AI Summary
Description
This contract is for the removal of the existing Duro-Last roofing system. The Contractor shall supply and install a new, complete membrane roofing system, providing all necessary components and materials to ensure a watertight, warranted system. The new roofing system to be warranted (20-year minimum), installed with quality craftsmanship, and free of leaks at the time of acceptance by the Government.
Classification
Place of Performance
Contracting Office
Contacts
Attachments (3)