AI Summary
AI summary · generated 11/26/2026 · verify on SAM.gov
Description
This Notice of Intent to sole-source, Firm-Fixed-Price (FFP) hourly bridge contract for a period of performance of six (6) months. This action is necessary to ensure the uninterrupted provision of mission-critical, standalone live event audio-visual (AV) technical and operational support across the Presidio of Monterey (POM) installation and tenant activities, primarily supporting the Defense Language Institute Foreign Language Center (DLIFLC). The Government requires these services for an additional six (6) months only, after which the majority of the current requirement will be permanently eliminated and will disappear due to transition to organic government-operated digital platforms / installation of integrated in-house auditorium media systems. The Contractor shall provide turn-key, standalone Audio-Visual (AV) staging, live sound reinforcement, video switching, multi-source recording, light editing, and logistics support across the POM installation and surrounding locations within a 30-mile radius (including the Naval Postgraduate School). The operational necessity driving this short-term sole-source action is that the requirement for dedicated, standalone, hourly AV contractor support will largely cease to exist after the proposed six-month period. Over the next six months, POM and DLIFLC are implementing permanent institutional adjustments transitioning residual needs to organic garrison staff which eliminate the recurring demand for external contractor-provided event AV services. Conducting a competitive solicitation and transitioning to an alternative vendor for an operational window of only six months is commercially unreasonable and fiscally irresponsible. Competing a requirement that will expire upon or shortly after award creates severe administrative inefficiencies without providing any recurring lifecycle return on investment. Awarding this short-term bridge to any contractor other than the incumbent would impose significant non-recoverable onboarding, physical staging, and security mobilization costs on both the Government and industry.
Classification
Place of Performance
Contacts
Attachments (1)