AI Summary
Description
The central aim of this acquisition initiative is the design and implementation of a hybrid solar system in the Office of Immigration Assistance located on the border of Valle Nuevo, Jutiapa, to guarantee operational continuity, energy efficiency and institutional sustainability in a strategic installation of the Government of Guatemala, that fulfill or exceed the requirements of the statement of work (SOW) detailed in this document. The office has an energy demand of approximately 3,000 kWh per month, mainly derived from computer systems, servers, lighting and administrative support equipment essential for immigration care and border control. Due to the critical nature of the operations carried out in this facility, it is essential to have a reliable energy system that allows services to be kept running during power outages, voltage variations or failures in the public grid. Border facilities are usually located in areas where the following may occur voltage variations, power outages, or instability of supply.
Classification
Place of Performance
Contracting Office
Contacts
Attachments (1)