AI Summary
Description
DK Heart Butte Dam Safety Modification PRE - SOLICITATION NOTICE 140R6026R0004 The Bureau of Reclamation (hereinafter referred to as Reclamation) Missouri Basin Regional Office intends to solicit a Request for Proposals (RFP) on or around April 10, 2026, as described in this Pre-Solicitation Notice. The RFP will be issued via the Sam.Gov web page at https://sam.gov Reclamation Dakotas Area Office (DKAO) has a need for a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the Heart Butte dam infrastructure as described below. The solicitation will be issued under full and open competition. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the Reclamation Missouri Basin Regional Office previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this pre-solicitation notice. This procurement will utilize Far Part 15 procedures. The government intends to award a Firm Fixed Price purchase order to one contractor to accomplish this scope of work. Heart Butte Dam Safety Modification (HBSDM) Project Scope of Work The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. Installation of temporary structural shoring to support conduit integrity during repair operations. Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. Grouting shall be performed in accordance with…
Classification
Contracting Office
Contacts
Attachments (1)