AI Summary
Description
SOLICITATION NUMBER: W912DW26RA014 TITLE: Joint Base Lewis-McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3218 and 3219 LOCATION: JBLM, Washington FSC CODE: Y1AZ - Construction of Other Administrative Facilities and Service Buildings NAICS CODE: 236220, Commercial and Institutional Building Construction ISSUE DATE: On or about 29 January 2026 RESPONSE DATE: On or about early-mid March 2026 100% Small Business Set-Aside Construction of Joint Base Lewis-McChord (JBLM) Multi Domain Task Force(MDTF) Buildings (BLDGs) 3218 and 3219. FOR INFORMATION ONLY: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this SYNOPSIS should be submitted in writing via email to the Contract Specialist as noted below. The United States Army Corps of Engineers (USACE) Seattle District anticipates solicitation and award of a Firm-Fixed Price contract resulting from Request for Proposal (RFP) W912DW26RA014. The project intends to convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command located at JBLM. This RFP is available to all business firms with active SAM registration under North American Industry Classification System (NAICS) Code 236220, Commercial and Institutional Building Construction. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii), construction magnitude is estimated to be in the range of $25,000,000 to $100,000,000. 100 percent payment and performance bonds will be required. The project intends to will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for each building will require: a) Hazardous material / debris abatement and removal mostly within the crawl space b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc, c) Removal at ~ 90% removal of building mechanical – electrical systems d) Removal of the existing roof EPDM system (but not the roof framing structure) The definitive repair / new work items for each building will require: e) New exterior envelope f) New building mechanical – electrical systems g) New roof TPO system. Other considerations for site work coordination h) New utility connections (mostly by other entities) i) Shared construction boundaries with adjacent current and future projects Selection Process: The Government anticipates using a best value trade-off source selection process in accordance with Federal Acquisition Regulation (FAR) Part 15.101-1. This process allows for a trade-off between non-price factors and price and al…
Classification
Place of Performance
Contracting Office
Contacts