AI Summary
Description
****** 22 December 2025 posted Bid Opening Results ******* ********* Amendment 0001 to update Wage Rate ******* This project includes regrading and stabilizing the exposed soil over the entire site adjacent to the existing parking positions on the western edge of the rotary wing apron. Demo an existing drainpipe, install a precast head wall (provided by the government), and perform ~63K square yards of earthwork and hydroseeding to prevent future erosion.
Classification
Contracting Office
Contacts
Attachments (1)