AI Summary
Description
Notice ID: W911S226U2273Primary Solicitation Manager: Nfamory ToupouSubject: Description: 593D CSC needs 57 cubic yards of concrete poured over 2 days. The concrete must have a 5 inch slump and have a 4000 psi capability. The vendor does not need to provide labor. Soldiers will provide the labor. The vendor only needs to provide the concrete and a mixer to deliver/pour it. The concrete shall meet the following specifications. Concrete will be at 3,500 psi when fully cured. The slump of the concrete will be no more than 3 inch. Specified compressive strength FC is MPA 3,000 psi at 28 days. Air content must be between 4.5 and 7.5 percent-Maximum water-cementitious material ratio is 0.50 surfaces permanently exposed to view shall be so that the final color when cured is the same as adjacent concrete.
Classification
Place of Performance
Contracting Office
Contacts