b. maintain safe work zones in compliance with em 385-1-1, accident prevention plan (app), and activity hazard analyses (aha).
c. coordinate with other subcontractors, including utility locates subcontractor prior to excavation, and contractor to avoid
disruption of ongoing work and owner operations.
d. perform daily cleanup and remove debris generated by operations.
e. protect adjacent structures, pavements, and utilities. repair damage caused by subcontractor at no cost to contractor.
f. protect completed work with cone delineation and/or construction rope until materials have come to strength and are safe to
walk or drive on. | $500,000 |
UEI NH66W1D2GDT1 Provide misc. storage and trucking services | $300,000 |
UEI L1HCMN9QMJL1 Provide pavement marking and striping services | $44,995 |
UEI VTR5L2GMBN23 Provide paving services for dry dock topside. | $500,550 |
UEI EHKQC5N3C933 Provide onsite safety supervision support | $250,000 |
UEI KEJ3MQLNGV99 Provide temporary fencing as needed. facilitate sale of garlock barrier and handrail | $233,824 |
UEI HL7KQSMMY329 Provide diving and remote operated vehicle inspection services in the dry dock to monitor "do no harm" efforts | $542,548 |
UEI H8JDU7AJ87V3 Barge rental for kiewit field personnel | $109,950 |
UEI QD82C6ELE588 Drilling and installation of dry dock wall tieback anchors. | $40,480,000 |
UEI NXM8TF3B3R95 Fabrication of anchor plate and anchor head assemblies | $1,578,222 |
UEI NAQXKLJTM8D4 Core drilling and bolt hole drilling for dry dock wall anchors. | $3,600,000 |
UEI C7W3PMJGWQT7 Provides material lab testing, quality control and environmental management assistance | $2,325,455 |
UEI SY3BP3E8A798 Provide grout sampling and testing for quality controls | $1,000,000 |
UEI R3HRLSMVXDY7 Concrete washout bins and disposal services | $2,800,000 |
UEI EN4SSCLGGXT3 Provide vacuum truck services on request to clean out waste water tanks and assist with utility potholing when necessary. | $150,000 |
UEI HMJKFKDE9N68 Provide onsite portable toilets and associated services | $100,000 |
UEI GFK7ANN57833 Trucking expeditor to facilitate trucking services. | $1,500,000 |
UEI V5XTQ5H736B7 Marine yard rental space for flexifloat assembly space | $400,000 |
UEI HEYWFLGZNMR8 Provide utility location services for design work. | $70,500 |
UEI SRK1XZA4QKP9 Design engineering as well as engineering during construction services. | $27,009,414 |
UEI WXUNGCFNJ6C5 Provide marine yard space and crane rental for mobilization efforts. | $400,000 |