AI Summary
Description
This non personal services requirement is being competed as a Firm Fixed Price 100% Total Small Business set aside, under NAICS 238210 and PSC N059. The contractor shall provide all personnel and supervision required to perform the de-installation of Air Traffic Control (ATC) equipment in the existing Air Traffic Control Tower (ATCT) at Hatch Stagefield, Fort Rucker, Alabama and the installation of the ATC equipment into newly constructed ATCT as per building design. Installation shall include all required cabling and grounding as specified in the appropriate regulations and standards FAA-STD-019e and MIL-STD-188-124(B).
Classification
Place of Performance
Contracting Office
Contacts