Description
Page 4 of 4 Page 1 of Page 1 of This market research notice is being conducted by Network Contracting Office (NCO) 17- VA South Texas (VASTHCS) facilities. The Central Texas Veterans Health Care System (CTVHCS) requires repairs to the existing steam tunnel system at the Olin E. Teague Veterans Medical Center. This Statement of Work (SOW) defines the labor, equipment, tools, materials, testing, installation, waterproofing, electrical replacements, insulation replacement, documentation, and all confined space work required to complete the project in accordance with VA standards and all applicable federal, state, and local codes. SCOPE OF WORK The Contractor shall provide all labor, materials, tools, equipment, transportation, supervision, testing, confined-space entry procedures, and commissioning required to: Repair water intrusion damaged tunnel sections, risers, and vaults. Waterproof the tunnel system to reduce future water intrusion. Replace missing or damaged insulation. Replace light bulbs or fixtures that cannot be repaired. Repair leaking discharge pipe. Remove all debris from tunnel. Conduct all work inside steam tunnels in compliance with OSHA 29 CFR 1910.146 Permit Required Confined Space requirements, VA safety policies, and CTVHCS safety procedures. Pertinent VA files, drawings, and reference materials will be provided to the Contractor. All information must be field verified by the Contractor. Data provided by the Government is not guaranteed to be complete. Contractor shall follow all VA standards and codes located at: http://www.cfm.va.gov/TIL/. DETAILED REQUIREMENTS 3.1 Structural Repairs A. Waterproofing of Risers, Vaults, and Manholes: Install new waterproofing on all risers at vaults and service manholes. Install backer rod and joint filler using approved equivalent materials: Sika Backer Rod and Sikaflex Construction Sealant. Seal all joints and cracks exhibiting water intrusion. Remove deteriorated concrete from joints. Install SIKA Swellstop or Alchemy Spectec (or VA approved equal). Install waterproof protection over all repair areas. Concrete Work: Remove all spalled concrete. Install concrete surface repair using a thin patch material comparable to QUIKRETE Quick Setting Cement. C. Insulation Work: Replace missing or damaged insulation with Calcium Silicate or equivalent. Electrical Repairs The Contractor shall replace the following electrical components inside the tunnel system: Replace unserviceable lights with LED equivalents. Replace fixtures as needed with approved models including Lithonia Lighting DMW2, Killark MBF131, and incandescent fixtures where required. Responses shall include: Business Name Business Address Point of Contact Name Phone Number E-mail Address SAM UID Number Currently registered in SAM (Yes or No). If Yes, provide expiration date. NAICS code Business Size: Small or Large Type of Business: Service-Disabled Veteran Owned (SDVOSB), Veteran Owned (VOSB), 8(a), HUBZone, Woman-Owned (WOSB), etc. GSA …
Classification
Contracting Office
Contacts
Attachments (1)