AI Summary
Description
The contractor will provide installation, testing, training, rigging, and utility connections for each piece of equipment. Additionally, the contractor will provide documentation of all work performed, a site preparation and installation plan, acceptance testing plan, and their lockout/tag-out procedures to FRCE. Acceptance testing would culminate with an operational test and final inspection.
Award Details
Classification
Place of Performance
Contracting Office
Contacts