FedOps logoFedOps
Back to contract actions
PIIDW912DY25FA157DELIVERY ORDER

STAMPEDE VENTURES, INC.

UEI: WT4BZHCLS8X7
$4,826,825.62
Awarding Agency
Sub-Agency
Department of the Army
Start Date
September 30, 2025
End Date
October 14, 2027
NAICS
PSC
Z2DA
Transactions (2)
DateMod #Obligation
Sep 12, 20250+$4,826,826
Sep 26, 2025P00001+$0
Subcontractors 4$2,197,306 total

Subcontracts reported by primes (FFATA) · first tier only, self-reported, may be incomplete

SubcontractorAmount
UEI LQAELQGFMDD1
Subcontractor shall design, develop, and integrate cybersecurity into the system(s), within the scope of the project, to include, but not limited to, all hardware, software and/or equipment iaw the DOD, department of the army (da), any other applicable government agency standards or regulations. this work shall be done iaw all applicable cybersecurity regulations and directives, as provided in the pws. subcontractor shall provide cybersecurity that is iaw current policies, procedures, and statutes, to include (but not limited to) those listed in this pws. subcontractor is not responsible for the full risk management framework (rmf) process but will perform the technical hardening and documentation of the system as described in this section. subcontractor shall follow unified facility criteria (ufc) 4-010- 06 and unified facility guide specification (ufgs) 25 05 11, cybersecurity of facility-related control systems and provide a tailored and redlined ufgs 25 05 11 for government review and approval prior to beginning installation. subcontractor shall interface with the base via cor to define existing system requirements, confidentiality integrity, availability impact ratings, transport cybersecurity requirements (existing enclave, standalone, etc.), existing authorization status and type of authorization (rmf), local installation cyber-requirements and other items that may impact the security posture of the system or scope and level of work required. contractor is responsible for providing all required software and hardware licenses, related to cybersecurity, and maintaining their validity for the duration of the contract unless otherwise specifically stated. this project will be modifying a system with an existing authority to operate (ato). subcontractor shall make every effort to maintain the validity of this existing ato in coordination with the government. this will require abiding by the documented change management process, hardening any new components to the established security control baseline, and providing the artifacts listed below to fully document the change. individuals performing cybersecurity design functions shall meet certification and skills requirements for iam level ii certified professional outlined in DOD 8570/8140 information assurance workforce improvement program. it is the subcontractor’s responsibility to ensure the latest DOD, component and installations policies and guidance are met for the requirements. subcontractor shall allow 60 government workdays for dha review and approval for the dha vendor risk assessment form. subcontractor shall not order or install any materials without the approval of the dha vendor risk assessment form. system administrators, or any subcontractor personnel making configuration changes to existing servers, workstations, or network devices, will meet the requirements of an information assurance technical (iat) level ii. these individuals will be trained and qualified as specified in DOD 8570.01-m, army regulation 25-2 and da pam 25-2- 6. for the fls, subcontractor shall assume a system categorization of: confidentiality: low, integrity: mod, availability: mod, post-installation, but prior to final system acceptance, subcontractor shall provide an updated set of all cybersecurity documentation and scans listed above
$162,858
UEI ESMPZ5ZN6BL4
Support of design after award process, to include drawing and specification review, field verification of existing electrical and fire alarm infrastructure, compliance quality control of design documents and participation in the value engineering process. subcontractor shall furnish and install new fire alarm and mass notification system in building 3349. including the conduit, mc, liquid-tight, wire, fittings, supports, boxes, panel monaco fire alarm systems, wheelen mns system, design support, sprinkler support for testing, fire alarm programming, testing, reports, submittal support, and installation. after testing and approval of the new fire alarm and mass notification system, the existing fire alarm and mass notification system will be demolished and removed. work also inclu
$1,292,227
UEI GAK3VQRQJ8R5
Qualified fire protection services: • complete the qfpe services and provide the design in accordance with applicable ufc’s, the 2024 editions of ibc and ifc, the 2022 edition of nfpa 72 and the 2024 edition of nfpa 101 as well as all applicable referenced standards therein and the activities, tasks and deliverables outlined. 4.5.2 fire protection engineering services: • evaluation of existing facility for compliance with current ufc and codes related to life safety and means of egress. fire protection engineering will provide a fire protection design analysis with life safety drawings including identification of any existing deficiencies. • provide required qfpe services in accordance with ufc 3-600-01 for the project. • develop fire alarm and mass notification system shop drawings in accordance with ufc 3-600-01 and nfpa 72 for construction. • develop required fire alarm and mass notification system calculations. 4.5.3 mechanical engineering services: • demolition of lift station pumps and associated controls. • specification of new pumps and packaged controls. • specification of piping and valving associated with new pumps. • provide construction ventilation (cv) specification that accounts for maintaining proper hvac in adjacent spaces and a negatively pressurized construction zone during the construction. • assist in the preparation of an infection control risk assessment 2.0 form. we will collaborate with facility representatives and the rest of the design and construction team to finalize the form. • review of up to 3 tab reports (pre-cv setup, post-cv setup, and post-cv take down) required in the specifications. 4.5.4 structural engineering services: • design of supports for major pieces of equipment: wall mounted cabinets, panelboards, switchboards and motor control centers. • design of gravity supports for mechanical and electrical conduit and non-sprinkler piping, as needed. • atfp reinforcement as required. 4.5.5 cybersecurity engineering services: the scope for cybersecurity design requirements includes implementing cybersecurity features in all control systems according to unified facilities criteria 4-010-06, cybersecurity for facility related control systems, and unified facilities guide specifications (ufgs) 25 05 11 – cybersecurity for facility-related control systems, and as needed by installation policy. frcs cybersecurity design services include coordination with cybersecurity stakeholders, documentation of confidentiality, integrity, and availability (c-i-a) impact levels identified by system owner (so) for development of control correlation identifiers (ccis) list, identify authority to operate (ato) status, and will be performed by a coffman iam level ii certified professional outlined in DOD 8570/8140 information assurance workforce improvement program. as such, coffman will include cybersecurity design for: • fire and life safety facility-related control systems to include the fire alarm and mass notification system with a l-m-m c-i-a rating. • coffman will produce the following deliverables by the end of the design process: a basis of design (bod), control correlation identifier (cci list), and ufgs 25 05 11 cybersecurity for facility-related control systems specification for each identified frcs system. 4.5.6 electrical engineering services: • evaluation of power to existing fire alarm system, egress path lighting controls and sump pump system to determine electrical modifications required by this project. • investigation of existing facility electrical distribution system and suitability to support this project. • investigation of existing facility generator system and suitability to support this project. • as-builting and load calculation of the generator system. • investigation of existing rainwater/condensate sump pump system, and electrical support for the replacement system. • if any egress path lighting control systems require modification due to current fire alarm codes, design of those
$697,772
UEI G94GP7DA7BU5
• demo existing pumps and piping as needed to accommodate new sump pumps. • furnish and install temporary pumping solution. • furnish and install new duplex pumps. • furnish control panel and floats for install by others. • new piping within 20' of sump basin.
$44,449