AI Summary
Description
Amendment 1 issued September 15, 2026 The Contractor shall demolish and remove existing guard booths located at perimeter entry/exit Gates 2 and 3 at the IRS Austin Campus (see attached map). The Contractor shall furnish all labor, equipment, materials, and supervision necessary to deliver and install two (2) 4' x 4' Durasteel, bullet-resistant guard booths meeting Interagency Security Committee (ISC) Level IV or higher standards. The Contractor is responsible for field measurements, verification of site conditions, and full compliance with this SOW. (SOW Attached).
Classification
Place of Performance
Contracting Office
Contacts