The New York District plans to solicit and award a construction contract for subject project in FY26. The scope of the project is: To construct a generator connection terminal to provide backup power to the Arsenal in the event of a long-term power outage from the facility's Main Substation. The primary scope includes electric manholes, duct bank, grounding cable, fencing, switchgear, transfer switches, cables, generator procurement and installation, splices and connections. Supporting facilities include paving, walks, curbs, gutters, and utilities testing and commissioning. This project will construct a switching station capable of feeding 4MW of power into the existing WVA distribution network and constructing a facility capable of 8MW of power generation needed to power the WVA during an emergency loss of power. The facilities will increase the existing switching station capacity from 4MW to the full 8MW needed for powering the installation fully while also providing the means of that power generation. The project also includes the construction of all necessary utility interconnections to bring fuel to the power generation facility and to connect the switching station to the existing electrical distribution network. The installation of controls for the auto start of this power generation and distribution switch are also included in this project. 1. This notification serves three (3) purposes: a. To notify potential bidders of the Government's intent to solicit a brand name(s) only component for this project. b. To identify potential sources that can provide an equivalent to the brand name only item(s). c. Notification of the Army's intent to solicit brand name components as described below. 2. The items described below, under summary of requirements, are embedded in the construction project. The contract will be issued as a one-step negotiated procurement. Only the components described below will be sole sourced, if no other sources are identified that can provide an equivalent system. In the event no equivalent sources are found, the brand name only justification will be issued pursuant to FAR Part 6.302-1, Only One Responsible Source. A subsequent market survey will not be published in support of a Justification and Approval for sole sourcing. Supplies of the brand name component will be provided directly to the Contractor(s) and not to the Government. 3. Summary of Requirements: a. Mechanical Controls System The requirement is to sole-source a requirement for brand-name Johnson Controls Inc. (JCI) Metasys components, programming, and engineering modifications to support the installation of the sitewide electrical switching project. The purpose of this acquisition is to integrate new control equipment into the existing-to-remain Building Automation System (BAS) infrastructure. Currently, WVA relies heavily on proprietary JCI Metasys controllers and software to monitor and control facility systems. Utilizing OEM-compatible JCI Metasys equipme…
Classification
Place of Performance
Contracting Office
Contacts