AI Summary
Description
This announcement is for information and planning purposes. It is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The California Air National Guard, 146th Airlift Wing (146th AW) Channel Islands ANG Station, Port Hueneme has a requirement entitled: INSTALL NCC HVAC B602 The 146th AW intends to solicit quotes from at least three (3) interested sources in accordance with RFO FAR 12.201-1 Simplified procedures. This is expected to be 100% set aside for a Small Business competition after approvals are completed and is intended to result in award of one (1) firm-fixed price contract with an expected contract delivery/contract completion date of 31 March 2027. The general salient characteristics of the requirement include but are not limited to: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to install a new NCC HVAC/CRAC unit in Building 602 on Channel Islands Air National Guard Station, Port Hueneme, CA 93041. Attend a Site-Visit to assess scope of work prior to quoting on this requirement. All work under this division shall be executed in a thorough professional manner by competent and experienced workmen licensed to perform the work specified. All work shall be installed in strict conformance with manufacturer's requirements and recommendations. Equipment and materials shall be installed in a neat and professional manner and shall be aligned, leveled, and adjusted for satisfactory operation. Material and equipment shall be new, shall be of the best quality and design, shall be current model of the manufacturer, shall be free from defects and imperfections and shall have markings or a nameplate identifying the manufacturer and providing sufficient reference to establish quality, size, and capacity. Material and equipment of the same type shall be made by the same manufacturer and be Underwriters Laboratory (UL) Listed. Provide the following supply with install: 5.2.1 Secure electrical power at source by lock-out/tag-out for the rooftop condensing unit and the indoor CRAC unit in the computer room. 5.2.2 Recover all refrigerant from the existing system and properly dispose of at exchange facility. 5.2.3 Disconnect, demo and remove all copper refrigerant lines, rooftop condensing unit and indoor CRAC unit from site and properly dispose of. 5.2.4 Furnish and install (1) new Split System DX CRAC Unit (Leibert Model#VS070AZA1E0NQVO or equivalent) that includes Microprocessor with Touchscreen Controller, Factory Disconnect, Dual Scroll Compressors, Steel Frame, R454B Refrigerant, Zone Leak Detection, 460V 3PH. 5.2.4.1 Up to 30-ton cooling with variable capacity control 5.2.4.2 Upflow configuration 5.2.4.3 Supports glycol economizer coils 5.2.4.4 Component redundancy 5.2.4.5 AHRI certified 5.2.5 Install new roof-mounted Condensing Unit (Leibert M#MCM080E5AD2DT5 or equivalent) with Factory Discon…
Classification
Place of Performance
Contracting Office
Contacts