AI Summary
Description
Pre-solicitation Notice For MIDWEST CITY WATER TOWER Midwest City, Oklahoma County, Oklahoma This is a PRE-SOLICITATION NOTICE for the construction of a Water Tower and associated infrastructure for Midwest City, Oklahoma. TH IS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to construct a new water tower for Midwest City, Oklahoma. The proposed design-bid-build project will be procured as an unrestricted, firm-fixed price contract in accordance with FAR 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted. Project Description: Midwest City (MWC)is developing a high-pressure zone to improve the low pressures within the southeastern portion of the water distribution system (WDS) and proposed improvements that include the following, and incidental related work: Construction of a new 500,000-gallon elevated storage tank (EST), including associated piping, electrical, controls, and site improvements. Construction of a new high service pump station (HSPS), including associated piping, electrical, controls, and site improvements. Work includes shoring and dewatering practices as required, and as indicated in the Contract Documents. Construction of approximately 650 linear feet of new 12-inch ductile iron pipe from the new EST access road to the existing pipe connection on Timber Ridge Blvd. Work includes all pipe fittings, valves, restraints, traffic control, and site repairs. Work to complete the piping reconfiguration at the existing Titan Tower Tank site, including approximately 100 linear feet of 18-inch ductile iron pipe, 80 linear feet of 16-inch ductile iron pipe, pipe appurtenances, and pipe reconnections. Reconfiguration of distribution system piping at the corner of 15th Street and Westminster Road, including a new connection from the 24-inch water main on the west side of Westminster Road to the 12-inch water main on the north side of 15th Street. All erosion and sediment control devices, device maintenance, construction stormwater permitting, and stormwater management throughout construction. Close required isolation valves to isolate the Timber Ridge Zone while coordinating the valve work with the Owner. The estimated magnitude of construction for this project is between $10,000,000 and $25,000,000. The North American Industry Classification System code for this procurement 237110 (Water and Sewer Line and Related Structures Construction) which has a small business size standard of $45M. The Product Service Code is: Y1NE (Construction of Water Supply Facilities) Estimated duration of construction of this project is 450 calendar days. Anticipated solicitation issuance date is on or about…
Classification
Place of Performance
Contracting Office
Contacts